Sreejith V K, P.E., PMP

Sreejith V K, P.E., PMP

Followers of Sreejith V K, P.E., PMP1000 followers
location of Sreejith V K, P.E., PMPKuwait City Metropolitan Area

Connect with Sreejith V K, P.E., PMP to Send Message

Connect

Connect with Sreejith V K, P.E., PMP to Send Message

Connect
  • Timeline

  • About me

    Deputy Operations Director

  • Education

    • Educational Institution

      1984 - 1988
      B Tech B Tech in Civil Engineeting
  • Experience

    • Saudi Arabian Chevron Inc.

      Jun 2008 - Jun 2016

      • CPMS (Exclusive Chevron Project Management System) Team member for projects developed through Chevron Project development & Execution Process (CPDEP) at different stages to support project management teams in Finalizing project Framing documents, Finalizing conceptual design, Exploring different alternatives, Finalizing the final alternative, FEED, project design, tendering and execution.• Coordinate Pre-FEED scope of work, technical specifications, bill of quantities, and review FEED and EPC documents for projects. • Coordinate discipline engineers to conduct constructability, Operability and Maintainability reviews.• Support Asset &Integrity technical team to prepare, evaluate and validate ITPM for integrity critical structures.• Co-ordination of technical scope management across disciplines and stakeholders within a multinational environment.• Coaching Agreement signed with SAC Civil Engineers and providing support to enhance their proficiency.• Attended lessons learned sessions and uploaded lessons learned during design and execution with most suitable technical recommendations• Participated in OE Audit for MOC process and provided positive improvement feedback• Support Engineering applications and provide solutions to engineering challenges based benchmarking engineering practices and best available technologies used by oil & gas industry.• Participate and provide feedback and technical comments on scheduled reviews of Chevron technical standards and specifications such as CES (Chevron Engineering Standards)• Provide input to technical requirements that enable stakeholder divisions to operate and maintain facilities efficiently and cost effectively.• Perform pre-screening engineering desk reviews of potential suppliers in support of Materials Supply and Strategic Sourcing• Provide support to SAC project teams of specialized engineering nature in the design reviews (30%, 60%, 90% &100%) Show less • Actively participated in IHAZID review meetings and risk assessment for all ongoing projects.. • Phase 4 Project responsibilities include supporting the Project and the Construction Team and are accountable for review all technical transmittals for running construction contracts, as-built drawings, procedures, design, reports, materials review and technical approvals.• Phase 3 Project responsibilities include reviewing of FEED documents, Detailed Engineering documents prepared by Consultants and development of In-house FEED for various projects. Responsibilities also include providing support to the Project Manager until the Phase gate process.• Phase 2 & Phase 1 Project responsibilities include giving support to the PM in developing Basic Concepts and technical evaluation of different alternates.• ESRs – investigations, proponent meetings/agreement to define scope, design, specification generation, drafting drawings, issuing SOW for external design if any, checking external design at all phases, planning and reporting in presentation.• Facility Condition Assessment – Conduct detailed facility condition assessment for training center and prepared reports to substantiate refurbishment or replacement decisions• Stakeholder engagement – Ensure most suitable mode of involvement/ communication with the stakeholders and ensuring the stakeholder is engaged throughout the project phases.• Provide technical support P&ED to achieve gold standard requirements.• Participated in the team building session conducted at P&E Department.• Provided technical feedback with pros and cons on utilizing design package completed for KGOC at Ahmadi to be used as offices building at Wafra.• Actively participated in FEL (Front End Loading) review of projects.• Adherence to Facilities design& construction (FD&C) process to finalize designs through the stipulated flow chart mechanism. Show less

      • Facilities Design Engineer

        Jun 2010 - Jun 2016
      • Project Engineer

        Jun 2008 - Jun 2010
    • Chevron

      Jun 2008 - Jun 2016
      Facility Engineer
    • Al Habshi Engineering Consultants Office

      Jun 2016 - now
      • Deputy Operations Director

        Jun 2023 - now
      • Senior Project Manager

        Jun 2016 - Jun 2023
  • Licenses & Certifications

    • Professional Engineer

      Engineers Chartering Council
      Aug 2008
    • EMS Lead Auditor

      Jul 2006
    • QMS Lead Auditor

      IRCA
      Dec 2003
    • Project management Professional

      Project Management Institute
      Jun 2015
    • Chartered Engineer

      The Institution of Engineers (India)
      Jan 2011