Alberto Arturo Luigi Carimati

Alberto Arturo Luigi Carimati

Trainee

Followers of Alberto Arturo Luigi Carimati964 followers
location of Alberto Arturo Luigi CarimatiSingapore

Connect with Alberto Arturo Luigi Carimati to Send Message

Connect

Connect with Alberto Arturo Luigi Carimati to Send Message

Connect
  • Timeline

  • About me

    SVP Technology and Operations at AICA Asia Pacific

  • Education

    • Liceo Scientifico

      1975 - 1980
      Maturita Scientifica
    • NUS Business School Executive Education

      2022 - 2022
      Python for Analytics
    • University of Adelaide

      2004 - 2006
      MBA Business Administration and Management, General
    • Politecnico di Milano

      1980 - 1985
      Laurea Chemical Engineering

      Process design

    • University of Adelaide

      2006 - 2007
      Master's degree Applied Finance
    • Università degli Studi di Milano

      1989 - 1997
      Laurea Biological Sciences
    • Columbia University

      2023 - 2023
      Certificate Applied Machine Learning

      The Applied Machine Learning course teaches a wide-ranging set of techniques of supervised and unsupervised machine learning approaches using Python as the programming language.

  • Experience

    • Stazione Sperimentale per I Combustibili

      Jul 1985 - Apr 1986
      Trainee

      Setting up automation for the new develop plug flow reactor and study catalytic systems for the production of higher alcohols from syngas

    • Stazione Sperimentale Per i Combustibili San Donato Milanese

      Jul 1987 - Dec 1990
      Researcher

      Participate in setting up a dynamic technique to characterize catalyst for the production of higher alcohols in a flux tubular reactor.We have also pioneer the study of using infrared images to verify the adsorpion heat on solids

    • Basf Italia

      Jan 1990 - Mar 1995
      Project Engineer

      Project leader for doubling the capacity of pigment reaction section, revamp Chloridric and Sulfuric acid storages, design and install an automatic washing bin station, total redesign and automatization of animal feedstuff production plant

    • BASF

      Jan 1990 - Jan 1995
      Process Engineer

      In charge of process study and major projects execution of fine chemicals production units.

    • Lonza Polymer and

      Jan 1995 - Jan 1997
      Project Manager

      PROJECT MANAGER (1995 – 1997)Worked with R&D, engineering and consultants to develop engineering package for 2 chemical technologies (PTA and PIA). Led technical group in feasibility study and costing for construction of a PIA production plant in Asia. Coordinated bid process for the US $130+ million project.

    • Lonza Singapore Pte Ltd

      Jan 1997 - Dec 2007

      Promoted from Process, Technical Services and IT Manager (2000 – 2002) and Process Manager (1997 – 2000) to direct all production, laboratory, maintenance, EHS, technical service and process activities for a plant. Reported to Managing Director and supervised 80 people in production, maintenance and technical services. Coordinated procurement of raw materials, manufacturing supplies and capital equipment. Planned and managed continuous improvement projects that ensured long-term sustainability and helped position company for acquisition. Example include modifications to mixing facilities, separation and slurry handling, resulting in 20,000/year additional output with a significant reduction in maintenance costs. Show less

      • Plant Manager

        Jan 2002 - Dec 2007
      • Technical Services and IT Manager

        Jan 2000 - Jan 2002
      • Process Manager

        Jan 1997 - Jan 2000
    • Perstorp Group

      Jan 2008 - Aug 2014
      MD / Site Manager

      Perstorp Singapore, PTE Ltd. (previously Lonza Singapore Pte Ltd./Lonza Polymer and Additives), SingaporeSITE MANAGER | MANAGING DIRECTOR (2008 – 2014)Promoted following acquisition to manage a US site producing Pure Isophthalic Acid (PIA) – #4 in the world at the time. Managed Production, Supply Chain, Engineering, Technical, Operations Management, QA, HR and Customer Service. Served as Managing Director with P&L accountability (2012 – 2013). Built leadership team (Controller, Supply Chain Manager, Production Manager, Maintenance Manager, HSEQ Manager, Technical Services and Process Manager, Laboratory Manager) and also managed 85 employees plus 20 outsourced maintenance professionals. Led technical and managerial projects to ensure operational excellence, resulting in continuous production increases, fixed and variable cost reductions, Lean manufacturing scheme, and safety culture. Achieved financial and product targets (quantity, quality, costs), and meeting/surpassing customer satisfaction while ensuring safety and compliance. Continually improved performance and uptime in a Lean manufacturing environment. Prepared operating budgets; reviewed/approved capital budget. Show less

    • AICA Asia Pacific Holdings Pte Ltd

      Aug 2014 - now
      SVP Technology and Operations

      AICA AP Holding Pte Ltd. (fka Dynea), SingaporeSVP OPERATIONS AND TECHNOLOGY (2014 – Present)As member of the senior management team, Rebuilt engineering / technology team – hired engineers and successfully integrated senior and junior engineers to increase productivity and innovation. Manage team in technology, engineering, operations and HSEQ on industrial construction projects, from design through commissioning, in the Asia Pacific region. Lead initiatives to improve operational excellence and HSEQ practices at 17 sites in China, Vietnam, Thailand, Malaysia, Singapore, Indonesia and New Zealand. Ensure uninterrupted technical, safety and continuous optimization support to 18 sites after splitting from original HQ in Finland. Realized all time, budget and quality metrics. Erected China’s first powder amino resin plant in Nanjing; reached 75% capacity within one year. Show less

  • Licenses & Certifications