Shih James

Shih James

HVAC Electro-Mechanical Engineer

Followers of Shih James32 followers
location of Shih JamesTaichung City, Taichung City, Taiwan

Connect with Shih James to Send Message

Connect

Connect with Shih James to Send Message

Connect
  • Timeline

  • About me

    MEP/HVAC Project Engineer

  • Education

    • ASHRAE

      1983 - 1985
      HVAC Engineering Certificate Heating, Air Conditioning, Ventilation and Refrigeration (HVAC)
    • The George Washington University

      1981 - 1982
      Engineer's Degree Engineering Administration
    • Chung Yuan Christian University

      1971 - 1975
      Bachelor's Degree Mechanical Engineering
  • Experience

    • Syska Hennessy Group; HDR Inc.; Bechtel Inc.

      Jan 1980 - Dec 1990
      HVAC Electro-Mechanical Engineer

      My work began with the total cooling load and load for each room calculation according to the location of the project and ASHRAE handbook. Determined the capacities required for whole building and each room and make a selection of the AHU/FCU equipments. Calculated the ducts size and pipes size and make a layout of HVAC system. Designed the firefighting system includes water pipes and sprinklers for each room and whole building. Made the engineering drawings for each floor plan, vertical plan, system diagram, control diagram and engineering specifications. The field engineer’s duties included overseeing the HVAC/MEP installation to ensure work was executed to the approved shop drawings and specs. Show less

    • Najran University Dental Department

      Sept 2011 - Aug 2013
      MEP Project Manager

      As MEP Project Manager, my duties included overseeing the HVAC/Electric installations ensuring the works are executed to the approved shop drawings and specs. The installation work included HVAC supply cool air ducts and return air ducts, chilled water and return water pipes, all valves and elbows, drainage water pipes, storm water pipes, fire fighting water pipes & sprinklers, power for HVAC & lighting cables, telephone/data wires, CCTV/broadcasting wires, lightening cables, etc. Coordinated the MEP subcontractor with other subcontractor such as decoration, architecture and civil construction for the conflict of work. Reviewed technical submittals and submitted to main contractors or engineering design group for approval. Made change order for the additional material and work according to the difference between shop drawings and BOQ, and submitted to main contractor for approval. Submitted progress report and progress invoice to main contractors. Supervised multinational engineers and technicians. Show less

  • Licenses & Certifications

    • Certificate of Engineering Fundermentals

      California State Board of Registration for Professional Engineers
      Jun 1982