Muhammad Sohaib Farooq

Muhammad sohaib farooq

bookmark on deepenrich
location of Muhammad Sohaib FarooqIslāmābād, Pakistan
Followers of Muhammad Sohaib Farooq3000 followers
  • Timeline

  • About me

    Project Manager

  • Education

    • Cadet college hasanabdal

      2001 - 2006
      Fsc sciences

      Activities and Societies: I was in hiking and mountaineering club I was member of horse riding team I was debater I was member of handicrafts and calligraphy I participated in football basket ball cricket and athletic competitions. A cadet life teaches you discipline, good valued ethics and higher moral standards.

    • National university of sciences and technology (nust)

      2007 - 2011
      Bachelor's degree civil engineering

      Activities and Societies: I was a good debater. I was member of horse riding team. I was a good swimmer. And I was a good sportsman and athlete. My major was civil engineering and I graduated in B.Eng from NUST with good grades

  • Experience

    • Centaurus

      Jan 2011 - Jul 2011
      Internee site engineer

      Centaurus is one of the finest art of Atkins. After the completion of centaurus it will be second seven star hotel after burj ul arab which was also designed by atkins. The contractor of the centaurus is china state construction. The consultant firm was PROJACS Al-kuwait international.It is a joint venture of PAKGULF of Pakistan and Al-Tamimi of Saudi Arabia. The construction of centaurus involves alot of learning about modern methods of construction and requires alot of expertise and skills.

    • Frontier works organization

      Jul 2011 - Mar 2012
      Site engineer

      •Construction of 102 living rooms with attached baths, fabrication workshop, steel yard, material laboratory and miscellaneous items storage area, site offices at the main site, mess/dining, Office blocks for HSE,Mechanical,Civil,Electrical site and Office staff, along with OHWT and UGWT to cater the daily usage and construction of labor camp along with medical unit to handle uncertainties at site.•Successful Installation of the batching plant and tower cranes with all its allied facilities.•Security arrangements by construction of check posts at appropriate locations with search lights and building fence around the premises of the activity area for the site camp.•Looking after infra structure work for Drainage and sewerage systems and construction of earth dam to cater the shortage of water by retaining rain water in the dam and Helipad for special visit by delegation reviewing the progress of the project•Cut,fill and dressing of the earth and Anti-termiting prior to lean concrete for the main Terminal building.•Checking out the form works and its level at each step and getting the approval from the consultantSteel fixing as per Bar Bending Schedule for columns,beams and slabs.•Leading the survey parties and assigning them different tasks. •Coordination with procurement department to achieve construction items timely on site and with the Chief Manager Construction to keep up the current status of the working condition of the construction machinery. Show less

    • Kingcrete builders

      Mar 2012 - Nov 2014
      Construction manager

      •Looking after the management of medical gases i.e. supply of air, oxygen, nitrous and vaccum at each bed head unit as an aiding facility for the patient.•Looking for the design layout, interior and aesthetics features in coordination with the architect and RE.•Looking after atrium final specs details and design features.•Dealing with minor details of flooring, ceiling, MEP Fixtures and producing the shop drawings in time to make the progress steady to meet the dead lines and achieve targets.•Generating claims on behalf of contractor along with negotiation with sub-contractor on item rates to save cost on overall covered area and generating profit on work for the company and also documenting on account of reworks (change requests).•Heading weekly meeting for discussing progress of the work with the subcons to avoid delays and address their problems and issues.•Coordinating with client and consultant on progress delays if any and calculating the possible reasons for the delays and negotiating on the baseline program.•Monitoring and Controlling the variations not there in the contract, specs and detailed BOQ and documenting it for updating the baseline program and coordinating with the QS department for such change. •Coordinating MEP consultants with reference to reflected ceiling plans at site for AHU, FCU, chillers electrical cable trays, low voltage cabling, firefighting system (smoke detectors, heat detectors, hose real box system, fire hydrants,) BMS system, electrical wall drops and ceiling drops.•Looking after the civil activities of finishing like tile work, granite fixing including mechanical means to fix granite, GI wall framing for drywalls and then cladding with cement and gypsum boards followed by paint works. Show less

    • Civilco civil engineering & contracting company

      Nov 2014 - Apr 2017
      Sr. qa/qc engineer

      Looked after the grey structure of the building as Sr. QC engineer and delivered the progress meeting the baseline program as Sr. Site engineer. Monitored, controlled and executed civil and MEP activities with the Construction Manager and MEP contractor.Implemented and followed that the approved drawings are followed at site.Monitored the flow of activities is as per the timeline prepared and submitted to the client/consultant and try to stay ahead by planning it properly.controlled and checked the steel details are in accordance with the approved structural and IFC drawings.Maintained the quality of the works as per the project specs and PQP and got the approvals from the consultant and avoided non conformance to the works.Looked after the distribution of the men power for the daily activities completed at site as per the baseline program.Monitored and controlled the materials required and used at site during different stages of the project.Implemented and checked that the correct methods of statement approved by the consultant were followed at site.Documented and raised inspections as per the approved ITPs.Monitored and controlled the Logs of IRs, MIRs, technical submittals, test result as per the frequency in the project specifications, MEP CLs and all site related documentsPrepared Method statement to execute the various activities at site for any particular job as per contract specifications and requirements and submit to the Consultant for review and approval.Submitted third party reports for consultant review and approval. Show less

    • Asgc

      Apr 2017 - May 2020
      Senior quality assurance quality control engineer
    • Kingcrete

      Jun 2020 - Sept 2021
      Deputy project manager
    • National logistics cell (nlc)

      Sept 2021 - now
      Project manager
  • Licenses & Certifications

    • Pmp

    • Resume

      Resume
      Sept 2011
  • Volunteer Experience

    • i worked as a volunteer in earth quake affected areas of Pakistan

      Issued by edhi foundation on Oct 2008
      edhi foundationAssociated with Muhammad Sohaib Farooq