Varun Awasthi

Varun Awasthi

Technical Manager

Followers of Varun Awasthi3000 followers
location of Varun AwasthiKakinada, Andhra Pradesh, India

Connect with Varun Awasthi to Send Message

Connect

Connect with Varun Awasthi to Send Message

Connect
  • Timeline

  • About me

    Production Superintendent Armada Sterling V | Offshore Oil & Gas

  • Education

    • Pt. Deendayal Upadhyaya Sanatan Dharma Vidyalaya

      1994 - 2001
    • Indian Institute of Technology, Kanpur

      2003 - 2008
      B.Tech-M.Tech(Dual) Chemical Engineering

      Activities and Societies: Chief Election Officer, Cultural Secretary-Hall 1

  • Experience

    • Reliance Industries Limited

      Jun 2008 - Jan 2011
      Technical Manager

      Worked as a technical manager for Naphtha Cracker plant (based on Stone & Webster Technology) at Hazira manufacturing unit. I worked, with the team of Central Technical Services (CTS) for Cracker group of plants, on different projects regarding de-bottlenecking and smooth operation. Some of the major projects are:• Designing and commissioning of 1-Butene/MTBE unit based on Axens technology. Major activities involved are as following: 1. Site evaluation, technology selection, and technical review of selected technology 2. Process study, PFD and P&ID review and improvement 3. Equipments’ data sheets review provided by Licensor and DEC 4. Hydraulics calculations and review of DEC’s calculation for PSV 5. HAZOP and SIL Analysis, Cause and Effect diagram review etc 6. Start-up documents like SOP preparation 7. Project status monitoring • Optimization in operating conditions to increase catalyst run-length of gasoline hydrogenation unit. This project involves identification of causes for poor run length of GHU’s both stage catalysts and their resolution. • Evaluation and feasibility check of Ni based catalyst for C2 hydrogenation process. • MOC preparation, review and their implementation• Budget preparation for Olefins group of plants• Revamp of present C4 hydrogenation unit to make process more selective towards 1-Butene, while hydrogenating Butadiene. • Involved in shut down and start up activities of various plants like Cracker, Butadiene, MEG and PTA Show less

    • SAIPEM INDIA PROJECTS PRIVATE LIMITED

      Feb 2011 - Apr 2012
      Process Engineer

      • Conceptual design of new refinery technology at Saipem-Milan (Italy) with ENI-EST group. Major activities done are: 1. Performed detailed analysis to study impacts of new unit on existing units. This work accomplished with the help of experimental data and various simulation tools like HYSYS, PRO-II etc. 2. Heat and Material Balance, PFD, P&ID and utility summary preparation • Worked on Ecofuel’s ETBE to MTBE plant revamp project. Involved in preparation of equipments’ data sheets and done pump hydraulics and vessel sizing. • Line hydraulics and consistency check among various process documents (PFD, P&ID, Data Sheets, Equipment summary) for Ras Tanura project. • Worked on various refinery projects at FEED and bidding stage. Show less

    • Shell

      May 2012 - Jul 2018
      Process Team Lead

      Presently, I am working as a Team Lead-Process at BGEPIL’s offshore production platform. Major responsibilities undertaken are:• Supervision of well head operations, three phase separation, crude stabilization, gas compression, natural gas dehydration and sweetening units as a Shift Superintendent.• Wells performance monitoring, investigation and diagnosis of well problems and implementation of corrective actions.• Active planning and scheduling of monitoring activities for maintenance of platform and equipment integrity.• Review, updation and development of documents such as standard operating procedures, P&IDs and risk assessment to achieve business excellence. • Shutdown planning and execution along with procedures review and preparation. Coordinate with other disciplines and vendors for smooth execution.• Provide operational and technical support for brownfield projects (Double block and bleed, ESD migration, New SPM installation and commissioning etc.) conceptualization and execution.• Creation, approval and implementation of MOCs and subsequent documents’ updation.• Production monitoring report preparation for higher management and stake holders’ review• Root cause analysis of day to day operation problems and implementation of analysis outcomes.• Planning and scheduling operation and preventive maintenance activities to achieve minimum downtime.• Coordination and support to production engineering department to facilitate well intervention jobs.• Implementation of HSSE policies and standards to achieve the goal of zero incidence and monitoring of the tools like permit to work system, LOTO, LOLC etc.• Technical and safety training material preparation and session conduction Show less

    • Cairn Oil and Gas

      Oct 2019 - Jan 2023

      Working on commissioning of 165 mmscfd natural gas processing plant.

      • Production Manager

        Aug 2018 - Jan 2023
      • Commissioning Manager

        Oct 2019 - Jun 2021
    • Petrofac

      Jan 2023 - May 2023
      Principal Engineer-Commissioning
    • Shapoorji Pallonji BUMI ARMADA JVCs- India

      Jun 2023 - now
      Production Superintendent Armada Sterling V

      Armada Sterling V (98/2 KG Basin)

  • Licenses & Certifications

    • Level 2 Certified

      Institute of Risk Management
    • Process Safety Management

      NEBOSH
      Feb 2022
    • Tropical Basic Offshore Safety Induction and Emergency Training

      OPITO
      Jun 2023