Taqwa Wibowo

Taqwa Wibowo

Mechanic Assistant

Followers of Taqwa Wibowo360 followers
location of Taqwa WibowoJakarta, Jakarta, Indonesia

Connect with Taqwa Wibowo to Send Message

Connect

Connect with Taqwa Wibowo to Send Message

Connect
  • Timeline

  • About me

    Testing & Inspection

  • Education

    • STT-PLN

      2001 - 2007
      Bachelor's degree Mechanical Engineering

      Activities and Societies: 1. Head of Committee Student of Engineer Faculty 2. Head of Committee Meet and greet new comer social student activity for mechanical engineering major in organization college

  • Experience

    • PT. ROLL POWER

      Feb 2002 - Aug 2006
      Mechanic Assistant

      - To assist Mechanic staff Overhaul Genset Diesel - To clean material component throughout Machine- To purchase materials needs- To Adjust installation of Genset

    • PT. MITRA LINGKUNGAN DUTA CONSULT ( Consultant)

      Jan 2008 - Sept 2010
      Reporting Power Plant

      - Reporting Project Control Power Plant (Coal fire)- Monitoring and calculate cash flow project- Monitoring progress project based on schedule- Quality control and check progress on site.- Maintenance & troubleshooting, startup, internal commissioning test Diesel generator.

    • PT. EUROASIATIC

      Oct 2010 - Sept 2014
      Construction Engineer

      ● Supervise and monitoring project installation of Power Plant. ● Manage relationship between customer and contractors. ● Ensure that contractors doing installation in accordance with the drawing design. ● Ensure that contractors doing installation in accordance with the ● Manage administrative activity (permit to work and safety regulation). ● Manage and monitoring cash out flow budget during project. ● Prepare Planning & Construction Schedule. ● Prepare Lifting Procedure. ● Prepare erection sequence for Gas Engine Parts Equipment. ● Coordinate the supervisors to execute the job based on the erection procedure. ● Determine the equipment which used on construction activity. ● Determine and estimate tools and consumables. ● Plan and control man power loading. ● Plan and control man power loading. ● Prepare Gas engine Part and External Piping Progress Report to client. ● Control permanent material. ● Prepare pipe line check and punch list based on P & ID and Isometric Drawing. ● Prepare Test Package for piping systems, piping hydrostatic and pneumatic test. ● Coordinator for piping systems, piping hydrostatic & pneumatic test. ● Prepare Turn Over Package for Gas Engine Power Plant. ● Coordinate with QA/QC for Inspection (alignment, welding quality and lifting procedure). ● Performing and supervising tests with Penetrate NDT Test. ● Interpreting and evaluating results according to applicable codes, standards and specifications. Show less

    • Self employed

      Sept 2014 - now
      Staf
  • Licenses & Certifications

    • Ultrasonic Testing

      PT. MSS FOR ASNT
      Jun 2014
    • Liquid Penetrant Testing

      PT. MSS for ASNT
      Feb 2014
      View certificate certificate
    • Magnetic Particle Testing

      PT. MSS FOR ASNT
      Feb 2014
      View certificate certificate