Anant Singh

Anant Singh

Summer Intern

location of Anant SinghKanpur, Uttar Pradesh, India

Connect with Anant Singh to Send Message

Connect

Connect with Anant Singh to Send Message

Connect
  • Timeline

  • About me

    Executive trainee @NPCIL AIR 67 GATE EE'24

  • Education

    • Sunbeam english school bhagwanpur Varanasi

      2018 - 2020
      Intermediate PMC 94.4%

      Activities and Societies: Awarded Sir Newton award for best in physics in session 2019-2020. Participated in Indian Institute of metals (IIM) metals and materials quiz organized by department of metallurgical engineering, IIT BHU in session 2019-2020

    • Harcourt Butler Technical University

      2020 - 2024
      Bachelor of Technology - BTech electrical engineering 8.2 CGPA

      Activities and Societies: Cricket, Volleyball,Table tennis

  • Experience

    • NTPC Limited

      Jun 2023 - Jul 2023
      Summer Intern

      NTPC Auraiya gas power plant is combined cycle plant where 4 units of gas turnine generator(GTG) generates electricity(based on Brayton cycle) and waste heat is used to make steam to generate electricity via 2 units of steam turbine(based on Rankine cycle). Plant is divided into 2 module and each module has 2GT and 1ST and 1WHRB(waste heat reuse boiler). Total plant capacity is 663.36MW where each GT has capacity of 111.19MW and each ST has capacity of 109.3MW.Fuels which are used in this plant are natural gas and Naphtha. In main plant, there is 4 GTG Transformer of capacity 148MVA each and there is 2 STG Transformer of capacity 144MVA each. Transformer step up voltage from 11KV(generating voltage) to 235KV.There is ground solar plant of 24MW DC capacity and 20MW AC capacitycapacity as well. Apart from this, there is floating solar plant of 27.5MW DC capacity and 20MW AC capacity. Show less

    • Nuclear Power Corporation of India Limited(NPCIL)-Official

      Aug 2024 - now
      Executive Trainee
  • Licenses & Certifications