Idil Dharma Putra

Idil Dharma Putra

Structure Welding Inspector

Followers of Idil Dharma Putra5000 followers
location of Idil Dharma PutraBanten, Indonesia

Connect with Idil Dharma Putra to Send Message

Connect

Connect with Idil Dharma Putra to Send Message

Connect
  • Timeline

  • About me

    QA/QC Manager / SSGB

  • Education

    • Universitas Jenderal Achmad Yani (Unjani)

      1998 - 2000
      Bachelors degree of Science in Electrical Engineering Engineering
    • Institut Teknologi Bandung

      1995 - 1998
      Diploma Hardware Engineering
  • Experience

    • Siemens Energy

      Dec 1999 - Nov 2004
      Structure Welding Inspector

      Performed Structural Inspection for various fabricated items at workshop and ensure all items had met with Company requirement such as; AWS D1.1, PQP, ITP, WPS, WQT Register, DWG, QC inspection tools, welding equipment, material receiving inspection and preservation and control the welding consumable as per manufacturer requirement, prepare record and inspection report and submitted to QC Supervisor for reviewing and signature.

    • PT. KALIRAYA SARI

      Dec 2004 - Sept 2005
      QA/QC Piping & Structural Inspector

      Ensure all fabrication phase for 4 (four) Separators Gas Platform, Topside, Bridge and Piping Shop and Erection for AX, IX, LX & KX are met Client minimum requirement with daily inspection activities such as; performed daily inspection based on the approved ITP requirement, Structure ISO DWG, isometric Dwg, Client Spec. for Fit-up, welding, NDE, coating/painting and material handling storage, receiving inspection and preservations. Monitor Electrode handling storage, issuance process and type delivered on site area. Attended quality meeting along Construction, Management and Client for quality continual improvement during project phase. Report weekly QC activities and KPI achievement to QC Manager and involved for Safety meeting and assist to closing safety issued. Delivered information to Construction team and suggested to minimize the weld repairs and the root cause analysis throughout Quality Welding Repair Assessment. Show less

    • Saipem

      Oct 2005 - Oct 2009
      QA/QC Supervisor

      Prepared and collected all document project installation phase requirement, such as; PQP, ITP’s, NCR, TQ’s, HSS Procedure, NDE Procedure, Audit, ISO Installation DWG, Pipeline Isometric DWG, Pipeline sausage (pipe numbering and pipe sequence), approved WPS and supporting documents, Welder Certificate and Register, QC & NDT Personnel approval and register, Welding and QC tools Equipment register, Electrode Client approved Register, HSS consumable register, MTC and etc. Supervised and monitored inspection activities coverage by 2 Pax’s Tallyman, 4 Pax’s Welding Inspectors, 2 Pax’s Coating Inspector, 2 Team NDE Technician for offshore installation phase such as; Jackets, Topsides, Bridge pipelines, spool tie-in, riser and AWTI (above water tie-in). During installation phase the daily inspection activities was performed such as; material receiving inspection, Welders Qualification Test, HSS Operator PQT, fit-up, welding (before, during, after), visual insp., monitor NDE activities (UT Lam-check, Crawler X-Ray, AUT/TOFD, MPI and MUT), weld repair monitoring, coating/painting and record / reporting. Proactively prepared the inspection check list, focus assessment (readiness check), before and during installation phase and conducted internal audit to ensure all activities are met Client requirement to fulfill Client Satisfaction. Collect all inspections document for compiling and submitted to management for final dossiers. Attended onboard daily work progress meeting, safety moment meeting and etc. for work and safety improvement. Show less

    • Bureau Veritas

      Dec 2009 - Apr 2010
      Snr. Welding Inspector

      Collect and reviewed all project documents inspection requirement such as; PQP, ITP’s, WPS, WQT, KPI, NCR, TQ’s, STR ISO DWG, Pipeline Isometric DWG, Welding & Equipment Register and etc. Performed daily basis inspection such as; material receiving inspection, Welding inspection (before, during, after), NDE monitoring, Welder performance record, audit during fabrication phase, monitored welding machines & QC tools validation certificates, welding consumable handling storage, material preservation and passivation and ensure all items inspection was met Client minimum requirement. Specific for welded Tie-in, the Automatic Welding Parameter record was used (ALX) and all of inspectors in-charged was trained according manufacturer requirement. Coordinate all issue regarding welding imperfection with PIC auto welding system Subcontractors (Serimax) to minimize weld rejection rate. Record and report to Quality Manager. Show less

    • Momentum Engineering, Dubai

      May 2010 - Sept 2010
      QA/QC Supervisor

      Prepared and submitted the Project Documents for Client approval, such as; PQP, ITP’s, NCR Procedure, Project Quality Objective Procedure, QC Org. Chart, Welding Book, WQT register, HSS Procedure, HSS PQT and PPT (Project Pre-production test), work instruction, method statement and etc. Prepared offshore personnel manpower loading plan and register (Welder, QC’s, NDE, HSS Operator) Welding and QC Tools Equipment Register, Welding & HSS Consumable Register, TQ Register, NCR Register, Audit and readiness check prior start offshore activities, MTC line pipes and etc.Supervised and monitor the inspection activities for 28 Pax’s offshore quality teams such as; QC Supervisor’s, Tallyman, QC Welding Insp, QC Coating Insp, NDE Team and HSS Operator Team for Day and Night shift offshore operation. Ensure all production test result were met minimum project specification and international standards. Calculate the production cycle time for timing improvement and increase productivity for welding and HSS application. Got project KPI achievement for Zero Client NCR, monitoring the weld performance record to minimized weld defect, involved with pre-commissioning team to develop project hydrotesting procedure and etc. Show less

