Mohammad Asghar Abbasi

Mohammad Asghar Abbasi

Civil Works Supervisor

Followers of Mohammad Asghar Abbasi64 followers
location of Mohammad Asghar AbbasiIslāmābād, Pakistan

Connect with Mohammad Asghar Abbasi to Send Message

Connect

Connect with Mohammad Asghar Abbasi to Send Message

Connect
  • Timeline

  • About me

    Civil Engineer & Entrepreneur

  • Education

    • Center of Advanced Studies in Engineering

      2007 - 2008
      Diploma in Engineering Project Management Project Management

      Project ManagementTechnical Management

  • Experience

    • M/S KIER INTERNATIONAL & MUSAAD AL SALEH

      Jan 1982 - Jan 1983
      Civil Works Supervisor

       Construction of Phase-I (120 Km Expressway from Baghdad to Syria border). Via Abu Ghraib - Ramadi & Flooja. Construction of 30 staff housing Villas for client representative, Ministry Housing and works. Surveying demarcation to establish site offices, residential accommodation camp for workers, construction of foundations for pre-fabricated office and camp complex. Construction of staff mess facility. Surveying demarcation for 30 nos, Client representative residential Villas ,excavation of foundations, placement of foundation concrete, backfilling ,placing of grade slabs, supervision of masonry structure and roof concreting. Show less

    • M/S AL-HUSSAINI (ADA) KINGDOM OF SAUDI ARABIA

      Jan 1983 - Jan 1988
      Civil Works Supervisor

      PROJECT (1) KING KHALID MILITRY CITY HAFR AL BATIN.PROJECT (2) INTERNAL SECURITY FORCES HOUSING PROJECT HAFR AL BATIN. King Khalid military city and internal security forces housing projects are mega residential projects for Kingdom internal security forces and a Military Camp for K.S.A Armed forces and GCC countries armed forces joint headquarters, comprises on approximately 13000 housing units Military school, official offices for armed forces, Kindergarten schools, boys and Girls high schools, college, hospital, ladies health club, Overhead water storage Tanks and underground water distribution network. Sewerage treatment plant, library building, Clinics, Parks, and all supportive infrastructure facilities, both unique projects were designed and supervised by American corps of Military Engineers. Construction supervision of Residential and school buildings structures, masonry works, internal plumbing, electrical works, backfilling flooring, internal & external finishing, hardscape paving for driveways. Supervision and Management of Precast yard as additional responsibility, to produce the precast concrete Elements for the project to enhance the productivity rate and to save the time and, item casted in precast yard includes. Sewerage Concrete shafts of different diameters, doors and windows RCC lintol beams, Windows cills, etc. Construction supervision of Roads, Sanitary sewerage, and concrete paving mass concreting. Show less

    • M/S QURESHI BUILDERS

      Jan 1988 - Jan 1991
      Civil Supervisor

       Construction supervision of Abbottabad Township on Mansehra Road Internal External Roads, sewerage and storm drainage pipelines and manholes. Construction of concrete walkways, preparation of measurement sheets for the work done

    • DHABI CONTRACTING & STROJEX PORT IIB (JV)

      Jan 1991 - Jan 1994
      Site Engineer

      Client: U.A.E Armed Forces Construction of Al Dhafra Air Base sewerage and storm drainage pipelines, sewerage pump stations, lifting stations, Manholes. 500mm-400mm-300mm 200mm GRP- and 300mm PVC pipe lines, Construction of 52 Nos. Non-disruptive road crossings 300 mm-800mm dia using thrust boring methodology and steel pipe casing. Construction of Sewage pump station, and all house connection for offices and residential buildings. Construction of 12 ammunition depo, Auditorium building, firing/ shooting range, obstacle course for cadet training purpose, 5 floor 60 feet’s high rise tower building with rock cladding feature for cadet training. Construction of 12 Residential Blocks 4 floor buildings for about 4000 personals accommodation officer mess, canteen/tuck shop, with allied infrastructure services roads parking’s footpaths, sewerage pipelines, manholes septic tanks soak a ways. Construction of Vehicle parking sheds, automotive repairing workshops and vehicle washing Service bays. Show less

