Leigh Perry

Leigh Perry

Tester including Levels Mod 5, 3c and 3b/4

Followers of Leigh Perry175 followers
location of Leigh PerryLiverpool, England, United Kingdom

Connect with Leigh Perry to Send Message

Connect

Connect with Leigh Perry to Send Message

Connect
  • Timeline

  • About me

    Project Engineer and Functional Tester (Secondary Role). Currently working on Trans Pennine Route Stage W1 and W2A

  • Education

    • Audenshaw High School

      1991 - 1996
  • Experience

    • Sitec

      Mar 2003 - Oct 2010
      Tester including Levels Mod 5, 3c and 3b/4

      Joined as an Assistant Tester in 2003 and managed to propel myself to a IRSE licensed Verification Tester in 2005. I managed to step up again in 2007 to a IRSE licensed Functional Tester (Mod3b/4). Unfortunately Sitec went into insolvency and I was subsequently made redundant.

    • OSL/UNIPART RAIL

      Feb 2011 - Feb 2011
      Factory Testing of Wainfleet Level Crossing REB in York

      I Strap and Functioned tested all Level Crossing circuits within the REB. This was done with the aid of a Temporary 24v Power Supply. This included testing many circuits with several parallel paths with Stick and Latched relays

    • Colas Rail

      Mar 2011 - Mar 2011
      HABD PHASE 3 RENEWALS PETERBOROUGH

      I was lead tester of the new HABD equipment fitted on some sites on the East Coast Mainline. I carried out controlled changeovers with the aid of a 17th edition qualified person. I then powered up the new HABD cabinet and upgraded the correct software and then made sure the modem was speaking with the LSI (Control Centre) and then installed the correct parameters within the system for the specific site. I checked that all scanners and rail contacts were in working order, once up on running I put a heat source on the scanners and made sure the system would alarm at certain temperatures and corresponded alarms back to the Signal Box. Show less

    • OSL/S

      Jun 2011 - Sept 2011
      East Kent Resignalling Phase 1

      I lead the Testing of Axle Counter Equipment for this project. I carried out the numerous cable tests required including Cross Talk Tests/Meggering/TDR and transmission testing. I also powered the heads up and set them up accordingly and corresponded all Axle Counter heads back to the Signal Box.

    • OSL/Inve

      Jan 2012 - Apr 2012
      Water Orton Signalling Phase 2

      I was leading the testing of an SSI interlocking for a particular area. This included pre-testing all equipment associated within my area leading up to the commissioning. I lead the local functioning of all REB's and Locations Cases within my interlocking and followed that up by through testing to other location cases and to the new panel.I also functioned all the 4ft equipment such as AWS,TPWS and electrically tested Points

    • OSL/S

      Aug 2012 - Nov 2012
      HERTFORD National Integration Facility Project

      Leading a team in verification testing of all location cases and external equipment including the Insulation Testing of all Lineside and Tail cables.I was also leading the functional testing of all Location Cases and tested the associated 4ft equipment such as AWS, TPWS, and LED Signals along with their associated Route Indicators and Position Lights

    • OSL/

      Jan 2013 - Dec 2013

      I was leading the testing of an SSI interlocking for a particular area. This included pre-testing all equipment associated within my area leading up to the commissioning. I lead the local functioning of all REB's and Locations Cases within my interlocking and followed that up by through testing to other location cases and to the new panelI was also leading the functional testing of all Location Cases and tested the associated 4ft equipment such as AWS, TPWS, and LED Signals along with their associated Route Indicators and Position Lights Show less

      • SLOUGH

        Sept 2013 - Dec 2013
      • Nottingham Resignalling

        Jan 2013 - Nov 2013
    • OSL/

      Jul 2014 - Aug 2015
      SASR SWINDON

      I had overall command in looking after a whole interlocking area. This included prep testing each location case and associated trackside equipment and then locally functioned circuitry where possible in preparation for the Commissioning. This included setting up the Interrogator and Generator to imitate outputs and monitor inputs coming back from the equipment or dummy loads. I had to manage all paperwork such as Circuit Diagrams/Certification and Test Logs etc... and regularly liaising with the TIC's for progress reports.I also lead teams in enabling and then rehearsing equipment such as AWS/TPWS and signals in preparation for the Commissioning. Show less

