Veera Kumar Rajendran PMP®

Veera Kumar Rajendran PMP®

Electrical Engineer

Followers of Veera Kumar Rajendran PMP®785 followers
location of Veera Kumar Rajendran PMP®United Arab Emirates

Connect with Veera Kumar Rajendran PMP® to Send Message

Connect

Connect with Veera Kumar Rajendran PMP® to Send Message

Connect
  • Timeline

  • About me

    Project Engineer at Mideast Data System UAE

  • Education

    • Nanjiah lingammal polytechnic college

      2006 - 2009
      Diploma in Electrical and Electronics Electronics and Communications Engineering

      Electrical and Electronics Engineering

    • As govt high school alangombu sirumugai

      2001 - 2006
      High School

      Activities and Societies: football

    • Birla Institute of Technology and Science

      2012 - 2015
      Bachelor's Degree Electrical and Electronics Engineering

      I'm studying final year BS ENGINEERING TECHNOLOGY .

  • Experience

    • Lakshmi Machine Works Ltd

      Jan 2009 - Jan 2011
      Electrical Engineer

      testing and commissioning of spinning machine's and over all LV system's maintenance .

    • WinStar ElectroMechanical Equipment Installation & Maintenance LLC

      Jan 2011 - Mar 2015
      Electrical Engineer

      • Dubai Airport overall testing of switchgears, dry type transformer , CT,VT , Power transformer , Aux transformer , SMDB ,Ring Main Unit, Scheme checks , functional checks , REF stability and sensitivity testing . • Committed to HSE requirements and all applicable legislations and contractual.• All kind of site Installation and co-ordination with consultant, main contractor, subcontractor and supplier attend weekly progress meeting. • Controlling a team of foreman, Technicians, Supervisors and conducting safety meeting and following safety procedures in site.• Leading testing team with support and assistance on work.• Involved in maintenance of cooling plant 11 KV Switchgear panels.• MV cable testing for Dubai airports projects.• Execution, Installation, testing and maintenance of low voltage system SMDB, DB, UPS, ECBS, Lighting & Small power.• Involved in operational maintenance and trouble shooting of HT panels, MCC panels & DBs.• Maintaining Test records/Drawings and following 100% safety compliance.• Preparation of pre-commissioning check lists, test reports, as built drawings, cable schedules and detailed commissioning schedules for the above mentioned systems.• Observe the Site condition to Planning day to day testing and commissioning activities and arranging resources for the timely completion of testing and commissioning activity, controlling and monitoring test report approval process, De-snagging and handover process. •overall testing of 33/11 kv switchgears CT,VT , Power transformer , Aux transformer , SMDB ,Ring Main Unit, Scheme checks , functional checks , REF stability and sensitivity testing . Show less

    • Larsen & Toubro

      Mar 2015 - Dec 2024
      Sr.Electrical Engineer

      • Leading testing team with support and assistance on work.• Overall testing of 33/11 kv GIS&AIS Power transformers, auxiliary relays, main power cables, CT,VT , AUX,POWER transformer testing , SCMS,DMS Signal checks , RMU ,SMDB,DB, LDB, EMDB testing • Control of given work force at site and get the work done within target.• Controlling a team of foreman, Technicians, Supervisors and conducting safety meeting and following safety procedures in site.• Coordinate with consultant regarding the inspection.• Coordinate with civil defense inspection in UAE and System approval.• Raising inspections and clearing them from the consultants, and verifying the comments raised from consultant. Also clearing the snag work given by the consultant. • All kind of site Installation and co-ordination with consultant, main contractor, subcontractor and supplier attend weekly progress meeting. • Ensuring work is executed in accordance with the approved drawings and specifications.• Co-ordinate with supplier and sub-contractors about the progress.• Committed to HSE requirements and all applicable legislations and contractual.• Referring technical catalogues for materials knowledge and submittal for material order.• Observe the Site condition to Planning day to day testing and commissioning activities and arranging resources for the timely completion of testing and commissioning activity, controlling and monitoring test report approval process, De-snagging and handover process.• Maintaining Test records/Drawings and following 100% safety compliance.• Preparation of pre-commissioning check lists, test reports, as built drawings, cable schedules and detailed commissioning schedules for the above mentioned systems Show less

    • Mideast Data Systems

      May 2022 - now
      Project Engineer
  • Licenses & Certifications

    • Project Management Professional (PMP)

      Project Management Institute
      Dec 2024
  • Volunteer Experience

    • TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS

      Issued by Dubai Airports on Apr 2012
      Dubai AirportsAssociated with Veera Kumar Rajendran PMP®