Nasir Ahmad

Nasir Ahmad

Surveyor

Followers of Nasir Ahmad431 followers
location of Nasir AhmadSaudi Arabia

Connect with Nasir Ahmad to Send Message

Connect

Connect with Nasir Ahmad to Send Message

Connect
  • Timeline

  • About me

    Project Engineer (Tahakom) PrimeGate for Communications and IT

  • Education

    • Rawalpindi Polytechnic Institute

      2007 - 2010
      DAE Civil Civil Engineering
    • Utman Public School Topi Tarbela

      2003 - 2005
      DAE civil engineer Mathematics
  • Experience

    • GRC (Ghulam Rashool and Co.) pakistan

      Feb 2008 - May 2009
      Surveyor

      1) Prepare and maintain sketches, maps, reports, and legal descriptions of surveys in order to describe, certify, and assume liability for work performed.2) Verify the accuracy of survey data, including measurements and calculations conducted at survey sites.3) Direct or conduct surveys in order to establish legal boundaries for properties, based on legal deeds and titles. Record the results of surveys, including the shape, contour, location, elevation, and dimensions of land or land features.4) Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.5) Prepare or supervise preparation of all data, charts, plots, maps, records, and documents related to surveys. Show less

    • Nazir and Company (pvt.) Limited Lahore, Pakistan

      Jul 2009 - Nov 2011
      Site Supervisor

      Accomplishes construction human resource objectives by selecting, orienting, training, assigning, scheduling, coaching, counseling, and disciplining employees; communicating job expectations; planning, monitoring, appraising job contributions; recommending compensation actions; adhering to policies and procedures.Manages sub-contractors by locating, evaluating, and selecting sub-contractors; monitoring and controlling performance.Meets operational standards by contributing construction information to strategic plans and reviews; implementing production, productivity, quality, and customer-service standards; resolving problems; identifying construction management system improvements.Meets construction budget by monitoring project expenditures; identifying variances; implementing corrective actions; providing non-project annual operating and capital budget information.Accomplishes construction project results by defining project purpose and scope; calculating resources required; establishing standards and protocols; allocating resources; scheduling and coordinating staff and sub-contractors; evaluating milestone assumptions and conclusions; resolving design problems; evaluating and implementing change orders.Approves construction projects by conducting inspections at critical phases; obtaining approvals from buyers. Prevents fines and interruptions by complying with, and enforcing, codes.Maintains safe, secure, and healthy work environment by following and enforcing standards and procedures; complying with legal regulations.Updates job knowledge by tracking and understanding emerging construction practices and standards; participating in educational opportunities; reading professional publications; maintaining personal networks; participating in professional organizations.Enhances organization reputation by accepting ownership for accomplishing new and different requests; exploring opportunities to add value to job accomplishments. Show less

    • Nour Communications Co. Ltd.