    • Swiber Holdings Limited

      Oct 2010 - Mar 2016
      QA/QC Manager

      In-charged as QC Yard Manager Representatives for Fabrication:Reviewed all fabrication documents related to quality concern; such as; Fabrication ISO DWG, Welding Map, WPS, WQT, Coating/Painting, hydrotesting, heat treatment / PWHT, mechanical testing, hydrotesting, leak testing, personnel qualification and etc. Performed Quality audit based on fabrication progress percentage and issued Client NCR for Contractor quality improvement, Monitoring Contractor quality work process such as; Procurement quality, material receiving, preservation of materials, production welding repair rate, NDE testing of welding and materials, closure audit report, NCR closure report & root cause analysis, manpower loading plan (mob/demob) & Fabrication KPI achievement.In-charged as Offshore Transportation and Installation QC manager:Prepared Approved Project Quality Procedures such as; PQP, ITP’s, Management of Change Procedure, Project Quality Objective Procedure, NCR Procedure, Audit Procedure, Coating/HSS Procedure, NDT Procedure, Welding Book, QC Organization Chart, Manpower loading and implementing the ISO 9001:2008 for quality assurance, quality planning, quality control and quality improvement. Managed 37 Pax’s QC crew such as; Welding Eng. Coating Eng. QC Eng. QC Supervisors; QC Welding Insp., QC Coating Insp, Tally Man, QC Document Controller, NDT Teams, HSS Operator Teams PU Foam Teams and QC Helpers. Control and monitor the implementation of inspection activities, verification strategy and compliance strategies based on approved ITP. Working with purchasing staff to establish quality requirements from external suppliers. Managing raw material testing, in-process testing and finished producing and release procedures. Effectively managed and coordinated with all quality vendors as per project requirement, such as; liaised with welding vendor, NDE Company, Coating Company, QC Tools Certification and 3rd Party Inspection to deliver the scope of work per project expectations. Show less

    • Technip

      Apr 2016 - Aug 2017
      Snr. QA/QC Representative

      Reviewed and commented project offshore QC documentation deliverable before submission for Company Approval such as; Project Quality Plan, Project Quality Objective (KPI), NCR Procedure, WPS, WQT, Coating Procedure, ITP’s, Welding Book, Welder Register, QC Organization Chart and etc. Managed 32 Pax’s offshore QC team such as; QC Supervisors, QC Welding Insp., QC Coating Insp., PU Foam Teams, QC Document Controller, NDT Teams, HSS Operator Team and QC Tallyman. Prepare offshore purchase request for all items of welding and coating including offshore office items requirement. Performed offshore readiness check for all station on firing line items including welding and HSS consumables before run the project and calculated the production cycle time to maximum productivity achievement and competency requirement. Monitor the implementation of inspection activities, verification strategy and compliance strategies based on approved ITP. Reviewed inspection report for Welding and NDT (AUT, PAUT, RT film) for welder qualification test and production test. Monitored daily welding and NDT (AUT and PAUT) quality reports, weld production records, repair rates, repair status, to ascertain and then submit to QC Manager. Coordinate the technical issue of welding, NDT and coating with all parties through technical meeting then reports to OCM and QC Manager. Attended KOM, daily progress meeting and weekly safety meeting. Show less

    • GEOCEAN

      Dec 2017 - Feb 2018
      Deputy QA/QC Manager

      Prepared QC documents deliverables, such as; PQP, ITP’s, Management of Change Procedure, Project Quality Objective Procedure, NCR Procedure, Audit Procedure, Coating/HSS Procedure, NDT Procedure, Welding Book, QC Organization Chart, Manpower loading and implementing the ISO 9001:2008 for quality assurance, quality planning, quality control and quality improvement. Supervised and managed 44 Pax’s Quality personnel, such as; Quality Team, welding vendor, NDE Company, Coating Company, QC Tools Certification and 3rd Party Inspection requirement to deliver the scope of work is in line with all project expectations. Monitor the implementation of inspection activities, verification strategy and compliance strategies based on approved ITP. Working with purchasing staff to establish quality requirements from external suppliers. Managing raw material testing, in-process testing and finished producing and release procedures. Performed and managed process audit schedule, internal audits, process audits, and product audits. Reviewed course and effects of weld defects and take remedial actions, reviewed daily welding, NDT (AUT, MPI) and HSS wrapping + PU Foam inspection reports then submit for client review and approval. Monitored the hydrotest preparation, gaskets installation, procedure and document required, NDT clearance, equipment cal. certificate, and the hydro test activities. Show less

