Bashar Saadi Taha

Bashar Saadi Taha

Site Inspector

Followers of Bashar Saadi Taha751 followers
location of Bashar Saadi TahaUnited Arab Emirates

Connect with Bashar Saadi Taha to Send Message

Connect

Connect with Bashar Saadi Taha to Send Message

Connect
  • Timeline

  • About me

    Manager, Interface Management, Rail Right of Way Dept. Rail Agency Dubai

  • Education

    • University of the West of England

      2003 - 2006
      PhD Civil Engineering

      Civil Engineering

    • University of Technology - Iraq

      1986 - 1995
      B.Sc Civil Engineering

      ranked 4th out 105 gradutaed student

    • University of Technology - Iraq

      1995 - 1998
      M.Sc Structural Engineering

      Civil & Structural Engineering

    • Jordan University of Science and Technology

      1997 - 1998
      Master's degree Structural Engineering

      Activities and Societies: Advanced courses in structural engineering

    • University of South Australia

      2017 - 2023
      Doctor of Philosophy - PhD (current student) Transportation and Urban Planning
  • Experience

    • Al-FAO General Engineering Company

      Sept 1989 - Nov 1990
      Site Inspector

      Project Description:Chilled water plant and utility buildings of Petrochemical Complex (PC3) at north Baghdad

    • Bani Walid Polytechnique, Libya

      Sept 1998 - Aug 1999
      Lecturer and Module Leader - Civil Engineering

      Develop Teaching CurriculumDevelop Learning PlanManagement of Teaching StaffTeach Different Civil Engineering SubjectsPreparation of Exam and MarkingSupervise Graduation Projects

    • LOOTAH INDUSTRIES GROUP

      Sept 1999 - Oct 2000
      Quality Control Engineer - Readymix Concrete

      Group of readymix concrete batching plants at UAE

    • Montgomery Watson Harza

      Oct 2000 - Dec 2002
      Site Engineer

      Projects:- Network of sewerage & storm water pipeline and construction of pump stations and sewage treatment plants

    • University of West of England, UWE, Bristol

      Jan 2003 - Jun 2006
      Visiting Lecturer

      Teach civil engineering modules

    • Edinburgh Napier University

      Dec 2004 - Oct 2005
      Research Associate

      Supplier of concrete readymix and construction materials

    • AECOM Maunsell Consultant Engineers, Dubai

      Jul 2006 - Nov 2006
      Senior Structural Engineer

      Project:- Construction of cut and cover tunnel - two layers at Dubai International Financial Centre. The tunnel is a combination of in-situ post-tensioned and prestressed precast concrete. The tunnel is designed as foundation box for future development.

    • Roads and Transport Authority

      Nov 2006 - now

      Projects:1. Route 2020: Extension to Dubai metro red line 7 Stations (2 underground & 5 overground). Total length is 15 Km. out of the total length there will 3 km underground tunnel by tunneling boring machine. Cost of project is 10b AED.- The Engineer: Parsons & Systra JV- Contractor: Alstom, Acciona and Gulermack JV- Designer: ch2m (Jacobs), CDMSmith & WSP2. Dubai Metro Red & Green Line extension: Green Line Extension - From Creek station to Academic City. 21 Km (7.8 Km underground) and 13 stations (4 underground). Depot (with Park-and-Ride facility). Red Line Extension – From Rashidiya Depot to Mirdif City Center 3.5 Km and 1 station- The Engineer: Parsons, Atkins & Egis JV3. Station enhancement project Dubai Metro red lineAdding new entrance pods, lifts, escalators, traffic circulation around station and layby parking slots, improve station connectivity, integration with other transport modes and access)- The Engineer: Mott MacDonald- Contractor: ASGC- Designer: Atkins4. Interface Management of Etihad Rail Package 2C with Dubai metro network Management of interface between Etihad Rail and Dubai metro, route 2020 and future railway lines. Ensure safety of railway infrastructure and operation during construction.5. Interface Management of Diera Waterfront DevelopmentDesign and build of multi storey building G+8 on top of UG Palm Deira UG Station.Management of interface and ensure safe integration with existing underground station.6. Dubai Tram phase 2. Feasibility, Ridership, Planning, and route selection.- The Engineer: AECOM & Systra JV7. Dubai Rail Master Plan Update. Feasibility study and data collection phase to update the railway network in Dubai considering the new master plan and development areas. The Engineer: Atkins Show less Projects:1. Dubai Metro Red & Green Lines: Total length of the 2 lines is 74.6 Km (13 km underground tunnel). 41 Stations (14 underground & 37 overground - 2 of UG stations are exchange stations); 3 depots; 3 parks and ride facilities; power stations and cooling plants. Cost of the project is 30b AED.The Engineer: Systra / Parsons JVContractor: Mitsubishi Heavy Industries, Mitsubishi Corporation, Obayashi Corporation, Kajima Corporation, and Yapi Merkezi J&T Dubai JVDesigner: Atkins2. Dubai Tram Project – phase 1: 13 stations Total length is: 10 km. Cost of the project is 4b AEDThe Engineer: SystraContractor: Alstom & BESIX JVDesigner: Parsons Show less

      • Manager, Interface Management Section, Rail Right of Way Dept. Rail Agency

        Oct 2014 - now
      • Project Manager

        Nov 2006 - Oct 2014
    • The British University in Dubai - BUiD

      Jan 2014 - Jan 2015
      Adjunct Lecturer - Part time

      Teaching Introduction to Construction moduleMaster Degree Program of Construction Law and Dispute Resolution

  • Licenses & Certifications

    • Member of Asset Management Institute

      The Institute of Asset Management
    • Memebr

      Institution of Civil Engineers (ICE)
    • Fellow Member of Engineers Australia. FIEAust.

      Engineers Australia
    • Consultant Member of Iraqi Engineers Union

      Iraqi Engineers Union