SACHIN PAL

SACHIN PAL

Civil Engineer

Followers of SACHIN PAL1000 followers
location of SACHIN PALWashim, Maharashtra, India

Connect with SACHIN PAL to Send Message

Connect

Connect with SACHIN PAL to Send Message

Connect
  • Timeline

  • About me

    Project Manager at Megha Engineering & Infrastructures Ltd.

  • Education

    • Rajiv Gandhi Prodyogiki Vishwavidyalaya

      2022 - 2024
      Master of Technology - MTech Construction Technology and Management
    • Dr. A.P.J. Abdul Kalam Technical University

      2009 - 2013
      B.tech Civil Engineering 1st Division
  • Experience

    • Kanwar Enterprises Pvt Ltd

      Aug 2013 - Nov 2015
      Civil Engineer

      I was civil engineer in tailling dam project.

    • Ravi Infra-build Projects Private Limited

      Dec 2015 - Jul 2016
      Structural Engineer

      I was structural engineer in NH-15 ,National Highway project.

    • TATA Power

      Aug 2016 - Jul 2019
      Quality Assurance Engineer

      I was leading the quality team.My roles and responsibilities are given below -1. Conduct QA-kick off meeting with every contractors.2. Provide on site trainings to contractors on every new activity.3. Share Field inspection report/weekly report/Raise NCR for every wrong activities.4. Fill Civil/Electrical checklists as per FQP.5. Provide field quality clearance certificate to contractors after work completion.6. PP's closure/Attend daily site meetings and review meeting with contractors.7. Maintain quality checklists/Cube test register/Ajax slip register/Cement stock register/Raw material incoming register/Royalties submission.8. Ensure Quality checklists during ongoing activities like Pour card/Reinforcement checklists/BBS/Sieve ananlysis /Design Mix/Pull-out lateral test reports/water test report/Raw material test reports.9. Ensure incoming material quality ,is it ok or not?10. Competent professional having sound knowledge of civil works, Dc works, Ac works and Earthing and LA work in solar plant. 11. Refer IS Code for relevant used in any works. To check quality work on CMCS Building (Control room), PEB (Pre-engineering buildings), Pilling, Transformer Foundation, Pre-cast boundary, Chain link fencing and Cable trenches, SCB installation, Ear thing and LA installation, Module Mounting Structure, module installation, cable laying, inverter installation, Pv array grouping, Voc checking, megger checking, Show less

    • Oriano

      Jul 2019 - Jun 2024

      Key Responsibilities- Engage soil testing team/DGPS survey/drone survey/Hydrology/topography/contouring/Pull-out/Lateral/Compression on site and ensure the results for the same during execution. Collect samples of boreholes and conduct Pull-out/Lateral/Compression to finalized the depth and diameter of piling works. Specialists in piling work, MCR/ICR Buildings, MMS and Module Installation, Road work, Boundary fencing, Pre-cast Boundary, Switchyard foundations, IDT, Burnt oil pit, MCS, Drainage work, MMS and module installation, DC work, Ac work. To prepare work schedule for each activity date wise, do site visits for upcoming projects and share site visit report to our reporting manager. To develop the project as per drawing and specifications and to check the quality control in respect of FQP, To develop the project as per drawing and specifications and to check the quality control in respect of FQP. Sharing daily progress report/Manpower and resources detail. Execution of the projects within the guidelines of time, Cost and quality, Checking plans, drawings and quantities for accuracy of calculations. To maintain quality documents like design mix/water test report/Pull-out lateral/pour card/reinforcement checklists/Concrete batch slips as followed by FQP and SOP. Planning and managing of all Installation activities for the project and ensuring Quality of monitoring, implementation of Safety as per Indian standards. Project Construction with Quality and less punch points, Multiple stage quality checks. Show less Competent professional having sound knowledge of civil works, Dc works, Ac works and Earthing and LA work in solar plant. Using FQP (Field Quality plan) and SOP’s for better quality and also following engineering drawing, Maintaining Documents, checklist and site register, to prepare Field Inspection Report, weekly reports and QA- Kick off meeting with contractors prior to start of work. Refer IS Code for relevant used in any works. I am expert in CMCS Building (Control room), PEB (Pre-engineering buildings), Pilling, Transformer Foundation, Pre-cast boundary, Chain link fencing and Cable trenches, SCB installation, Ear thing and LA installation, Module Mounting Structure, module installation, cable laying, inverter installation, Pv array grouping, Voc checking, megger checking.We have done all works as mentioned above and successfully handed over the 5 projects to our client. Show less

      • Manager in Projects

        Dec 2022 - Jun 2024
      • Deputy Project Manager

        Aug 2021 - Dec 2022
      • Assistant Manager

        Jul 2019 - Jul 2021
    • Megha Engineering and Infrastructures Ltd (MEIL)

      Jun 2024 - now
      Project Manager

      Renewable energy professional and project manager with 11 years of rich experience in renewables energy across the country. Specialist in site engineering, project execution, project planning, Quantity surveying, Quality Assurance, BOQ, cost optimization, approvals, design support, vendor management etc.

  • Licenses & Certifications

    • 30 days excel crash course

      E-Learning
      Jun 2023
      View certificate certificate
    • ABAC(Anti-bribery anti-corruption) and whistleblower policy

      TÜV SÜD
      Dec 2023
    • Code of conduct

      TÜV SÜD
      Jan 2024
    • Aspect and impact identification, Hazard identification and risk assessment (HIRA)

      TÜV SÜD
      Dec 2023
    • Foundation course on STAAD.Pro

      CAD Design Centre
      Aug 2012
      View certificate certificate
    • Microsoft Project, Project Management and Planning

      Udemy
      Feb 2024
      View certificate certificate
    • SPOT AWARD

      TATA POWER SOLAR pvt ltd
      Jun 2017
    • SPOT AWARD

      TATA Power
      Mar 2018
  • Honors & Awards

    • Awarded to SACHIN PAL
      Spot Award Tata Power Solar Systems Limited Mar 2018 Excellent contributions in training amd development of contractors and on time closure of punch points in 28 Mwp ABREL project Lapanga,Odisha thereby good workmanship quality amd on time completion of project.
    • Awarded to SACHIN PAL
      Spot Award Tata Power Solar systems limited Mar 2018 Effective implementation of safety SOP for DC/AC cable laying activity and timely reporting on UA/UC.
    • Awarded to SACHIN PAL
      Spot Award Tata Power Solar Systems Limited Jun 2017 Excellent Quality work done during Execution of 65 Mwp NTPC Bhadla 2016-17