    • Subsea7

      Mar 2018 - Apr 2019
      QA/QC Supervisor/Acting Deputy QC Manager

      In charged as QC Supervisor (acting Deputy QC Manager) approved by IK ARAMCO for 3 (three) Projects to implementing and managing quality management system as per Schedule-Q. Read and understood the Saudi Aramco documents and procedures (SAES, SAEP, SAIP, SAMSS, G.I std., DE & Schedule Q) related to quality scope. Prepared, issued and revised the project document deliverable as per Project contract agreement, such as; Project Quality Plan, Project Quality Objective (KPI), NCR Procedure, WPS, WQT, Coating Procedure and ITP’s. Prepare the Quality Control Personnel manning plan, 2 weeks look ahead, QC Organization Chart, QC Personnel loading plan based on calculation the cycle time and competency requirement. Monitor the implementation of inspection activities, verification strategy and compliance strategies based on approved ITP. Reviewed and submitted all of Saudi Aramco Inspection Checklist (SAIC) and Saudi Aramco Test Report (SATR) based on Saudi Aramco Typical Inspection Procedure (SATIP) for Client Approval. Writing non-conformance documents, identify the root cause, corrective action reports, and preventive action report to continually improve companywide quality. Supervised QC’s Mechanical and QC’s Electrical Instrument. Performed internal audit as per Audit procedure approval and Schedule Q. Reviewed and commented the daily record activities had prepared by QC Supervisor, Mechanical and Electrical Inspector on log book entry (LBE). Respond to closed the Client/ARAMCO PID violation. Prepared lesson learnt project assignment for QC mechanical and Electrical scope. Show less

    • PT. Meindo Elang Indah

      May 2019 - May 2022
      Corporate QC Manager (Dpy) and Project QC Manager

      PROJECT In charge as QC Manager: Various Onshore - Offshore Project STR/PLR ➢ DN SV - PMC/IGP Vietnam development project (Jacket and Topside Installation) – (in Vietnam)➢ Power Plant - Jawa1 (Pipeline and Jacket Topside & subsea spool Installation) – (in Indonesia)➢ SAKA - PGN (Pipeline and Jacket, Topside & subsea spool Installation) – (in Indonesia)➢ Petronas - Bukit Tuah (Pipeline, Jacket, Topside & subsea spool Installation) – (in Indonesia)In charge as supporting roles for various Offshore Project STR/PLR➢ PHE ONWJ (Previously was British Petroleum West Java) - KLD (Pipeline, Jacket, Topside & subsea spool Installation) – (in Indonesia)➢ PHE WMO (Previously was British Petroleum West Java) - 12 (Jacket, Topside & subsea spool Installation) – (in Indonesia)➢ PHM - JSN (Previously was TOTAL Indonesie) - Pipeline, Jacket, Topside & subsea spool Installation – (in Indonesia)➢ PERTAMINA RDMP - Lawe-Lawe (Pipeline 52inch+6in piggy bag & subsea spool Installation) – (in Indonesia)➢ PHE ONWJ - YYA (Pipeline and Jacket/Topside Installation) – (in Indonesia)➢ Medco Energy - Simenggaris (Structure Fabrication & offshore installation) – (in Indonesia) Show less

    • Aramco

      May 2022 - now
      ARAMCO CLIENT SITE REPRESENTATIVE – SAPID GIS Project Supervisor (Secondment of INTERTEK Singapore)

      PROJECT HELD: SAUDI ARAMCO Package-1 MARJAN Offshore GOSP-4 Development Unit (Indonesia – Batam), BI-10-12201-2. Working as Project Quality GIS Supervisor with SAUDI ARAMCO through Intertek Company Group, for Quality Assurance and Control, by proactive surveillance and request based inspection for complete fabrication of 3 Topside - 8 legs (Production Platform, Auxiliary Platform & Accommodation Platform) in McDermott Fabrication Facility Yard in Batam – Indonesia for SAUDI Arabian Oil Company (SAUDI ARAMCO).CONTRACTOR: PT McDermott – IndonesiaSUBCONTRACTOR: PT Rotary Engineering, PT WASCO Engineering, PT Toyo Engineering, PT NEXUS Engineering, PT SEAQUEST Engineering and etc. Show less

  • Licenses & Certifications

    • Welding Inspector 480hrs training (MIGAS)

      Balai Besar Bahan dan Barang Teknik (B4T) Bandung
    • Computer Hardware and Software application

      Institut Teknologi Bandung
    • ISO 9001:2008 Lead Auditor

      Bureau Veritas Group
    • Coating Inspector - Level 2

      SSPC: The Society for Protective Coatings
    • ISO 9001ː2015 Lead Auditor

      BSI
    • NDT ASNT Lev 2 MT/PT/UT/RT/VT

      ASNT (The American Society for Nondestructive Testing)
    • NDT UT Lev 2 ISO 9712

      Meena International
      May 2021
    • NDT RI PCN Level 2

      The British Institute of Non-Destructive Testing
    • CSWIP 3.2

      TWI Caspian Sea – Training and Engineering Services
    • CSWIP 3.1

      TWI Technology(S.E.Asia) Sdn.Bhd.