Sal Marchetti

Sal Marchetti

Manager of Projects/ Polymer Projects

Followers of Sal Marchetti1000 followers
location of Sal MarchettiCarlsbad, California, United States

Connect with Sal Marchetti to Send Message

Connect

Connect with Sal Marchetti to Send Message

Connect
  • Timeline

  • About me

    Projects Director

  • Education

    • University of Pennsylvania

      1947 - 1951
      B.S. Chemical Engineering

      B.S. in Chemical Engineering

    • Drexel University

      1963 - 1964
      Bachelors in Chemical Engineering Graduate Chemical Engineering

      Masters studies in Chemical Engineering

    • University of Pennsylvania

      1947 - 1951
      BS in Chemical Engineering Chemical Engineering B

      Activities and Societies: Alpha Chi Sigma Professional Fraternity B.S. in Chemical Engineering

  • Experience

    • Honeywell (Allied Chemical Corp)

      Jun 1951 - Jun 1971
      Manager of Projects/ Polymer Projects

      Brainstormed and directed engineering and construction within a Profit Improvement Program which in two years doubled the capacity of the PVC resin plant at half the original capital cost that returned the plant to profitability.Designed and constructed the Halon PTFE (Teflon) plant from pilot plant data in 18 months, launched Allied's venture into Teflon.Area Project Manager for Polyethlene wax plant in Orange, texasPlant Engineer for Baker & Adamson (B&A) fine chemicals plant in Marcus Hook, PAIn Chemical Control, mproved plant yields by 25% for DDT insecticide plant within B&A. Show less

    • General Atomics

      Sept 1973 - Apr 1975
      Process Heat Development Manager

      Directed conceptual designs and feasibilty studies of Process Heat applications for the HTGR. Modified the nuclear Scope of Supply to include a Helium to Helium Heat Exchanger within the PCRV , suppllying heat to an Intermediate Loop containing reformers and process steam generator.

    • Fluor Corporation

      Jan 1975 - Feb 1997

      Nuclear, Energy, EnvironmentalProject Director for Tank Farm Remediation Project at Hanford site, providing oversight to a major subcontractor charged with consolidating and concentrating high level waste liquids and sludge as feed to the eventual waste vitrification plantDirected 54 projects over a five year period for the DOE Miscellaneous Projects at the Idaho Chemical Processing Plant at INEL, within all budgets and on time.Won Quality Award from DOE in meeting hot startup of the highly enriched spent fuel reprocessing plant, doing 12 months work in 3 months on an accelerated basis.Area Project Manager on Hanford Waste Vitrification Project to convert nuclear waste into glassified logs inside stainless steel canisters destined for Yucca Mountain Repository,Project Director of various conceptual designs utilizing SASOL and LURGI tecnology for conversion of coal to SNG and liquid fuels within the Western U.S and British Columbia.Was Area Project Manager on the Gas Centrifuge Enrichment Project (GCEP) at Oak Ridge and Portsmouth.Area Manager for the WESCO synfuels plant designed for Four Corners, New Mexico Show less

      • Project Director

        Apr 1975 - Feb 1997
      • Prpject Management

        Jan 1975 - Jan 1997
    • Keller Williams Realty, Inc.

      Jan 1995 - Jan 2000
      Project Manager
    • Hi-Z Technology, Inc.

      Jun 1999 - Dec 2011
      Projects Manager

      Business Development and Planning

    • Fluor TRS

      Apr 2012 - now
      Projects Manager./Consultant

      New Business Development

  • Licenses & Certifications

    • B.S. in Chemical Engineering

      University of Peradeniya
  • Honors & Awards

    • Awarded to Sal Marchetti
      Proposal Manager For Life Fluor Corporation Sep 1990 Colleagues presented a plaque to me citing my performance in preparing and directing a multitude of winning proposals and presentations to government agencies over a 12 month period.
    • Awarded to Sal Marchetti
      Quality Award from DOE Department of Energy, Idaho National Energy Laboratory Nov 1983 Received Quality Award for performing 12 months work in three months at a high level of Quality in preparation for hot startup of highly enriched spent fuel dissolution process.
    • Awarded to Sal Marchetti
      Letter of Commendation U.S. Navy, Commanding Officer, North Island Jun 1958 Received commendation from Commanding Officer for having Ground Controlled Approach (GCA) Unit Number 4 at a high level of readiness on the air continuously 24 hours per day 7 days a week for entire 2 1/2 year assignment as Maintenance Officer GCA Unit Four