Quintas Van Bosch

Quintas Van Bosch

Followers of Quintas Van Bosch718 followers
location of Quintas Van BoschBarton On Sea, England, United Kingdom

Connect with Quintas Van Bosch to Send Message

Connect

Connect with Quintas Van Bosch to Send Message

Connect
  • Timeline

  • About me

    Planning Manager - UK&I Standards at BAM UK & Ireland

  • Education

    • Hexvallei High School

      1996 - 1999
    • Cape Peninsula University of Technology

      2000 - 2002
      HND Civil Engineering
  • Experience

    • Martin & East

      Jan 2001 - Dec 2001

      The project included the installation of all stormwater, sewer, watermain and duct services and the construction of the roads within the new phase of the village including earthworks to the roads and house plots. Work included the supply of all services to the new shopping centre, stormwater, sewerage, watermains and ducts. We also built all the roads and parking areas around the shopping centre.

      • Site technician - Vredenburg retirement village – Somerset West

        Mar 2001 - Dec 2001
      • Site Technician - Longbeach mall – Noordhoek

        Jan 2001 - Mar 2001
    • Martin & East

      Jan 2003 - Dec 2004
      Assistant Quantity Surveyor - Reconstruction of Main Road 174 – Durbanville

      The project consisted of the reconstruction of 14km of road, sub-soil drains, concrete lined side drains and stormwater pipe work, traffic management and construction of bypasses.

    • BAM UK & Ireland

      Feb 2005 - now

      Crossrail is currently the biggest construction project in Europe and consists of various new tunnels being bored under London and new stations being built for a new East / West rail connection.I was responsible for the underpinning of an existing Grade 2 listed bridge which forms part of the famous Smithfield meat market in Farringdon. The bridge required protection due to 3 main construction activities taking place namely: a new ticket hall being constructed adjacent to the bridge, the TBM passing under the bridge and an escalator shaft passing within 3 meters of the foundation of the bridge. This element of work was delivered savely on time and on budget. Show less BAM Nuttall have been awarded a sub-contract for the design and construction of a new Bulk Supply Point (BSP) and associated new electrical distribution cabling as part of the London Underground Sub-Surface Railway Power Upgrade. The Power Upgrade is aimed at delivering an enhanced electrical supply in preparation for the introduction of new S-stock trains. The contract includes installation of fibre (19 640m), 11KV (18 500m) and 22Kv (36 640m) cabling from the new BSP via existing trackside cable routes to remote substation locations and the decommissioning and removal of 58,790m of existing 11kv/22kv lead sheathed nitrogen gas filled cables from site. Show less The original works package included the demolition of existing science buildings at NPL (National Physics Laboratories). The site has been occupied since the early 1900’s developed with a number of laboratory buildings. The contract was for the demolition of the old laboratory buildings and ground remediation. Due to the nature of work carried out in the buildings and their age there were various issues to deal with during demolition. This included radiological contamination in the building structures and surrounding ground and also asbestos used as insulation. Levels of contamination differed from Very Low Level Waste to Hazardous waste which required specialist removal and Environment Agency permission to firstly accumulate and then dispose of waste via appropriate routes. Various additional works packages were added to the contract which included car parks, access roads and drainage in the areas where buildings were demolished. Show less

      • Planning Manager - UK&I Standards

        Jun 2023 - now
      • Senior Planning Engineer

        Apr 2019 - Aug 2023
      • Planning Engineer

        Apr 2018 - Mar 2019
      • Planning Engineer

        Feb 2017 - Mar 2018
      • Agent

        Jan 2016 - Jan 2017
      • Sub Agent

        Sept 2012 - Jan 2016
      • Section Engineer / Sub Agent - LUL SSR Power Upgrade Package 4

        Nov 2009 - Sept 2012
      • Site Engineer / Section Engineer - NPL Demolition and Remediation

        Jun 2007 - Nov 2009
      • Site Engineer - M40 Junction 4 improvement works

        Feb 2006 - Jun 2007
      • Assistant Engineer - Central Milton Keynes transport improvements

        Sept 2005 - Feb 2006
      • Assistant Engineer - Luton noise Barrier

        Feb 2005 - Sept 2005
  • Licenses & Certifications

    • Synchro Certified User

      Synchro Software Ltd
      Aug 2018
    • Eng Tech MICE

      Institution of Civil Engineers