
Anatoly Plotnikov
Electrician

Connect with Anatoly Plotnikov to Send Message
Connect
Connect with Anatoly Plotnikov to Send Message
ConnectTimeline
About me
Lead Electrical Engineer at the DRB Rus
Education

Novosibirsk State Academy of Water Transport (NSAWT)
2001 - 2007Bachelor's degree Electrical Engineering
Experience

River College
Jan 2003 - Jan 2007ElectricianElectrician and Teacher of electrical subjects.Provided maintenance and repair of electrical lines and equipment, lighting, ventilation and conditions equipment, pressured air and other EMP equipment.

City Administration
Jan 2008 - Jan 2011Senior ElectricianProvided maintenance and repair of electrical lines and equipment, lighting, ventilation and conditions equipment, pressured air and other EMP equipment.

Metall Service
Jan 2011 - Jul 2011Electrical Design EngineerDesigned the electric power supply (power supply and internal circuits) for cellular base stations in AutoCAD for cellular base stations in Krasnoyarsk territory.

ЗАО "Сибагропромстрой"
Oct 2011 - Oct 2012Electrical EngineerMonitored and reviewed consumption of electric energy, heat energy, hot and cold running water, prepared and submitted reports to "last-resort" supplier (Energosbit ), territorial generating company (TGK 13), KrasKom. Prepared reports on consumption of energy to Planning and Economic Department.Concluded treaties, managed contracts, and monitored contract payments for electric energy, heat energy, hot and cold running water supply (with tenants, Energosbit, TGK 13, KrasKom).Drew up and monitored acts of unbundling of electric mains borders.Concluded acts of control of members’ consumption of energy (electric energy, heat energy, hot and cold running water).Prepared annual reports on consumption of energy and developed energy consumption plan for the next year. Also, performed the real estate properties’ energy audit.Interacted with supervisory authorities (TGK 13, KrasKom, Krasnoyarskenergosbit, Rostechnadzor).Assisted in the training and development of subordinates. Show less

Astaldi
Apr 2013 - Jun 2014Electrical SupervisorInternational project: construction of new Terminal 1 at St. Petersburg Pulkovo Airport.Monitored construction to assure compliance with design drawing, specifications and standards. Supervised fitting and commissioning work in accordance with project documentation and Rostechnadzor’s standards.Responsibility was for planning, organization, supervision and control of technical operation and maintenance performed by subcontractors:Supervised the work of contractors on design and installation of the fire alarm system, smoke exhaust system, EVACS. Monitored the activities of the different subcontractors on the construction site to assure compliance with plans and drawings. Ensured reports are issued by contractors as required, ensured contractors are notified of the change in documentation. Monitored field variations and keep the Project Team informed of these changes. Supported and coordinated with other teams regarding construction issues. Planned contractors scope of activity on a daily, weekly and monthly schedules. Participated in equipment inventory, preparation and execution of reports and technical documentation.Ensured the electrical safety compliance of equipment on the construction site. Resolved HSE issues on construction sites in my area of responsibilities.Wrote progress reports on the performance of maintenance and repair works, testing of systems and equipment, systems and equipment status, and ran schedule twice a week. Analyzed the contractors' workforce and numbers deployed.Organized and managed resources used in the supply of consumables and electrical fixtures.Handled emergency situations upon necessity. Solved engineering problems which occurred during electrical fixtures installation and debugging, cable installation (RGB lighting, DMX 512/RDM, voice alarm system HONEYWELL, Siemens-Cerberus PRO).Also, I supervised the work of electricians’ team (50 people) on the installation of EVACS, fire alarm system, automated fire protection. Show less

ERA-CROSS Engineering
Aug 2014 - Jan 2015Electrical EngineerProject: construction of ammunition depot in Teisin.Revision design documentation in accordance with Rostechnadzor’s specifications, standards and regulations, and electrical installation standards.Solved problems with design drawings and installation. Communicated with the design office to eliminate errors in the project. Documented questions and requests from the field to the design office. Reported any deviation or change to the agreed design.Organized and managed resources used in the supply of consumables and electrical fixtures on the construction site, decommissioning of materials, checked cost sheets, workflow with the main contractor.Monitored construction site to assure compliance with design drawing, specifications and standards.Controlled the monthly estimate work. Show less

