
Diwakar Kumar
Site Engineer and co-ordinator

Connect with Diwakar Kumar to Send Message
Connect
Connect with Diwakar Kumar to Send Message
ConnectTimeline
About me
manager-TM Active rollout
Education

Maharshi Dayanand University
2010 - 2014B-TECH ECE
Experience

Air Net Services Pvt Ltd
May 2014 - Oct 2015Site Engineer and co-ordinator• Installation & Commissioning, Integration, Testing, Operation and Maintenance of Nokia BTS FLEXI, FLEXI MINI, ULTRA (INDOOR, OUTDOOR), MR, NODE-B ,E-NODEB and MW FLEXI-HOPPER, FIU & METRO HUB.• NOKIA BTS Alarm Troubleshooting eg- Loss of Synchronization signal, Loss of Frame, VSWR major alarm, clock reference missing, Synchronization, direct interface signaling.• Carrying out microwave activities like integration and trouble shooting of NEC, NSN HYBRID and bringing NMS visibility to nodes• Expertise in Microwave Implementation as well as Installation, Integration, Commissioning, Testing.• FIU,FPMR,FLEXI HYBRID Commissioning and Installation• FIU,FPMR,FLEXI HYBRID Alarm Rectification• Integration and troubleshooting of various MUX like ECI, TEJAS and CERAGON.• Microwave Hope Up gradation, Sector Addition and TRX Addition.• Commissioning & Installation of Transmission cards (RRI, E1T1, FIFA, FIPA).• Perform Call testing, VSWR measurement.• Making trail and cross connection for the old as well as new sites using RRI Manager, HUB Manager E1T1 manager and Hopper Manager (FIU).• NEC Commissioning and Installation• Upgrade FIU to NEC Link• NEC Traffic Shifting• Working on HUAWEI Equipment • RTN 980,950,910,905,620 Instillation And Commissioning• MW link and Installation And Commissioning• SAU CARD Installation And Commissioning• BHARTI MW Link Upgrade Ericsson to HUAWEI• Project -TATA GSM• CERAGON SDH and PDH Installation And Commissioning Show less

NEC India Private Limited
Nov 2015 - Oct 2016Circle Project Quality EngineerResponsibilities:• First level site maintenance, fault troubleshooting, intimation, escalation and co-ordination with respective vendors to maintain maximum network up-time• Carrying out site expansions and configuration changes as per requirement.Description:• NEC MW Commissioning and installation• Upgrade FIU Hopper to NEC link• Upgrade ULTRA FXC RRI TO NEC link• UPGRADE FLEXI FIFA TO NEC link• NEC Alarm Rectification• CERAGON Fiber Air Radio and Fiber Air IP-20C Commissioning and Installation• CERAGON IP10 Commissioning and Installation Show less

Cosmo infra solutions
Feb 2017 - Aug 2017Project Coordinator• Responsible for the project implementation activities & Handling ATP work. • Coordinating with the Logistics team for material status. • Maintaining the DPR on daily basis and Sites allocation to the TI Vendors. • Customer interaction. Responsible for the approval of all the Transmission plans. • Providing a complete documentation of the all MW and BTS related work issues. • Coordinate with the Planning team for LB and changes in the network topology.• Team Handling & Technical support if any problem duration I&C.• Responsible for invoicing through WCC, ISDP Show less

NR Switch -N- Radio Services Pvt. Ltd.
Aug 2017 - Jul 2018TI Coordinator• Dispatching tasks and managing the telecom engineers and installation teams. • Raising all the technical issues to NSN related to our sites.• Develops and manages the project plan, including project scope.• Looking for new projects and opportunities.• Respecting the project’s time and deadlines.• Client Relationship Management, Team Management, and able to provide Technical support to Team During Installing, Integrating, Commissioning and acceptance testing of BTS Equipment’s• Raising SDR For Required material• Maintaining the DPR on daily basis and Sites allocation to the TI Vendors. Show less