      Sept 2012 - Apr 2015

      • Monitoring of trenching machine at the time of trench excavation. • Installation of ducts and sub ducts from main hole to main hole and to the customer buildings.• Spacer, warning tape, concreting up the sub ducts and asphalting.• Mind riling of sub ducts priors to the roof shooting and cable polling.• Installation of Corrugated pipe, Sub Duct, Cable Laying, Main Hole installation.• Using 3M EMS Locator for Main Whole Searching.• Using RD-4000 and 7000 for Cable Locating.• Have Good skill of R-D Reading.• Monitor all phases of construction to ensure that standards, specifications and scope of work are met.• Able to read , interpret and implement all constructions drawings, Single line diagram, • Conduit inspection on the materials received during the construction phase randomly • For compliance to standard and specifications and for possible damages. • Carry out final survey at the site and make red line as-built drawings prior to the final inspection.• Technical skills and computer literacy gained through operations, technical support and planning roles and continued in depth exposure to new technologies.• Leadership skills demonstrated through direction and example in adverse circumstances.• Supervisor and employee development skills developed through managing personnel.• Instruct the team for next day plain/schedule.• Supervision for manholes installations, conduit & cable lying. • Coordinate with vender inspector for the work to be done.• Submit materials samples to the project vender Q/C inspectors.• Submit the report to the work construction control deportments.• Coordinate with project vender regarding the sail testing to done on the completed job site. Show less Manage the whole operation of the workshop including logistics and machine maintenance. Support all Project manager of the Department which is engaged in Telecommunications outside plant (OSP) projects like “2000 km fiber optic underground installation” and ARAMCO projects. Directly responsible in scheduling the route of 5 units Trailer-trucks to transport heavy equipment’s to Riyadh-Taif-Najran-Dammam-Jeddah and other sites. Receive the machine requirements of the project and plan for the proper utilization of 5 units Bulldozer with Plough and Ripper, 5 units Rock- breaker/Excavator, 5 units Underground Horizontal Directional Drilling machines, 12 units Tesmec Trencher (Chain-saw and Rock-saw), 3 units Water-truck, 10 units mobile workshops, 2 units Isuzu long-truck, 7 units Dump-truck, 2 units Splicing van and other small vehicles of the company. Provide and arrange transportation for the site materials. Manage the purchasing personnel. Coordinate with the material suppliers for the location and schedule of delivery of materials.Provide safety materials for the job site. Prepare proper monitoring sheet for equipment and labor rental suppliers and other project monitoring sheets. Audit the expenses of Chief mechanic and maintenance supervisor and maintain proper record for which machine each expense. Supervise 25 personnel under the workshop and monitor 15 heavy duty truck drivers for the site. Perform other duties in emergency call to solve site problems regarding accident, theft, and other issues. Show less

      • Site Supervisor

        Oct 2013 - Apr 2015
      • Logistic coordinator

        Sept 2012 - Apr 2015
    • SAAR microSystems Pvt Ltd

      Aug 2018 - Oct 2020
      OSP Site Civil Engineer

      • Safety Insure • Daily check site Progress • Equipment Hour Meter • Material Arrangement• Coordinate with BTC and GPT (Main Contractor) Inspectors.• Check the work standardly on daily basis.• Report to management on a Daily and Weekly basis by WhatsApp and Email.• Attending meetings with the BTC on a Weekly basis.

    • PrimeGate for Communications and IT

      Oct 2018 - Oct 2020
      Team Leader / Site Engineer

      Civil Supervisor:Duties:• Management of site operations.• Submit the report to the work construction control departments.• Contractor’s representative for completed work order.• Monitor all phases of construction to ensure that standards, specifications and scope of work are met.• Able to read, interpret and implement all Civil, FOC and FJS drawings, Single line diagram, wiring diagram, and interconnection diagram.• Conduit inspection on the materials received during the construction phase randomly for compliance to standards, codes, and specifications and for possible damages. Responsibility: • Survey before implementation with owner.• New route survey with consult.• Coordinate with subcontractor.• Check the work standard on daily bases.• Check the safety on site.• Coordination with the owner.• Coordination with owner regarding the material and inspection.• Red line • Cross check Sub-Con. Invoices against the done Work Orders.• Daily reporting to management.Saudi INT’LTEC April 2015 to Till to DateProject Coordinator ITC-FDT-06, 05 -Riyadh Reg.• Submit the report to the work construction control departments.• Responsible for keeping records of new installations/parameter changes.• Able to handle all tools and test equipment required for installation and commissioning.• Supervising Sub-Contractors Activities• Daily/Weekly Reporting• Installation of ducts and sub ducts from main hole to main hole and to the customer buildings.• Spacer, warning tape, concreting up the sub ducts and asphalting.• Mind riling of sub ducts priors to the roof shooting and cable polling. Show less

    • Al Rajhi Telecom

      Nov 2020 - Mar 2022
      Site Engineer -OSP
    • PrimeGate for Communications and IT

      Apr 2022 - now
      Project Engineer
  • Licenses & Certifications

    • DAE Civil