    • OSL/ALSTOM

      Jan 2016 - Apr 2018
      BASRE Stages 2 and

      I had overall command in looking after a selection of Interlockings. This included prep testing each location case and associated trackside equipment and then locally functioned circuitry where possible in preparation for the Commissioning. This included setting up the Interrogator and Generator to imitate outputs and monitor inputs coming back from the equipment or dummy loads. I had to manage all paperwork such as Circuit Diagrams/Certification and Test Logs etc... and regularly liaising with the TIC's for progress reports.I also lead teams in enabling and then rehearsing equipment such as AWS/TPWS and signals in preparation for the Commissioning. Show less

    • OSL Rail Ltd

      Apr 2017 - Mar 2021

      I have been carrying out Functional Testing since 2007. I have a good understanding of strap and functioning most circuits within the rail industry and have completed and passed my RRI (Route Relay Interlocking) course. I' am competent in a wide range of equipment. Including Axle Counters, DC Tracks, EBI Digital TI's, Reed Tracks, Conventional and LED Signals, AWS, TPWS, HABD's. SSI Systems, Ansaldo systems and other Miscellaneous equipment. As of 2019 I have been working on the Electrologixs system on the Norwich to Lowestoft. I have been working in a systems capacity deploying firmware and data within the Electrologixs VPM-3 and altered parameter settings for the UPS and Condition Monitor. Show less

      • Signalling Engineer (Functional Tester)

        Mar 2010 - Mar 2021
      • Waterloo - Wessex Improvement Programme

        Apr 2017 - Aug 2017
    • OSL/Network Rail

      Aug 2018 - Feb 2019

      Carrying out Preparation work for the new EBI tracks and Signal Heads to be commissioned. This involved hand tracing all the old Reed Track wires in Preparation of Changeover.On the Commissioning I was in charge of the Negative Bonding Plan throughout the job. This consisted of wheeling out measurements and inspecting bonding. A new section of OLE was installed which required an upgrade of Track Circuits. EBI200 Digital Track Circuits were fitted. I was responsible for Bonding checks, Earth testing Location Cases and Structures. I also tested a selection of the EBI200 Tracks and corresponded them back to the panel. A new section of OLE was installed which required an upgrade of Track Circuits. EBI200 Digital Track Circuits were fitted. I was responsible for Bonding checks, Earth testing Location Cases and Structures. I also tested a selection of the EBI200 Tracks and corresponded them back to the panel.

      • TRP Redhill to Brighton

        Nov 2018 - Feb 2019
      • Wallsall OLE Upgrade

        Aug 2018 - Nov 2018
      • Walsall OLE Works

        Aug 2018 - Nov 2018
    • OSL/ATKINS

      Aug 2019 - Dec 2019

      I was a team leader on the Commissioning. I was tasked with doing all the required measurements on the Scheme Plan and Corresponded various pieces of equipment such as Signals, Aws's and TPWS in conjunction with the Principle Testers. I also led a team carrying out Through Circuit Testing between Location Cases I have been working on the Systems side of the job. I have been working on the Electrologixs System. This consisted of installing firmware on various pieces of equipment including the VPM-3, UPS and Condition Monitor, I also was deploying Data and setting up various parameters for each piece of hardware. I had a spell in the Signalling Centre liaising with principles in checking alarm status's and corresponding with Teams out on the ground.

      • Lewis to Newhaven

        Nov 2019 - Dec 2019
      • Norwich - Lowestoft

        Aug 2019 - Dec 2019
    • SNC-Lavalin Atkins

      Mar 2021 - May 2022
      Signalling Engineer (Functional Tester/Systems Tester)
    • Siemens

      Sept 2021 - now
      Project Engineer and Functional Tester (Secondary Role)
  • Licenses & Certifications

    • Signalling Functional Tester

      Institution of Railway Signal Engineers
      Dec 2017