Nokia Network Solutions
Aug 2018 - Aug 2020Field Manager• Executing Network Rollout of 2G,3G,4G on SRAN projects of BSNL in AHMADABAD SSA.• Managing the PO (Purchase order) from the Customer for supply & services.• Whole Roll out data handling.• Manage the Material Delivery and its mapping with Project Implementation Plan.• Manage, monitor and control the project teams and assign them daily, weekly & monthly targets to meet and ensure that project should be implemented as per Project implementation plan as per set targets.• Coordinate with IP partners (Indus/ATC) for site access/Power and any other issues.• RFI/Post RFI issues escalation to concerned IP partner. • Managing regular meetings with customer for the progress / performance of the works and for the solution of qualities issues by providing them.• Material reconciliation & signoffs tracking.• Provided technical support (on-site and remote) to field engineers and installers for TI activities (e.g. installation, commissioning, integration, and functionality testing and troubleshooting). • Responsible for Redeployment of Alcatel or ZTE 3G BTS• Maintaining the DPR on daily basis and Sites allocation to the TI Partners.• Project Planning, Implementation and monitoring of GSM BTS cell site.• TI Management and handling a team of Field Engineers.• Managing a team of OMCR handling site creation and field eng for site implementation. • Handling all the material availability as well as teams TI for implementation of sites.• Supervision of sites and BSC between RFI to RFS and AT with quality as well as KPI.• Vendor management to ensure target achievement with meeting all the quality norms of company.• To take pro-active action for taking decision to avoid all bottlenecks that may held up project completion.• Site Preparation, BTS AT (acceptance test)• Coordinating with Vendors for Team Movement on sites and all with our engineers.• Online support to other Engineers for commissioning and rectification site problems. Show less

Nokia
Nov 2020 - Nov 2022Field Manager
Ericsson India Private Limited In Payroll
Nov 2022 - Jan 2024Implementation Lead
Vodafone Idea Limited
Jan 2024 - nowManger-TM Active rollout
Licenses & Certifications

PTID
Nokia Network SolutionsMar 2017
Huawei Certification ICT Graduation
Huawei WirelessJun 2014
Languages
- enEnglish
- hiHindi
Recommendations

Lynn zittel
Rehabilitation Director / Occupational Therapist / LSVT BIG CertifiedVenice, Florida, United States
Artur skrzyński
Kierownik Sprzedaży / Director of Sales and Operations w Lidl PolskaKatowice Metropolitan Area
Rodgers kubayi
HR Practitioner at King Edward VII Preparatory SchoolCity of Johannesburg, Gauteng, South Africa
Robert mata huerta
Gerente de Arquitectura Digital & SVA en América móvil PerúPeru
Md. salman arefin
SQA Engineer L1@FrontureTechnologies | Web UI Automation with Cypress | Manual Testing | Windows, An...Dhaka, Bangladesh
Rafael marcos álvarez
Community Manager | Producción Audiovisual | Diseño GráficoGreater Sevilla Metropolitan Area
Erna oosterhuis
Commerciële dienstverlening bij Nationaal bureau voor CommunicatieGreater Groningen Area
Pravin f.
Airline/AviationNagpur, Maharashtra, India
Mayumi kato
Senior Product Manager at AmazonSeattle, Washington, United States
Ilayda balkan alemdağ
Property & Engineering Facultative Reinsurance Assistant Manager at Türk Reasürans A.Ş.Türkiye
Matt best, pe
Chief Engineer, MTA Construction & DevelopmentNew York City Metropolitan Area
Sebastian crucitti
Customer Relationship Manager at TelstraGreater Melbourne Area
Dr. himanshi chhabra
Growth Leader | Strategy Consultant | Healthcare startups | Medibuddy | CredihealthGurugram, Haryana, India
Danny scholte
Business Unit ManagerThe Randstad, Netherlands
Akshay paliwal
Engineer by ProfessionGurugram, Haryana, India
Sandra schlosser
Musiktheater; Musical, KLM, JeKisS, EMP, TrashdrummingCoblenz, Rhineland-Palatinate, Germany
Lillie bamsey
MA Society and Culture graduateUnited Kingdom
Leena aldossari
MRIS sophomore | Mawhiba studentRiyadh Region
Rodolph hajj
Electrical EngineerPointe-Noire (département), Republic of the Congo
Blanca casado muriel
Accounting Manager en Enterprise MobilityMadrid, Community of Madrid, Spain
...