VCS Montazh LLC
Feb 2015 - Jan 2016Senior Electrical EngineerInternational project: construction of Western High-Speed Diameter (WHSD) bridges in St. Petersburg.Developed energy consumption plan on the construction projects.Monitored and controlled diesel-driven gensets.Kept expenditure records of energy and fuel consumption, and maintained energy efficiency.Ensured the electrical safety compliance of equipment on the construction site. Resolved HSE issues on construction sites in my area of responsibilities.Organized and managed resources used in the supply of consumables and electrical fixtures on the construction site, decommissioning of materials (“Kabel RF”, “ETM”).Coordinated work among the various equipment suppliers and electrical equipment lessees (“Allgen”, “Umetalon”, etc), supervised the observance of treaties’ terms and concluded treaties for electrical supply.Drew electrical one-line diagrams of construction projects electric supply and supervised installation works.Supervised the work of electricians’ team.My responsibilities also included maintenance of hydraulic drives' relay and electronic control systems, winch drives (“LMV”), control systems of crane and welding equipment.Advised general contractor's (“Astaldi Ictas JV”) and other companies' electrotechnical personnel on maintenance and troubleshooting of equipment (“LMV”). Show less

Kazakhmys Corporation
Mar 2016 - Jan 2017Electrical SupervisorInternational project: construction of the Copper plant in Aktogay (Kazakhstan).My responsibility was for planning, organization, supervision and control of electrical installation work: 220-110-6 kV substation with harmonic filters 35/6 kV, internal power supply 6 kV, 380 V. I coordinated work among the various subcontractors (NFC7, Tesla-Tan, PSI, SBI, ISS) on the construction site, ensuring that all contractors are fully aware of the planned scope of activity on a daily, weekly and monthly schedule. Was aware of all site traffic, and ensured that procedures and traffic management were in place for movement in and around the overall site. Monitored the electrical installation work to assure compliance with plans, drawings and specifications (Ausenko, ABB, PUDA), recording and reporting any deviation or change to the agreed design. Coordinated work among various equipment vendors (ABB, PUDA, Alarko) on the construction site.Controlled the quality of electrical installation work, liaised with quality management to ensure that the specifications and quality standards were being achieved and adhered to in line with contract conditions. Monitored and recorded the contractor's progress in line with the project schedule and key milestones. Reported about performed work to Line Manager on daily basis. Solved technical problems which occurred during electrical fixtures installation and debugging. Was aware of all materials brought to certified laydown areas, and monitored storage was managed in line with material types and requirements of the construction.Recorded over storage and damage reports, non-confirmation reports (OS&DR, NCR) of electrical equipment (transformers, switchboards, electric motors etc). Wrote equipment purchase orders (PO) and site instructions (SI). Coordinated pre-commissioning of equipment (ABB, Siemens, NHI).Also, I was aware on a proactive level of any HSE issues that occur on daily basis, resolving and reporting such events. Show less

Samsung C&T Corporation
Mar 2017 - May 2019Senior Electrical EstimatorInternational project: construction of Lakhta Centre (Saint Petersburg).The main responsibility was to provide accurate cost and quantity calculations; to assess and review the electrical working documentation:- Analyzed and reported on the Contractors’ (Renaissance Construction, Telros Group, Electroprof, Liis etc) reports.- Researched and advised on technical and construction matters.- Reviewed electrical drawings, acts, and documentation issued in relation to the project.- Managed day to day liaison with Contractors, Architects, Engineers etc.- Measured quantities of electrical works from drawings and other design documentation.- Prepared estimates and cost plans for electrical works.- Identified deficiencies in electrical drawings and other design documentation, and requested corrections from designers.- Reviewed issues of new electrical design documentation and identified changes, suggested ways to mitigate any cost increases and better technical solutions.- Prepared comparison tables of tenders received and undertook the analysis of tenders, including arithmetic and technical checks, etc.- Checked, verified and agreed on monthly documentation of Completed works submitted by Contractors. Also, I was aware on a proactive level of any HSE issues that occur on daily basis, resolving and reporting such events. Show less

