ismail azzouz

Ismail azzouz

bookmark on deepenrich
Followers of ismail azzouz3000 followers
  • Timeline

  • About me

    Site Engineer responsible of all the preparation of rollout activities in Ericsson Algeria for all telecom accounts

  • Education

    • University of sciences tlmcen

      1989 - 1994
      Engineer electronics

      Electonics engineer

    • « institut des sciences exactes » tlemcen -algeria

      1989 - 1994
      High school diploma electronics engineer studies; mathematics
  • Experience

    • Sitel (algeria)

      Jun 2000 - Jul 2005
      Supervisor

      ofInstallation, test and acceptance of RBS 2000 familyInstallation and test of AXE10 and AXE810 equipment (APZ 21225,21230,21233, APG40, IOG20) . -

    • Sitel

      Jun 2000 - Jul 2005
      Test egineer

      Responsible of Installation and test of AXE 10 switchesintegration of RBS 2000 family

    • Lacom (algerian consortium of telecommunication)

      Jan 2001 - Jan 2008
      Radio and transmission site engineer

      3. Company

    • Ericsson algeria

      Jul 2006 - Aug 2010
      Core engineer

      4. Company: ERICSSON ALGERIA/ ERICSSON ALGERIA Supervision of installation, Integration, Acceptance and troubleshooting of RBS 2000 family (2202, 2206, 2106, 2302, 2308).Maintenance on RBS 2000 family ( Replacing DXU, CDU, DTRU) Installation and test of Transmission equipment MINI LINK.Audit quality installation of Radio and Transmission and Switch.Supervision of installation of AXE810 equipment and APG40.Upgrade APG40 to AGM 18 SW level.Extension BSC and TRC.Installation of SoftSwitch (TES) for AlgerieTelecom. عرض أقل

    • Ericsson

      Oct 2007 - Aug 2010
      Core network engineer

      I have big experiance in installation intergration and configuration and trouble shooting of RBS 2G (2000 family)2206, 2216 2116, 2308, 2309, 2111 and other.I'm responsible of integration of Ericsson nodes expansion ( BSC;MSC)Installation new softawre update ( MSC,SCP,HLR)responsible of installation of IN nodes ( SDP,CCN,IVR,AIR..)

    • Ericsson education tunisia

      Aug 2009 - Mar 2010
      Installation supervisor

      Responsible for the installation of Ericsson equipment (MSS, Charging system, power solution EPDU, GGSN, SGSN, MPBN)

    • Tunisie telecom

      Aug 2009 - Mar 2010
      Ericsson tunisia

      Supervision of installation of: Core platform MSS (APZ 21250, APG40, MGW R5). OSS CCN (NSP 5.0)Power solution Actura Flex and NetSureFor Orange Tunisie:

    • Ericsson algeri

      Jan 2011 - Jan 2013
      Site engineer
    • Ericsson algeria

      Apr 2013 - now

      Responsable sur toutes les activités de préparation du rollout pour le compte des opérateurs Télécoms

      • Site Engineer

        Jun 2022 - now
      • Installation and integration support for 3G roll out project

        Apr 2013 - Jul 2022
    • Ericsson

      Jun 2022 - now
      Site engineering

      • SPOC with SDU India team for SSR validation working on SDE tool.• Bill of material (BOM) delivery according to the High-level design and the solution description.• Sanity checks of the global bill of quantity before proceeding with shipment.• Part of the IBS solution representing the Engineering Team.• Supporting the ASP on site to ensure that the installation is according to Ericsson standards.

  • Licenses & Certifications

    • Les fondements de la gestion de projet : l'intégration

      Linkedin
      Feb 2025
      View certificate certificate