Marta Pollastrini Verde

Marta Pollastrini Verde

Environmental Auditing

Followers of Marta Pollastrini Verde572 followers
location of Marta Pollastrini VerdeGreater Madrid Metropolitan Area

Connect with Marta Pollastrini Verde to Send Message

Connect

Connect with Marta Pollastrini Verde to Send Message

Connect
  • Timeline

  • About me

    Senior Project Engineer en Worley

  • Education

    • École Supérieure de Chimie Industrielle de Lyon (ESCIL)

      1993 - 1994

      ERASMUS -E.C.T.S. Grant at École Supérieure de Chimie Industrielle de Lyon (E.S.C.I.L.) (Lyon, France). Fourth Year of the chemistry Science degree and Project.

    • Escuela de Organización Industrial

      1995 - 1996
      Master's degree Master en Ingeniería y Gestión Medioambiental

      Título del Ministerio de Industria y Energía que faculta para estar al frente de los servicios de prevención y corrección de la contaminación industrial de la atmósfera (O.M. de 18 de octubre 1976, art. 37). Dedicación completa (900 horas).

    • Universidad Complutense de Madrid

      1990 - 1995
      Licenciatura Ciencias Químicas
  • Experience

    • IDOM Consulting, Engineering, Architecture

      Jan 1996 - Jan 1997
      Environmental Auditing

      Environmental Audits for Comunidad Autónoma de Madrid

    • Krupp Uhde GmbH

      Jan 1997 - Jan 1998
      Junior Project Engineer

      "Oil and gas" Department (Dortmund, Alemania). Leonardo da Vinci Scholarship. Support to the European Thermie Project “U.S.R. Co-gasification with lignite in a HTW fluidized bed system”.

    • Intecsa Industrial

      Jan 1999 - Jan 2021

      Utilities & OSBL for Bottom of the Barrel Project (BOB) for CEPSA at San Roque Refinery, Algeciras ,Spain.Project Engineer and Interface Coordinator with LCF, Sulphur Block and Site Preparation Projects. EPC NORM Waste Handling, Treatment and Disposal Project at BeAAT in Ruwais ,Abu Dhabi for TAKEER /ADNOC Group. Detail Engineering Phase. EPC Gas & NGL Export facilities Project for KJO at Al-Khafji , Saudi Arabia. Coordination of Engineering activities with AGOC (Kingdom Saudi Arabia) and KGOC(Kuwait) projects during Detail Engineering Phase. Detail Engineering phase for C10 Project, revamping of Cartagena Refinery. Blocks 3A and 1B Project Engineer for 4 simultaneous Revamping projects for REPSOL. HDS Units to reduce to 10 ppm´s the Sulphur Content and Capacity Increase: G-37 Project La Coruña Refinery, P-47 Project Puertollano Refinery; T-56 Project Tarragona Refinery; C-29 Project Cartagena Refinery Detail Engineering of a EPC Plant Phenol III-Zone B for ERTISA (Huelva) in Joint Venture with Ecolaire ,S.A Project coordination and management. Support to Commercial Department for the preparation of Minatitlán Refinery (México) package bid #IV for PEMEX Support to Commercial Department for the preparation of a fertilizer Plant (MAP) in Uberaba, Brazil for Fosfertil HDS-V Hydrodesulphuration Unit for CEPSA , Gibraltar Refinery. Project Engineer, responsible for all engineering disciplines coordination as well as for relations with the Client. Novolen III Plant, Polypropylene Plant for BASELL. Construction phase in Tarragona. Responsible for control cost, subcontracts management at Site. Novolen III Project for BASELL. Cost Control during Detail Engineering Novolen III Project for BASELL. Basic Engineering in Krupp Uhde (Bad Soden, Alemania). ). Assistance to process discipline. Support to Commercial Department in the preparation of a Proposal for an Aromatic Plant proposal in Iran.1 month secondment in Krupp Uhde (Dortmund, Germany) as Interface Coordinator between INTECSA UHDE and KRUPP UHDE. Support to commertial department in the preparation of a Proposal for a Composting and Biogas plantfor the Communinty of Madrid ,Spain. Study of technical alternatives for CFC recovery from fridges treatment and disposal . Study of technical alternatives for button batteries treatment treatment and disposal.Study for technical alternatives for fluorescent lamps treatment and disposal. Discharged Liquids correction project for CEPSA Terephthalic acid plant

      • Project Engineer and Interface Coordinator

        Aug 2018 - Jan 2021
      • Engineering Manager

        Jan 2013 - Jul 2018
      • Interface Engineer

        Sept 2011 - Dec 2013
      • Project Engineer

        Oct 2007 - Sept 2011
      • Project Engineer

        Feb 2005 - Sept 2007
      • Project Engineer

        Sept 2004 - Feb 2005
      • Project Engineer

        Jun 2004 - Aug 2004
      • Project Engineer

        Mar 2004 - May 2004
      • Project Engineer

        Aug 2002 - Feb 2004
      • Subcontract Engineer and Site Cost Controller

        Jan 2001 - Jul 2002
      • Cost Controller

        Aug 2000 - Dec 2000
      • Project Engineer

        Mar 2000 - Jul 2000
      • Interface Coordinator

        Feb 2000 - Feb 2000
      • Project Engineer

        Sept 1999 - Jan 2000
      • Project Engineer

        Jun 1999 - Aug 1999
      • Junior Project Engineer

        Jan 1999 - Jun 1999
    • Worley

      Mar 2021 - now
      Senior Project Engineer

      PRPP Senior Project Engineer Perntamina-Rosnef TeamPT Gre@T Project . Tuban Indonesia

  • Licenses & Certifications

    • Preparación de la Certificación PMP-PMI ¡A Tu Ritmo!® - 6ª Edición PMBOK

      EIGP, Escuela Internacional de Gestión de Proyectos
      Dec 2020
      View certificate certificate