Gafar Rustamov

Gafar Rustamov

Production Engineer

Followers of Gafar Rustamov3000 followers
location of Gafar RustamovBaku City, Baku, Azerbaijan

Connect with Gafar Rustamov to Send Message

Connect

Connect with Gafar Rustamov to Send Message

Connect
  • Timeline

  • About me

    Project Team Leader

  • Education

    • Hacettepe Üniversitesi

      2003 - 2009
      Bachelor of Science (BS) Chemistry
    • Azerbaijan State University of Oil and Industry

      2012 - 2014
      Master's degree Chemical Engineering
  • Experience

    • State Oil Company of the Republic of Azerbaijan (SOCAR)

      May 2010 - Sept 2012
      Production Engineer
    • NORM LLC.

      Sept 2012 - Feb 2015
      Production Quality Engineer

      Quality Assurance and Quality Control

    • AZFEN

      Jan 2015 - Feb 2017
      QA Engineer

      -Oversee project quality to ensure compliance to codes, standards, regulations, equipment specification and QMS requirements-Advancing quantity achievement and performance improvement throughout the organization-Development and implementation of the QMS for planning, fabrication, inspection, documentation and operations activities-Supervise inspection, NDE and testing plans for new construction, repair work-Identify and develop solutions to correct inspection function deficiencies-Supervise inspection and NDE personnel certification and QMS internal audits.-Ensure full implementation of QA/QC requirements-Monitor preparation and close-out of non-conformance reports associated with quality control issues-Coordinate testing and commissioning activities to ensure compliance with QA/QC procedures. Show less

    • SOCAR Polymer

      Mar 2017 - Oct 2021
      Operations Supervisor

      Supervise 15 employees and direct operation, maintenance, improvements, repairs, and safety at a polypropylene plant with 180 KTA capacity. Coordinate all plant operational and maintenance activities, start- ups and shutdowns in adherence with SOPs. Supervise Extruder, Homogenization, Catalyst preparation, Polymerization units start up and maintenance activities.

    • MAIRE

      Oct 2021 - Mar 2024

      LPG Amine treatment unit, LPG MEROX unit, Amine regeneration unit commissioning and start up.Acted as the Commissioning Coordinator / Superintendent (COT), during commissioning, start up and performance test executions.Organized and follow up SIMOPS coordination meeting with multi disciplines, PTW review and approval. Defined the procedures with the supervisors and determines daily activities to develop the day-by-day planning following the priorities indicated by the Commissioning ManagerCoordinates the Commissioning discipline Superintendents (electrical, instrument, mechanical) to complete the pre-commissioning and commissioning activities to allow the hand-over of the project within the target dates and priorities defined with the Commissioning ManagerAssigned the tasks to the supervisors/assistants and ensure that all pre-commissioning and commissioning activities are carried out according to stated procedures and agreed schedule.Responsible for the pre-commissioning and commissioning activities of equipment and facilities, consisting of pipe cleaning exercise, test packs, air blowing, steam blowing, water wash, box-up, ready for inspection (RFI), ready for acceptance (RFA). Carryout equipment and system for Nitrogen Inert (Purging), Initial Leak Test, Degreasing and Ready for plant start-up exercise (RFO).Plan manpower distribution and assigned tasks for every group of the commissioning team; ensuring target completion of each task is aligned to the main and overall companies. Proposed to the Commissioning Manager the needs for mobilization of Vendors specialist Show less Acted as the leader of single area, single unit or entire pre-commissioning activity under the assignment of the Commissioning Superintendent (COT)Supported the Operation Superintendent (COT) in the execution of operating certain duties Ensured that quality standards and safety procedures are being followed by commissioning staff, including adherence to work permit requirements.Checked the Test Pack to confirm the punch points, reinstatement point, blind list as specified in the project Test Pack management Procedure.Liaise with Client Project Team, Project Management, Subcontractors, Vendors and Licensors RepresentativesSupported the Vendors specialists in the execution of the job and coordinates their action with the Commissioning SupervisorsCheck the Test Pack to confirm the punch points, reinstatement point, blind list as specified in the project Test Pack Management Procedure. Show less

      • Process Commissioning Superintendent

        Apr 2023 - Mar 2024
      • Process Commissioning supervisor

        Oct 2021 - Apr 2023
    • MAIRE

      Jun 2024 - Feb 2025
      Commissioning Engineer

      Boruge 4 project-PO and 1-Hexene project

    • GemZA

      Dec 2024 - now
      Project Team Leader
  • Licenses & Certifications

    • Spheripol Operation training Course

      Lyondell Bassell
      Jun 2017
    • DCS Centum VP. Fundamentals

      Yokogawa
      Aug 2017
    • İSO 9001:2015 İnternal Auditor Certificate

      Intertek