Bakhytzhan Yermekov

Bakhytzhan Yermekov

Electrician Transformer Shop

Followers of Bakhytzhan Yermekov1000 followers
location of Bakhytzhan YermekovKazakhstan

Connect with Bakhytzhan Yermekov to Send Message

Connect

Connect with Bakhytzhan Yermekov to Send Message

Connect
  • Timeline

  • About me

    Alstom - Industrial Project Manager

  • Education

    • КазАТК

      2005 - 2009
      Бакалавр Электроэнергетика
    • КСТУ

      2009 - 2012
      Бакалавр Юриспруденция
  • Experience

    • Kazakhstan Temir Zholy NC JSC

      Aug 2009 - Dec 2012
      Electrician Transformer Shop

      Performance of separate simple works on repair and maintenance of electrical equipment.Installation and repair of junction boxes, terminal blocks, safety guards.Cleaning and purging with compressed air of electrical equipment with partial disassembly, washing and wiping of parts.Cleaning contacts and contact surfaces.Cutting, splicing, insulation and soldering of wires up to 1000 V. Laying of installation wires and cables.Performing simple plumbing, installation and carpentry work in the repair of electrical equipment. Connect and disconnect electrical equipment and perform simple measurements.Check and measurement of insulation resistance of distribution networks of stators and rotors of electric motors, windings of transformers, inputs and outputs of cables.Position Deputy Head of Traction substationCarried out periodic inspections and maintenance of equipment and devices traction substation.Carried out major repairs and works to strengthen the substation in accordance with the annual plan. He issued orders for the production of works, the leadership of the team and direct participation in the works.Instructed crews, made control of observance of technology. Monitored compliance of workers with industrial and labor discipline, rules and norms of labor protection, safety and industrial sanitation.Performed inspection and testing of protective equipment according to safety regulations.Ensured proper storage and use of tool materials and inventory.Replaced the head of the substation in his absence.He was on duty in the shift during vacations and illnesses of the staff on duty.Combined engineer for Traction substationsDisassembly and Assembly of relays of simple electrical measuring instruments and equipment of direct and alternating current, the mechanical part of simple relays and measuring instruments. Show less

    • ЕВРАЗ

      Nov 2013 - Sept 2014
      Specialist instrument control

      * Commissioning of European equipment manufacturers such as Siemens at the Evraz Caspian Steel rebar plant.* Equipment testing (up to 1000 V) under load and without. Work with project documents, drawings and diagrams.• Control the operation of measurement devices (maintenance of pressure sensors, flow meter, temperatures.) * Monitoring compliance with safety regulations * Inspection of works in accordance with the Electrical and Instrumentation project. * Increase the efficiency of the company due to the quantity and quality of work performed design department; * Very well know how to read single-line, primary, secondary and operational electrical scheme. Show less

    • - The Department of justice of Kostanay

      May 2015 - Nov 2016
      Lawyer

      1.Inspector 2.Assistant Bailiff 3.Inspector-Registrar for information references 4.Senior specialist on contracts from

    • - Department of land cadastre and technical survey of real estate-branch of non-profit joint stock

      Nov 2016 - Dec 2017
      Ingineer HSE

      * Carried out control over observance of the current legislation, instructions, rules and regulations on labor protection, safety, industrial sanitation, fire protection and environmental protection at the enterprise.* Developed draft plans to improve working conditions.* Developed measures to create safe and healthy working conditions, rational modes of work and rest, taking into account the specifics of production, performance dynamics, periodicity of human physiological functions.* Participated in the inspection of the technical condition of the equipment, determining its compliance with the requirements of safe operation, in necessary cases, in accordance with the established procedure to take measures to terminate its operation.* Monitored the operation of ventilation systems, the condition of safety devices and protective devices.* Developed programs to train workers in safe working methods, to organize propaganda and study by employees of the enterprise of safety regulations, industrial sanitation and fire protection.* Conducted briefings of employees of the enterprise, and also to supervise their carrying out, to organize check of knowledge of workers.* Participated in the investigation of accidents of industrial and non-industrial injuries, professional and non-professional diseases, to study their causes, to analyze the effectiveness of measures to prevent them.* Controlled correctness of drawing up of applications for overalls, special food, protective devices, etc., timeliness of issue to workers of means of individual protection, and also expenditure by the enterprise of appropriations for labor protection and safety. Show less