DRB
Nov 2019 - nowLead Maintenance EngineerI am responsible for the supervision of the Equipment and Engineering team at the Rubber Sealing Plant (DRB Rus).I also coordinated the Engineering team during installation and commissioning works at the construction site of the Rubber plant.Select and coordinate contractors for construction and installation work.Negotiate with suppliers of equipment and services.Interact with Energy and Utility Suppliers (water, electrical, gas, sewage water).Organise the work of the equipment maintenance and repair department.Develop the maintenance for the equipment in terms of reliability, cost and safety.Make cost and spend analysis of the equipment.Review design drawings, specifications during construction work and provide design solutions.Develop the rainwater treatment facility maintenance.Develop the maintenance of the forklifts, compressors, compressed air system.Provide training to new and current employees (coach junior engineers).Manage HSE in the Electrical and Mechanical fields during maintenance and construction works.Troubleshoot mechanical and electrical issues successfully. Show less
Licenses & Certifications

Internal Audit of the Quality Management System of products and production processes at automotive enterprises for compliance with the the requirements of IATF 16949
BCGNov 2021
Internal Audit of the Integrated Management System in accordance with the requirements of ISO 14001:2015 and ISO 45001:2018
BCGAug 2021
IATF 16949:2016 requirements for Quality Management System of Automotive Production
BCGJun 2021
Electrical Safety Group 4 (electrical installations with voltage of up to 1000V)
RostechnadzorJan 2022
Languages
- enEnglish
- ruRussian
Recommendations

Hoang nguyen
Software EngineerHo Chi Minh City, Vietnam
Mitali potphode
Influencer Manager | MBA Graduate | Driving Business Success through Strategic Vision and ExecutionIndia
Dhanetra singh negi
Senior Graphic Designer (UI, Mobile App, Magazine, Mailer & Graphics) in Careers360.comDelhi, India
Katelyn bird
Operations Program Associate at University of Wisconsin-StoutMenomonie, Wisconsin, United States
Vinícius i. pereira ∴
Sócio e Consultor Empresarial em Gestão e Projetos Digitais na CORPAD: Gestão de TI | DPO | LGPD | G...Ribeirão Preto, São Paulo, Brazil
Bella rincon
Founder and CEO at Southie CoffeeSt. Petersburg, Florida, United States
Alex roberts
Athletic Performance Coach at Snider High SchoolGreater Fort Wayne
Manish jain
Manager I Technical CS at Amazon Web Services (AWS)Bengaluru, Karnataka, India
Felipe espinosa
Director de Producción, Jefe de Distribución y Logística en ¡HOLA!Villanueva del Pardillo, Community of Madrid, Spain
Brendan woolums
Precision Roll Grinder/MachinistGreen Bay, Wisconsin Metropolitan Area
Laura pigozzo
Vocal & No Verbal Coach, linguista, pedagogista teatraleGalliate, Piedmont, Italy
Terrence tan chun seng
Field Services EngineerSingapore, Singapore
Finn hönemann
knowing the target, not the wayスイス トゥールガウ クロイツリンゲン
Devon pratt
IT Security at L3HarrisSpokane-Coeur d'Alene Area
Regine sum
Co-Founder | Director of Brand & MarketingSingapore
Thilina madusanka
Software Engineer at LB FinanceMatara District, Southern Province, Sri Lanka
Shivasri hariharan
Technical Analyst L2Chennai, Tamil Nadu, India
Natalia peña cárdenas
Gestión de Proyectos | Gestión Cultural ! Proyectos de desarrolloManizales, Caldas, Colombia
Gabriela martínez
AssociateMexico City, Mexico
Marina tedeschi
Agile Consultant - IT Service Delivery Manager - Vorstand MercurioDüsseldorf, North Rhine-Westphalia, Germany
...