Mohamed Samir Atta (MBA, PMP)

Mohamed Samir Atta (MBA, PMP)

Protection Engineer

Followers of Mohamed Samir Atta (MBA, PMP)950 followers
location of Mohamed Samir Atta (MBA, PMP)مكة جدة السعودية

Connect with Mohamed Samir Atta (MBA, PMP) to Send Message

Connect

Connect with Mohamed Samir Atta (MBA, PMP) to Send Message

Connect
  • Timeline

  • About me

    Electrical Engineer at ACWA Power

  • Education

    • Project Management Institute.

      2018 - 2018
    • Faculty Of Engineering, Cairo University

      2004 - 2009
      Engineer’s Degree Electric Power & Machines Good

      Activities and Societies: -STP (Steps Towards Progress) -Resala. -ZEDNY

    • The Arab Academy For Management, Banking And Financial Sciences

      -
      Master of Business Administration - MBA Business Administration and Management, General
  • Experience

    • Egyptian Electrical Transmission Company EETC

      Oct 2009 - Aug 2014
      Protection Engineer

      -Member of programming commission in (EETC) and also responsible for studying, programming & selection of suitable relay settings in EETC Network.- Analysis of disturbance & event recorder.-Member of Market Rules Committee at Egyptian Electricity Transmission Company (EETC)- short circuit studies utilizing Cape load flow & ETAP Programs.

    • MEGA For Construction & Industries

      Feb 2010 - Dec 2011
      Design Engineer (Part time Job)

      Substations & power plants Secondary Design engineer.

    • Siemens Ltd. Saudia Arabia

      Sept 2014 - Mar 2015
      Site Engineer (Kharj-2 380 KV Substation)
    • Siemens

      Mar 2015 - Jun 2022

      -The project objective was to establish two more parallel underground 110 Kv parallel feeders between Medinah South & Al-Naqa Substation due to the more extensions added to both substatiions.The scope of work included civil works (Trenches excavation, Joint Bays, manholes,…..) and the electrical works (cable pulling, jointing, testing,termination,….),As a Site Manager, My duties were the following:• Managing site activities including electrical and civil RFIs & RMIs approval, maintain all types of cables work. • Leading and Supporting the team includes Safety engineer, Civil engineer, Electrical engineer, Cable jointing team & Cable pulling team. • Monitoring & Controlling construction activities.• Following up with different suppliers.• Distribute and file design documents, procedures, instructions, and vendor information.• Maintaining safe working practice.• Assist, follow up and coordinate with sub-contractors.• Coordinating with the different stakeholders including traffic, Roads and municipalities.• Preparing reports for project review periodic meeting along with the client. Show less • Assist the project manager to establish project objectives, procedures, data collection, and performance standards within boundaries of corporate policy• Prepare scheduled and necessary updates of construction activities and analysis of manpower and equipment required• Inform all supervisors and subcontractors promptly of any construction schedule changes, and work closely with all stakeholders to ensure requirements are met.• Maintain budgetary, scheduling, and project database oversight, and report regularly to project manager to keep him constantly informed of job progress, plans and problems that could significantly affect costs or schedules• Manage compliance, quality control, and quality assurance standards and specifications Show less -Site Manager of SVC Al-Jouf 2 (Static Var Compensation Station) Site Manager responsibilities including the following.- Coordinating and scheduling design documents from the design engineers.- Distribute and file design documents, procedures, instructions, and vendor information.- Ensure that all completed work conforms to approved project requirements.- Coordinating with Client representatives to ensure compliance with job requirements.- Assist and coordinate with sub-contractors.- Prepare and administer field instructions.- Obtain as-built information and prepare as built drawings.- Attending technical meetings as needed with Client and Sub-contractors.- Documenting and distributing technical notes.- Documenting project related technical discussions or negotiations.- Reviewing and following up on non-major issues.- Addressing request for Information and assisting in Field Change Request. Show less

      • Site Manager

        Nov 2016 - Jun 2022
      • Project Engineer

        Dec 2018 - Apr 2022
      • Site Manager (SVC Al-Jouf 2) Static Var Compensation Station (380/32 KV)

        Oct 2015 - Nov 2016
      • Project Engineer

        Mar 2015 - Oct 2015
    • Siemens Limited Saudi Arabia

      Nov 2016 - Nov 2018
      Site Manager

      -The project objective was to establish two more parallel underground 110 Kv parallel feeders between Medinah South & Al-Naqa Substation due to the more extensions added to both substatiions.The scope of work included civil works (Trenches excavation, Joint Bays, manholes,…..) and the electrical works (cable pulling, jointing, testing,termination,….),As a Site Manager, My duties were the following:• Managing site activities including electrical and civil RFIs & RMIs approval, maintain all types of cables work. • Leading and Supporting the team includes Safety engineer, Civil engineer, Electrical engineer, Cable jointing team & Cable pulling team. • Monitoring & Controlling construction activities.• Following up with different suppliers.• Distribute and file design documents, procedures, instructions, and vendor information.• Maintaining safe working practice.• Assist, follow up and coordinate with sub-contractors.• Coordinating with the different stakeholders including traffic, Roads and municipalities.• Preparing reports for project review periodic meeting along with the client. Show less

    • ACWA Power

      Apr 2022 - now

      Roles & Responsibilities:In the Red Sea Project, ACWA as an investor was responsible for Building and operating of the water and power utilities for the project and providing the service for the off taker (Red Sea Global).For the power scope, it is divided between solar power generation, power transmission and distribution.My responsibilities are including the planning, supervision and witnessing the construction, testing and commissioning works of the below assets: Solar farms:The project is comprising 5 solar farms with the below DC generation Capacities:Two are connected to the 110 KV power Network:1-Solar Farm 1: 122 MW2-Solar Farm 2: 266 MWAnd other three as a stand alone microgrids:3-Desert Rock: 6 MW4-Southern Dunes: 6 MW5-Sheybara: 6 MWAs the solar energy generation scope is not connected to the National grid, an Energy storage system and an emergency source of power generation had to be existing, represented in BESS (Battery Energy Storage Systems) and Internal Combustion Engines. BESS (Battery Energy Storage System):At each solar farm a group of battery containers (depending on the solar farm capacity and the required loads) with 410 MWH MWH capacity are installed and discharged from the PVs and used to feed the loads at night time or at the time when the sola radiations ae not sufficient for power generation. Commissioning:By the end of the construction stage, the commissioning of the different assets are taking place, my role was to supervise and make sure the proper following of the procedure and method of statements of the PVs, BESS & ICE systems.This includes beside the commissioning, the DCMS systems which allowed me to deal with different manufacturers for DCMS & TDMS as:1-Emerson for PVs.2-NARI for BESS (Batteries).3-WinCC for ICE (Internal Combustion Engines).4-Etap as a supervisory controlling system for the entire microgrids or Network.110 KV UG Cables Power Network.33 KV UG Cables Distribution Network Show less

      • Electrical Engineer

        Apr 2022 - now
      • Electrical Engineer

        Apr 2022 - now
  • Licenses & Certifications

    • EdX Verified Certificate for Electric Cars: Technology

      EdX
      Feb 2020
      View certificate certificate
    • Project Management Professional

      Project Management Institute
    • EdX Verified Certificate for Electric Cars: Introduction

      EdX
      Sept 2019
      View certificate certificate
    • Solar Energy System Design

      The State University of New York
      Aug 2021