    Pipefitter Foreman | Pipeline Consultant | Red Seal Steamfitter/Pipefitter

  • Education

    • Ua Piping Industry College

      2012 - 2013
      Steam Fitter Ticket Steam Fitting
    • Pacific Vocational College

      2006 - 2010
      Fire Sprinkler Ticket Fire Prevention and Safety Technology/Technician
    • Southern Alberta Institute of Technology (SAIT)

      2018 - 2018
      API 1169 General Inspector
  • Experience

    • The Gisborne Group

      Jun 2006 - Nov 2010

      Wolverine Yukon zinc mine► Responsible for installation of piping, pumps, conveyors, ball mills, and structural steel. Performed conveyor repairs of the head/tail/snub/counter pulleys/counterweights, the loading transfer return and belt idlers. Univar chemical plant train and port facility for ethanol and acoustic soda Diavik diamond mine process buildings Weyerhaeuser saw mill Instillation/Maitnence of fire sprinklers in residential commercial and industrial settings.

      • Pipefitter

        Sept 2009 - Nov 2010
      • Pipefitter

        Jan 2009 - Sept 2009
      • Pipefitter

        Jun 2008 - Jan 2009
      • Pipefitter

        Sept 2007 - Jun 2008
      • Fire Sprinkler Installer

        Jun 2006 - Sept 2007
    • CT Fire Protection

      Jan 2011 - Mar 2012
      Co Owner
    • Kiewit

      Mar 2012 - Jun 2012
      Pipefitter

      Kiewit mod yard

    • JV Driver Projects Inc.

      Jun 2012 - Sept 2014

      Nabiye SAGD processing plant for imperial oil. Highland valley gold and copper mine floatation expansion. Suncor Williams energy site.

      • Pipefitter Foreman

        Feb 2014 - Sept 2014
      • Pipefitter Foreman

        Mar 2013 - Feb 2014
      • Pipefitter Lead Hand

        Jun 2012 - Mar 2013
    • PCL Construction

      Sept 2014 - Feb 2015
      Pipefitter

      Agruim pot ash mine

    • JV Driver Projects Inc.

      Feb 2015 - May 2015
      Pipefitter

      SAGD processing plant and co gen facilities for shell.

    • CIMS Limited Partnership

      May 2015 - Jun 2015
      Pipefitter

      Spectra energy sour gas plant

    • JV Driver Group

      Sept 2015 - Mar 2017

      Jacos SAGD processing facility► Ran 6 crews with 10-12 people per crew (2 welders per crew). At end of project oversaw crew of 12 people comprised of pipefitters, millwrights, instrumentation, and glycol heat tracers to perform deficiency work and small amounts of commissioning.► Utilized computer skills to do time sheets, rfis, and progress reports. Handled a variety of activities spanning critical lift plans, operation permits, weld mapping, making work packs, attending daily meeting with other trades/supers, and client reps.► Provided all install and testing of process and utility piping/supports/testing/install of pumps and commissioning with millwrights. Maintained good relations with on-site contractors on site to have work performed, such as scaffolding. Show less

      • Pipefitter General Foreman

        Jul 2015 - Mar 2017
      • Pipefitter

        Sept 2015 - Sept 2015
    • Thompson Valley Erectors

      Sept 2016 - Nov 2016
      Pipefitter

      Merritt Green Energy Project Boiler and Turbine

    • IDL Project Management

      Mar 2017 - Apr 2017
      Pipefitter

      North Wood Pulp Mill Shutdown► Ran a crew of up to 5 people on a shutdown where we had to pull out 2 -42” knife gate valves in an underground pit. These valves would discharge the influent ponds. Organized operations permits (written and signed-off); held meetings; and worked with cranes to remove and install new valves.

    • Aecon Group Inc.

      Apr 2017 - Dec 2017
      Pipefitter Foreman (April 2017 to December 2017) / Pipefitter (June 2017 to August 2017)

      Aecon – 8A/6B Enbridge Compressor Stations ► Tasked with running crews up to 25 pipefitters and 5 welders for a project to upgrade natural compressor stations. Remained with the project until the end, working closely with operations and helping with commissioning activities. ► Worked with the supers and general foreman to create a daily plan to be executed and perform toolbox. Tasked to write-up and have all permits approved and signed by operations for work each day. ► Worked with coordinators and quality control to get red lining as-built welding procedures and documentation signed-off and approved for turnover.► Utilized cranes, zoom booms, and other equipment to facilitate the install of all new pipes and compressor for the multiple tie-in points to the existing pipeline and facilities.► Hydrotesting was performed on all lines with water samples taken of all water on-site and approved by operations to be used or discharged. ► Monitored and wrote permits for multiple other contractors to facilitate access to site such as hydro vac/water trucks/fuel trucks/material delivery/site services. Show less

    • TC Energy

      Nov 2017 - now
      Pipeline Consultant

      Maitnence/Shutdowns/Pigging/Operations

    • Black Angus Mechanical

      Oct 2020 - now
      Pipefitter

      Quesnel River and Cariboo Pulp shutdowns

    • Bird Construction

      Mar 2021 - May 2021
      Pipefitter Foreman

      ► Provided strong, decisive leadership to crews at max of up to 25 people (4 of them welders) on a new construction project with approx. 12 tie-in points to the existing facility. Installed/tested and commissioned all process piping and pumps to facilitate unloading of diesel (trains to tanks) and loading (onto ships).► Oversaw installation of fire suppression foam water cannon system. Took on a civil role in building and decommissioning a temporary containment berm due to the facility still being in operation.► Utilized industrial air compressors to send foam pigs down the underground section of the diesel line to remove trapped water from hydro testing. Installed kilometers of welded track pan to catch spilt diesel from the trains.► Worked with crane operators to facilitate any lifts needed, some of which were considered critical due to the sections of the terminal in which work was being conducted.► Collaborated closely with day shift supers and general foreman in making detailed plans. Held toolbox meetings with operations and the workers to go over tasks to be completed. Spoke to each group individually with more detailed information on the task and signed FLHA cards.► Prepared detailed progress reports and weld mapping. Filled out operation permits to be approved by Pembina for the work to be done each night. Show less

  • Licenses & Certifications

    • API 1169 General Inspector

      API 1169 General Inspector
    • Pursuing studies toward completion of the Blue Seal construction management course.

      Pursuing studies toward completion of the Blue Seal construction management course.
    • Red Seal Steamfitter/Pipefitter

      Red Seal Steamfitter/Pipefitter