Eric Ntenga

Eric Ntenga

Technician In Training/Maintenance controller

Followers of Eric Ntenga681 followers
location of Eric NtengaDoha, Qatar

Connect with Eric Ntenga to Send Message

Connect

Connect with Eric Ntenga to Send Message

Connect
  • Timeline

  • About me

    Maintenance Manager

  • Education

    • Mangosuthu University of Technology

      1999 - 2004
      Higher National Diploma Mechanical Engineering
    • University of South Africa/Universiteit van Suid-Afrika

      2011 - 2014
      Bachelor of Technology Mechanical Engineering
    • University of Pretoria/Universiteit van Pretoria

      2017 - 2019
      Bachelor of Science Honours Engineering and Technology Management
    • Unicaf University

      2020 - 2023
      Master of Business Administration - MBA Business Administration and Management, General
    • Unisa Graduate School of Business Leadership (SBL)

      2016 - 2016
      Postgraduate Diploma Business Administration and Management, General
    • Varsity College

      2006 - 2006
      Advanced certificate Project Management
  • Experience

    • Hillside Aluminium

      Jul 2002 - Dec 2006
      Technician In Training/Maintenance controller
    • Sasol Synfuels

      Feb 2008 - Dec 2011

      It was an exciting journey to be technically responsible for coal processing plant. I successfully developed asset maintenance strategies for conveyors belts, centrifuges, screens, filtration systems ( filters and thickeners) and pumps. I was appointed as project leader for the total shutdown for the first time, among other projects executed during this shutdown were launder replacement, thickener rakes replacement, 42" underground line replacement, coal bunkers repairs, tripper cars and conveyor belt replacement. This shutdown was completed within schedule, budget and exceptional integrity. In the same year I was also nominated as the best technician for Gas production and awarded the best shutdown of the year for the business unit. Show less This was my first appointment at Sasol at Market Process Integration Business unit, the only technician responsible for over 10 000 process pipelines at a time for both East and West Sasol Synfuels facility. Among other projects executed during this period were:1. MP and HP steam header replacement project.2. The replacement of the 78" ammonia line.3. Hot tap of instruments air line to Oxygen plant.4. The replacement of instrument air line to Phenosolvan.5. Replacement of methane line to Sasol Nitro. Show less

      • Senior Mechanical Technician

        Jan 2010 - Dec 2011
      • Maintenance Technician

        Feb 2008 - Dec 2009
    • Sasol synfules

      Jan 2012 - May 2015
      Principal Mechanical Technician

      As a principal technician at tank farm, Energy business I was responsible to provide technical support to managers and engineers, develop asset maintenance strategies for rotating (360 x Pumps) and stationery (204 x Tanks).Part of the duties were:Ensure that work standards are met according to quality and quantity.Manage complex schedules and communicate possible delays.Ensure effective resource utilization and efficiency.Develop, implement and review equipment maintenance strategies.Responsible for all statutory equipment compliance.Ensure capital project governance from initiation phase to execution.Assume project leader role for all planned shutdowns and turn around.Ensure compliance to change management.Mentor for technicians and engineers in training.Facilitate Root cause and effect analysis for all major equipment failures.Build customer relationships in order to understand their needs. Show less

    • Sasol

      Jun 2015 - Aug 2022
      Area Manager Maintenance

      As a maintenance area manager, am accountable for: The availability and integrity of safe and reliable assets to production. Effective maintenance of the plant to ensure legal compliance.To ensure that maintenance responsibilities are coordinated through preventative and corrective maintenance through work management systems and tools.Manage, revise, and improvement of asset management standards for maintenance.Maintain assets within agreed operations envelope conditions and set standards.Identification of technical problems and opportunities.Effective shutdowns and turn around management.Management of standards and procedures.Interact with relevant internal and external stakeholders.Participate in plant design for maintainability, operability and accepting equipment after installation.Ensure financial discipline and governance through continuously optimize maintenance activities.Compile maintenance and renewal projects budget for the department.Ensure effective management of change.Responsible to manage over R130 Million Opex and R80 Million CapexI remain the sponsor for most Capex projects from idea generation to close-out.Implement activities to optimize external spend.Ensure effective utilization of internal resources.Contribute in the translation and execution of the business strategy.Manage and develop employees effectively to their full potential. Show less

    • Eskom Holdings SOC Ltd

      Aug 2022 - Dec 2022
      Line Maintenance Manager

      As a maintenance line manager at Kendal power station, I was responsible for water treatment plant and auxiliary plants which included auxiliary cooling system plants, Fuel oil plant, cross over plant, clean and dirty plant and firewater system for the power station.My duties and responsibilities during this period were:• Develop and control divisional maintenance budget.• Ensure exceptional workmanship.• Ensure execution of work as per production and operations requirements.• Accountable for health and safety of all employees.• Accountable for training and development of the employees.• Accountable for making sure that spares are available for maintenance and follow up with service providers thereof.• Accountable to maintain good relationship with all stakeholders (operations, productions, procurement, engineering, works management, finance and human resources).Achievements and challenges:• It was indeed not easy to challenge the status core, but with determination and consistency a lot was achieved in this short period of time.• I managed to re-energize and bring purpose to the maintenance, operation and production teams.The following recovery projects were initiated and some executed using urgent procurement process.1. Water treatment plant acid bay piping and valves replacement projects.2. Refurbishment of all four available fire water pumps.3. Managed to refurbish two auxiliary cooling water pumps.4. Refurbishment of four anion pumps and put in place quality control plan.5. Execution of clean and dirty refurbishment project.6. Initiated and drove the Kendal Water Treatment Plant refurbishment project to NEC level.7. Developed the first draft of maintenance budget for FY23.8. Revised and proposed the new org structure for the team. Show less

    • SANKYU Saudi Arabia

      Jan 2023 - now
      Maintenance Manager
  • Licenses & Certifications