    • CHI Electric LLP

      Feb 2019 - Aug 2020

      * I work as a responsible person for the implementation of construction and installation works and for maintaining ITD (Executive and technical documentation) at the objects of the FGP project.* Organized and conducted pre-inspection meetings* Inspection and testing of E & I installations according to customer's drawings* Review of vendor suitability and reports* Preparation of documents and sending all necessary documents to the Client* Complete the verification with the QA / QC client according to the approved ITP and perform the QVD accordingly.* Performed on-site QA / QC inspection.* Prepared and reviewed field inspection reports.* Prepare internal perforated lists and coordinate with the site Manager to close all internal perforated lists raised by QA / QC.* Checked e & I material inspection according to customer / project requirements •View and maintain records of calibration and testing of on-site testing equipment.* Controlled the correctness of inspection and testing according to customer approved e & I drawings.* Handled concession requests and non-compliance reports.* Developed quality control measures and trained personnel where there are requirements.• Developed the project ITP and procedures.* Carried out ongoing construction work to ensure that the installation is carried out in accordance with customer and ROK standards.* Compliance with operating procedures.* Accounting and reporting on its quality management activities. Show less * Inspection of works in accordance with the Electrical and Instrumentation project. * Preparation of check sheets and acts for signature. * I work as a responsible person for the implementation of construction and installation works and for maintaining ITD (Executive and technical documentation) at the objects of the FGP project.* Sending a report on completed electrical work. • Know the norms according to GOST and SNiP. * Installation of electrical equipment; * Installation of heating cable. • Control the operation of measurement devices (maintenance of pressure sensors, flow meter, temperatures.) • Glendive,detaching kabalai commissioning; * Laying of power cables and cables; * Design of work packages for instrumentation and Electrical engineering; * Development, modification and creation of drawings of any complexity; * Procedure of delivery of documents of the performed works; * Calculation of electrical parameters to select the necessary equipment; * Calculation of voltage drop to select the desired cross-section of electrical cables; * Calculation of outdoor and indoor lighting; * Calculation of electric heating. * Increase the efficiency of the company due to the quantity and quality of work performed design department; * Very well know how to read single-line, primary, secondary and operational electrical scheme. * Worked with electrical appliances multimeter Fluke 28 II, Fluke179, megger Fluke 1550c, micrometer, cable printer ProMark T-1000, Metrel, AID-70, Viola for high voltage test, power meter Uni-T, Retom-21. Show less

      • QA/QC Inspector

        Feb 2019 - Aug 2020
      • Technical electric

        Feb 2019 - Jun 2019
    • INFRA DEL PROJECTS

      Aug 2020 - Jun 2021

      * Technical control of electric motors, generators, transformers, compensators and equipment conservation.* Technical inspection of two-phase and three-phase high voltage generators.* Checking asynchronous motors and checking the implementation of appropriate conservation measures.* Completion of checklists and equipment damage reports.* Checking the condition of pressure gauges and measuring devices. Replacement as needed.* Measurement of insulation resistance with a megohmmeter and preparation of acts on the state of insulation based on resistance measurement* Application of silica gel and other similar substances to areas where condensation occurs.* Ability to calculate the amount of silica gel required for equipment. * Carrying out technical inspection and work with electrical equipment and mechanical equipment containing electrical components.* Knowledge of the features of asynchronous electric motors.* Ability to read and understand drawings and specifications and requirements related to the performance of the work.* Ability to identify hazardous factors.* Ability to work with power tools and hand tools.* Ability to work with equipment under pressure. Show less

      • Electric Engineer

        Jan 2021 - Jun 2021
      • Electrical and Instrumentation Inspector

        Aug 2020 - Jan 2021
    • Novus Bolashak

      Jun 2021 - Mar 2024

      Daily monitoring and analysis of the “System Completion Management Tool” (SCMT) database.Making an order for electrical materials. Receiving of materials. Preparation of an admission order,Conducting HSE briefing and Work Instructions every morning before the start of the work for Team.I make sure that the staff understood exactly the task, feedback, discussion with each member of theteam about the state of health and emotional state. Site control of task execution: mounting and• To achieve the tasks set by the project, I am experienced user and use the following TCO programsand TCO databases: System Completion Management Tool (SCMT); FGP 3GP Systems CompletionCertification Portal; Facility Engineering Data Website (FED); Coreworx Project Collaboration;Completion Management System (CMS); Walkdown System; 3GP Full Punchlist; LUN Register; 3GP Show less

      • Electrical Execution Engineer

        Mar 2023 - Mar 2024
      • Senior Technical Electric

        Nov 2022 - Feb 2023
      • Technical electrician

        Jun 2021 - Nov 2022
    • Alstom

      Apr 2024 - now
      Industrial Project Manager

      Facility Manager - responsible for creation of equipment strategy, defining the preventive maintenance plan and scope of work for whole equipment in the workshop. - Achieving high grade regarding the tools and facilities management during the audit. Putting into operation of several projects: low and high voltage area. From the layout development till the installation and certification of equipment.

  • Licenses & Certifications

    • DraftSight - DraftSight

      Alstom
      Jun 2024
      View certificate certificate
    • SWAH

      SEFtec Global Training LLC
      Sept 2024
    • In recognition of contribution and commitment to HSE and MSW performance at Tengizchevroil's 3GP facility.

      Тенгизшевройл
      Feb 2022
    • H2S OPITO

      SEFtec Global Training LLC
      Sept 2024
    • Energy Isalation

      SEFtec Global Training LLC
      Sept 2024
    • HSE Induction

      SEFtec Global Training LLC
      Sept 2024
    • ESR+FA

      SEFtec Global Training LLC
      Sept 2024