Rafael Inzunza

Rafael inzunza

bookmark on deepenrich
location of Rafael InzunzaMexico
Phone number of Rafael Inzunza+91 xxxx xxxxx
  • Timeline

    Jan 1376 - Nov 1377

    Manufacturing Engineer

    Price Pfister (Black & Decker)
    Nov 1377 - Jun 1382

    Manufacturing Engineer

    Honeywell automotive
    Jan 1382 - Jun 1387

    Manufacturing Engineer

    Invensys Controls
    Mar 1392 - Sept 1395

    CNC Production Manager

    Amphenol Optimize
    Nov 1392 - now

    Program Manager

    Creation Technologies
    Current Company
    Nov 1395 - now

    Engineering Manager

    UTC Aerospace Systems
    Mar 2007 - Jul 1392

    Operations Manager

    Lancer Orthodontics
  • About me

    Engineering Manager at UTC Aerospace Systems

  • Education

    • Humantech inc.

      1388 - 1388
      Ergonomics expert ergonomics diploma

      Ergonomics basics and workstation evaluation for a safety place.

    • Cetys universidad

      1388 - 1388
      Project management certificate business administration and management, general diploma

      Project management

    • Uabc, mexico

      1366 - 1371
      Engineer's degree mechanical engineering

      Electro Mechanical Engineering

  • Experience

    • Price pfister (black & decker)

      Jan 1376 - Nov 1377
      Manufacturing engineer

      Work together with design department to introduce new products, design and implement new production lines according to annual forecast, make new processes qualifications, production training, make field test product.Engineering changes introduction to production as a normal duties, plus productivity improvement projects as well.

    • Honeywell automotive

      Nov 1377 - Jun 1382
      Manufacturing engineer

      When I worked as a Manufacturing Engineer with Honeywell turbocharge, my position was to work together with design department in order to release new products making manufacturing work instructions, CNC programs, processes layout, Capability studies, Gage R&R with new gages, visual aids, production employees training and together with quality department, PPAP documentation. Another duties was to analyze processes capability, design new production cells, new machinery qualification, develop and provide production training, release production part numbers together with all PPAP steps. Also, I worked on continuous improvement projects where set up time, scrap and productivity were improved using 6 sigma technique, and some others from Lean Manufacturing. نمایش موارد کمتر

    • Invensys controls

      Jan 1382 - Jun 1387
      Manufacturing engineer

      As a manufacturing engineer, I worked different roles, first project was introducing a new machining process to our company, where new machines where qualified, moved and installed at Mexicali building, plus all process documentation was created, Work sheet instructions, capability studies, Gage R&R, Job safety Analysis, Quality process plan, PFMEA, Min-Max system for new cutting tools on use, preventive maintenance program, hiring and training plan for new employees. During second project, maintenance improvement was assigned to me to reduce downtime and develop preventive maintenance routines coordinating maintenance engineers. Third project, Improve production performance on new assembly line, where downtime was attacked and improved, some production machines were improved, people were trained and some production performance tracking reports were implemented. Project impacted was 100% improvement on production output. Last project, machining processes transferred from Long Beach,Ca to Mexicali,Mexico. Very active member on design of new layout in Mexicali building with machining processes in. Coordinate activities to assure machines requirements were installed before receive machines, plus a new coolant consumption reduction project was developed and implemented to reduce coolant costs from $1M to 300k yearly. نمایش موارد کمتر

    • Amphenol optimize

      Mar 1392 - Sept 1395
      Cnc production manager

      Manage resources to fulfill customer production demands on time, producing parts with high quality and using effectively company resources.

    • Creation technologies

      Nov 1392 - now
      Program manager

      Be in contact with customer to see their forecast and future demand in order to make production schedule, coordinate raw materials to arrive on time, and lead production employees to assure quality and productivity. When a new product and/or customer was assigned to me, I took care of design and coordinate all activities to release new assembly lines according to customer's specification, doing capability studies and/or Gage R&R for testing equipment. Also, responsible of quote new products per customers request. نمایش موارد کمتر

    • Utc aerospace systems

      Nov 1395 - now
      Engineering manager
    • Lancer orthodontics

      Mar 2007 - Jul 1392
      Operations manager

      Coordinate all production activities to make orthodontics parts per Sales department demand, taking care of production costs, scrap, productivity and maintenance activities to keep machinery available for production and avoid downtime. Manage ES&H department to assure a working place free of injuries. Also coordinating activities to have our company according to safety and environmental Mexican laws. Finally, teamwork with quality department to assure our company works per FDA, ISO 9000 and CSA regulations to keep their certifications in our products. نمایش موارد کمتر

  • Licenses & Certifications

    • Ergonomics

      Humantech