Eugene Nadela, RME

Eugene Nadela, RME

Process Engineer

Followers of Eugene Nadela, RME412 followers
location of Eugene Nadela, RMECalabarzon, Philippines

Connect with Eugene Nadela, RME to Send Message

Connect

Connect with Eugene Nadela, RME to Send Message

Connect
  • Timeline

  • About me

    Manager at Nissan Philippines Inc.

  • Education

    • Adamson University

      1992 - 1997
      Bachelor of Science (B.S.) Mechanical Engineering

      Activities and Societies: Wood Pusher Society

    • Adamson University

      1992 - 1997
      Bachelor of Science in Mechanical Engineering Mechanical Engineering
  • Experience

    • Daeduck Philippines Inc.

      Jan 1998 - Jun 1999
      Process Engineer

      Key Accomplishment􏰁 Increased productivity and machine capacity by 100% from 4 layer to 8 layer stacking of Heat sink Lamination by modifying fixture and developed new machine parameter to accommodate 8 layer stacking.􏰁 Developed and implement new specification for Heat sink Lamination to improve quality and productivity.􏰁 Develop and implement new line layout for Assembly and Inspection Line to balance work flow.􏰁 Optimized equipment setting to produced high quality product.

    • Nidec Philippines Corporation

      Oct 1999 - Sept 2005
      Assistant Supervisor

      Handled the following positions:􏰁 Asst. Supervisor – Process Engg. Group􏰁 Sr. Process Engr. – Proc Engg Group 􏰁 Products Engr. 3 – Engg. Division􏰁 Line Engineer 3 – Prod. DivisionKey Accomplishment􏰁 Supervised Process Engineering team in Defect Reduction activity through the use of Six Sigma tools. This resulted to a 80% defect reduction from 20% to 4% defect rate and increased in product yield by 20% from 80% to 96%.􏰁 Developed and implement defect monitoring and triggering point system to monitor sudden increase of defect and able to sustained defect rate at nominal level.􏰁 Received award citing contribution to the company, including the Best Project in Cost Reduction Initiative which recognized the Php 12 million savings generated for the company through the use of newly developed process and optimized machine parameter settings for Scrap Recovery. Show less

    • FORD Motor Company Philippines Inc.

      Sept 2005 - Jan 2013
      Quality Process Engineer / Launch Engineer / ISO-QOS Engineer

      Key Accomplishment􏰁 Six Sigma Greenbelt project lead for the Replication of Pull and Drift Test inside the plant which achievedthe following improvement.- Generated cost saving with a total amount of Php 2.5 Million on manpower reduction, reduced gasoline consumption and eliminate cost on vehicle insurance.- Increased productivity rate by 77% from 30 min/unit to 7 min/unit. - Reduced warranty repairs by 63% from 22.06 to 8.06 Repairs / 1000.􏰁 Lead the team for implementing standardized area reporting in Daily Quality Meeting in order to address Quality Issues on Top Management and discuss corrective action report effectiveness. Achieved 64% increase in First Time Through from 53% to 87%.􏰁 Successfully lead the team for passing ISO 9001 Audit Re-Certification with International Certifying Body (Vehicle Certification Agency).􏰁 Negotiated with Ford Asia Pacific and Africa (APA) and international certifying body Vehicle Certification Agency to do the verification audit via teleconference instead of shop floor audit which resulted to $3500 cost reduction on Travel and Hotel Accommodation.􏰁 Successfully lead the team for passing ISO 14001 2nd Surveillance audit which resulted to a two consecutive year without Non-conformances.􏰁 Increased detection rate of Squeak and Rattle concerns by 500% from 0.04 Defects/unit (2/50) to 0.24 Defects/unit (12/50) by developing and implementing a new method of inspection and relocation of inspection process suitable for detecting Squeak and Rattle issue.􏰁 Conceptualized, designed and implemented New Squeak and Rattle test track. This allowed the team to detect many issues on Squeak and Rattle inside the plant resulting to 80% reduction on Warranty Repairs from 25 repairs/1000 to 5 repairs/1000, also achieved increase in Customer Satisfaction by 25% from 48% to 60%. Show less

    • Terumo Philippines Inc.

      Jun 2013 - Dec 2013
      Assistant Manager - Injection Molding
    • Nissan Philippines, Inc.

      Jan 2014 - Sept 2024
      • Assistant Manager

        Oct 2020 - Sept 2024
      • QA Specialist

        Jan 2014 - Sept 2020
    • Nissan Philippines Inc.

      Oct 2024 - now
      Manager
  • Licenses & Certifications