    • PARSONS ENGINEERING SCIENCE ABU DHABI/OMAN

      Jan 1994 - Jan 1998

      CLIENT: ABU DHABI MUNCIPALITY-SEWAGE PROJECT COMMITTEE (SPC)  Responsibilities includes the construction supervision of 2.4M dia RCC storm drainage pipe line construction to drain out the surface water flooding from East & west Baniyas to Musaffah in to the sea side through outfall Pumping station. Construction supervision of Non-disruptive micro tunneling under Abu Dhabi Taarief and Musaffah Abu Dhabi Carriage way.  Inspection and approval of all ongoing site activities preparation of daily weekly monthly progress reports for submission to SPC. Show less CLIENT: ABU DHABI MUNCIPALITY-SEWAGE PROJECT COMMITTEE (SPC) Supervision of 400 million U.A.E Dirhams Mega storm drainage and subsoil drainage lowering project which include construction of major detention basin, Embankment rip rap over the embankment slopes, 3 KM (2.4) M dia triple Rcc pipe line, 4 Km 2.4 M dia twin and single Rcc pipe lines. Approx. 15 Km lateral pipe lines of various dia meter,  PVC perforated French drains allied manholes, junction chambers structure, and Pump station outfall pressure main pipe line. Show less

      • Civil Engineer

        Jan 1997 - Jan 1998
      • Senior Inspector Civil Works

        Jan 1996 - Jan 1997
      • Senior Inspector Civil Works

        Jan 1994 - Jan 1996
    • Parsons International Limited Dubai

      Jan 1998 - Sept 2006
      Assistant Resident Engineer

      Assist design office team for collection of complete site data and Preparation of preliminary design, and contract documents for infrastructure services projects.Liaison with Dubai Municipality Land and planning department to acquire the land, assist Municipal authorities for removal of existing encroachments cattle’s and goat farms, relocation of existing grave yards in coordination with Dubai court ,Dubai police department, and Dubai Municipality.Supervision of survey team to demarcate the project boundaries to secure the land as per Master plan.Approval of the Water, Electricity, Etisalat telecom fiber optic network plan from relevant departments prior to commence the construction activities at site. Liaison with above department on day today basis for progress of the ongoing works and timely testing commissioning of the services to meet the project completion targeted dates and to handover the completed villas to the customers as committed by Emaar. Inspection and approval of ongoing works, reply of the contractors Technical quarries RFIs verification of approved works. Supervision of earthworks to ensure all grades and levels are properly achieved for infrastructure and villas construction.Approval of Electricity drawings/plan from (DEWA) and Construction of Substations, laying underground Hv-lv power cable lines installation of Transformers in coordination with Dubai Electricity & water Authority (Dewa).Construction of Irrigation lakes and pump station to irrigate the golf course. Supervision of construction caddy path with in golf course areaPreparation of detail snag list upon completion of the each contract package, supervision to de snag the works, handover the completed works to Client facility management department ,Provide full technical support to client during defect liability period of the project if any defect and or technical issue ariseProvide complete as built drawings operational and maintenance data to client Show less

    • PARSONS ENGINEERING SCIENCE ABU DHABI

      Jan 1998 - Jan 1999
      Senior Civil Engineer

      CLIENT: SEWAGE PROJECT COMMITTEE,ABU DHABI MUNCIPALITY Supervision of removal and rehabilitation of 12 Nos. artificial lakes (HDPE) liner and installation of underground subsoil drainage and gassing system under the (HDPE) liner. Installation welding of (HDPE) liner by wedge welding and extrusion welding techniques, leakage testing of the liner, testing commissioning and water filling. Supervision for construction of pump station to drain out under lake subsoil drainage water. Show less

