VICTOR AKEJU Engr. (COREN)

Victor akeju engr. (coren)

bookmark on deepenrich
Followers of VICTOR AKEJU Engr. (COREN)357 followers
  • Timeline

  • About me

    Senior Civil/Structural E3D & PDMS Designer Engineer at Shell

  • Education

    • Nigeria red cross

      -
    • Shell open university

      2019 -
    • Onshore and offshore safety institute

      2022 -
      Certificate on safety stages 1 2 & 3 safety officer
    • Nigeria red cross

      2023 -
    • The polytechnic of ibadan

      2005 - 2007
      Civil engineering civil engineering upper credit
  • Experience

    • Intecon partnership limited

      Feb 2000 - Mar 2018
      Cad designer engineer
    • Mott macdonald nigeria limited lagos

      Feb 2010 - Sept 2011
      Civil/structural cad designer

      The Mott MacDonald Group is a diverse management, engineering and development consultancy delivering solutions for public and private clients world-wide.Our breadth of skills, services and global reach across all markets makes us uniquely placed to bring our customers:PROJECT WORK ON:Mott MacDonald Nigeria limited Lagos. (February 2010 - 2012) PROJECTS EXECUTED: OML 58 BLOCK/UPGRADE Conceptual, Front End Engineering (FEED) and Detailed Engineering Design of Gas Pipeline Project. Operated by TOTAL E&P Nigeria Ltd, is located in Nigeria, at some 75km North-West from Port Harcourt, close to the villages of OBITE and OGBOGU. DETAILED ENGINEERING- The main objective of the detailed engineering project involves the Development of the Obagi (OSC) Operation and Security Camp. Show less

    • Cakasa (nigeria) company limited

      Jun 2015 - Dec 2015

      Ogini-Eriemu Export Pipeline (FEED)Activities carried out:• Prepare foundation design for Pig launchers, Receiver and to ensure that they can carry the anticipated load from the equipments.• Check the foundation layout drawings prepared by the designers. • Prepare MTO for the foundation..PROJECTS EXECUTED: OKAN GGCP DEBOTTLENECKING PROJECTThe Okan field is located offshore within OML-96 in about 25 feet of water, 11km into Escravos bay. Okan GGCP currently dehydrates both associated gas (AG) and Non Associated Gas (NAG). The associated gas is from Okan Production Platform while the NAG source is from two NAG wells, OK-33 and OK-72. The NAG is the main gas supply to Okan field gas lift network. Show less

      • Senior CAD Designer

        Jun 2012 - Dec 2015
      • Senior Civil/Structural Cad Engineer

        Jun 2015 - Jun 2015
    • Planet projects ltd

      Jul 2017 - Apr 2019
      Senior civil/structural cad designer engineer

      PLANET PROJECTS LTDInfrastructure Development in Transport is a fundamental pre-condition to achieving a sustainable transportation system around the world. It’s a vital tool to increasing a nation’s competitiveness and positioning it for a rapid economic growth and development. Looking around the world, one key feature in developed and developing economies is the presence of high-tech developed transport infrastructure.Planet Projects’ infrastructure practice combines deep knowledge of individual asset classes—road transport, rail transport and water transport—with discrete practical expertise. By drawing on insights from other industries and applying best-practice tools and methodologies developed through client work, we bring a fresh perspective to complex problems within the transport industry. Planet Projects is committed to providing standard and modern transport infrastructures such as bus shelters & lay byes, bus depot, mega terminal, bus parks, jetties, Traffic System Management (TSM)PROJECTS EXECUTED: 1. DESIGN OF THE RECONSTRUCTION/UPGRADE OF MURTALA MUHAMMED INTERNATIONAL AIRPORT ROAD, IKEJA, LAGOS.2. LAGOONVIEW DEVELOPMENT SCHEME, CHEVRON DRIVE, LEKKI LAGOS.3. DESIGN OF THE RECONSTRUCTION OF OSHODI - ABULE EGBA BRT LAGOS.4. JUNCTION IMPROVEMENT WORK AT FAJUYI INTERSECTION EKITI STATE.5. OGUN STATE PUBLIC TRANSPORT (PT) PROJECT JUNCTION IMPROVEMENT WORK.6. JUNCTION IMPROVEMENT WORK AT ALAPERE ROUNDABOUT LAGOS (JIW) WITH HORIZONTAL AND VERTICAL PROFILE.7. JUNCTION IMPROVEMENT WORK AT OPEBI, OREGUN LINK BRIDGE ROAD LAGOS.8. JUNCTION IMPROVEMENT WORK AT IKOTUN ROAD LAGOS.9. DESIGN OF AND CONSTRUCTION OF BERGER BUS TERMINAL LAGOS STATE 10. DESIGN OF BUS REFORM AROUND LAGOS STATE 11. DESIGN, CONSTRUCTION AND SUPERVISION OF OSHODI TERMINAL 1, 2 AND 3 Show less

    • Shell nigeria limited

      Apr 2019 - now
      Senior civil/structural e3d & pdms designer engineer (coren) at shell

      The Assa North field situated some 70km northwest of Port Harcourt is located in SPDC’s OML 21 with some of its reservoirs in communication with SEPLAT OML 53 reservoirs where it is called Ohaji South. Assa North-Ohaji South is a unitized asset by DPR regulations because of its communicating reservoirs. A Preliminary Unitization Agreement (PUA) of 50:50 between SPDC JV and Chevron JV was signed hence SPDC and SEPLAT (who bought OML 53 over from Chevron) JVs will equally share the inventory production for processing in separate plants. The Assa North-Ohaji South Unit Partners are currently engaged in efforts to develop hydrocarbon resources in Oil Mining Licence (OML) 21 and 53 reservoirs for supply of processed gas and condensate to several customers in the domestic gas market. The Upstream facilities consisting of Wells, manifolds and flowlines is jointly owned and funded by SPDC and SEPLAT JVs.The Shell Petroleum Development Company (SPDC) Ltd. is designated as Operator for the upstream facilities by a Unitization and Unit Operating Agreement (UUOA) signed in 2013, to develop the estimated 4.3 Tcf of gas and 197 MMstb of condensate from the fields. The primary (dew-pointed) gas destination for SPDC is the domestic gas export market via the OB3 East-West interconnecting pipeline whilst a secondary evacuation route for the dehydrated gas is to NLNG via an Obite – Assa multiphase pipeline. The primary destination for condensate is a proposed refinery to be built adjacent the SPDC Gas Plant. A tie-in to the existing Egbema-Assa line will provide a secondary evacuation route for the condensate through the Trans Niger Pipeline (TNP) to Bonny Oil Gas Terminal. A 3rd evacuation route is planned for the condensate through spiking the liquid into dehydrated gas. The following roles were performed by me on the project.; Maintain Quality Control of all Structural Discipline deliverables Review all Discipline deliverables Check and review/verify vendor documents. Show less

  • Licenses & Certifications

    • | registered engineer

      The council for the regulation of engineering in nigeria, coren
    • Nigeria association of technologists in engineering (nate)

      Nate nigeria association of technologists in engineering (nate)
      Feb 2020
    • Environmental, health and safety certifications (beac)

      Onshore and offshore safety institute
      May 2022
    • Certified dfa designated first aider by (shell training institute port harcourt river state)

      Shell
      Mar 2023
    • Member, nigeria red cross society date registered

      Nigerian red cross society
      Jan 2023
    • Certified power boi by (shell training institute port harcourt river state) 2024

      Shell
      Jan 2024