    • Emaar

      Sept 2006 - Jul 2010

       Report and Assist to Senior Project Manager, Implement the awarded projects Contract with the Consultants supervision team and manage the day to day requirements and activities of the contracts. Coordinate and attend Project Kickoff meeting, ensure delivery of all Contract documents to contractor for timely commencement of works. Manage and direct consultants to ensure the execution of construction works as per contract specifications, budget and quality. Responsibility for successful execution of section of the work and to achieve revised program or milestone.  Management and coordination of the Project Management team Turner International. Report on decision affecting program budget and quality. Financial Management of Construction activities. Closely Monitored the Consultant and Contractor Activities. Attend all progress and coordination meetings and make decisions within authority. Ensured completion of the project with quality time and budget in compliance with d well assign documentation, drawing, specification, contract terms and conditions. Monitored and report on the progress of the work, as well as the performance of supervising consultant and key contracting staff. Checked and ensured the correct out of the project and demarcation, in accordance with approved plan and levels. Preparation &submission of monthly cost forecast, report, review of weekly and monthly reports submitted by consultants/contractor. Review of minutes of meeting, project related correspondence, also financial management, review and recommendation on contractors submitted monthly invoices final account to senior manager projects. Show less  Report and Assist to Senior Project Manager, Implement the awarded projects Contract with the Consultants supervision team and manage the day to day requirements and activities of the contracts. Coordinate and attend Project Kickoff meeting, ensure delivery of all Contract documents to contractor for timely commencement of works. Manage and direct consultants to ensure the execution of construction works as per contract specifications, budget and quality. Responsibility for successful execution of section of the work and to achieve revised program or milestone.  Management and coordination of the Project Management team Turner International. Report on decision affecting program budget and quality. Financial Management of Construction activities. Closely Monitored the Consultant and Contractor Activities. Attend all progress and coordination meetings and make decisions within authority. Ensured completion of the project with quality time and budget in compliance with d well assign documentation, drawing, specification, contract terms and conditions. Monitored and report on the progress of the work, as well as the performance of supervising consultant and key contracting staff. Checked and ensured the correct out of the project and demarcation, in accordance with approved plan and levels. Preparation &submission of monthly cost forecast, report, review of weekly and monthly reports submitted by consultants/contractor. Review of minutes of meeting, project related correspondence, also financial management, review and recommendation on contractors submitted monthly invoices final account to senior manager projects. Show less

      • Project Manager Infrastructure

        Sept 2006 - Jul 2010
      • Project Manager

        Sept 2006 - Jul 2010
    • Happy Homes Real Estate and Construction Islamabad

      Jul 2010 - now
      CEO

       Procurement of land for various size of the plots starting from 1000 sq feet to 4500 sq feet, liaise with architect to design the house, and approval from Capital development Authority (CDA) building control section to proceed with the construction. Approval from utility services authorities for connection of Water, electricity, gas and sewage following the rules and regulation sets by authorities. Procurement of construction material, to meet the completion time line controlling the budget for each project. Monitoring/supervision of execution of all construction activities, structure, electrical, plumbing works from foundation to the final finishing completion stage with quality time and budget. Show less

  • Licenses & Certifications

    •  Certificate of Achievement Visionary Leadership 2008.

    • Auto Cad

      Center of Advanced Studies in Engineering
      Jan 2008
    • Fire Safety

      Jan 2008
    • HSE Awareness

      Jan 2008
    • Sharp Start Management Training Parsons Dubai

      Jan 2005
    • Site Specific Hazard Recognition Training Parsons Dubai

      Jan 2005
    • Certificate of Recognition Honors 10 Years Distinguished services with Parsons

      Jan 2004
    • ISO 9001 Awareness Training Parsons International Dubai

      Jan 2004
    • ISO 9001 Awareness Training Parsons International Dubai

      Jan 2004
    • Certificate working in Confined Space(Parsons Abu Dhabi)

      Jan 1997