Steeve Maston

Steeve maston

bookmark on deepenrich
location of Steeve MastonFrance
Phone number of Steeve Maston+91 xxxx xxxxx
Followers of Steeve Maston1000 followers
  • Timeline

    Mar 2007 - Jul 2007

    Materials Engineer

    Queensland University of Technology
    Aug 2007 - Jul 2008

    Composite Spar Maker (Gap Year)

    Southern Spars
    Feb 2009 - Jul 2009

    Materials Engineer

    CERIB
    Apr 2010 - Aug 2010

    Sales Manager

    Alter Solutions
    Aug 2010 - Dec 2017

    Project Manager - Design phases

    SYSTRA
    Paris Area, France
    Jan 2013 - Jan 2018

    Project Manager - Design Phases

    SYSTRA France
    Mar 2019 - Oct 2022

    Project Manager - Design & Construction phases

    SYSTRA France
    Greater Paris Metropolitan Region
    Current Company
    Oct 2022 - now

    Independent Certifier - Handover & Completion Engineer

    SYSTRA ANZ
  • About me

    CPEng, MIEAust, Project Manager at SYSTRA ANZ

  • Education

    • Insa toulouse

      2009 - 2010
      Master's degree business/commerce, general
    • University of southampton

      2008 - 2009
      Master of science (msc) advanced materials

      ERASMUS programme

    • Polytech montpellier

      -
    • Polytech'montpellier

      2005 - 2009
      Master of science (msc) materials science
  • Experience

    • Queensland university of technology

      Mar 2007 - Jul 2007
      Materials engineer

      In charge of a program of research being conducted by the “Co-operative Research Centre for Polymers” to develop polymers with controlled service lifetimes. The main objective was to determine the effect of several additives on the degradation rate and surface properties of thin Polyethylene films.

    • Southern spars

      Aug 2007 - Jul 2008
      Composite spar maker (gap year)

      Construction of booms and masts in carbon fiber for super yachts.

    • Cerib

      Feb 2009 - Jul 2009
      Materials engineer

      Participation in a research project on reducing the environmental impact of concrete. My main achievements were strategic foresight, formulation with industrial co-products, lab work, mechanical and durability tests.

    • Alter solutions

      Apr 2010 - Aug 2010
      Sales manager

      Commercial :- Prospection des comptes BASF, Rhodia, Novartis, Nexter,- Réunion de qualification technique des projets clients,- Elaboration de propositions techniques/commerciales.Recrutement :- Entretiens individuels techniques.

    • Systra

      Aug 2010 - Dec 2017

      2015 - 2017Level crossings removal - Greater Paris, FranceProgram manager for the removal of 6 level crossings. I was responsible of the preliminary design for the removal of several level crossings (Bruyère-sur-Oise, Fontenay-le-Vicomte, Us, Eplet, Maule and Beynes). The scope covered the following areas of expertise: environment, geotechnical studies, track, signalling, structure, and drainage.2014Transilien K Line - Operating & Technical studies - Greater Paris, FranceGrand Paris Express is a group of 4 new rapid transit lines and 2 extensions of existing lines being built around the Greater Paris. Responsible of the feasibility studies and the preliminary design to define the best possibilities for serving the K line with the new Grand Paris Express network. The scope included both operating and infrastructures studies.2013 Chartres Multimodal hub - Chartres, FranceA 130M€ (AUD $210 million) project to reorganize Chartres station to an intermodal hub and facilitate the passenger’s journey between trains, departmental buses, city buses, taxis, cars as well as bicycles.Responsible of the feasibility studies and the preliminary design including technical coordination (≈ 15 specialists), scheduling, cost monitoring and reporting. Show less In charge of tender’s preparation:- Preparation of bids in compliance with Bidding process,- Identification and assessment of bidding risks,- Organizes and holds the bid kick-off meeting,- Go / No Go meetings,- Manage the interfaces with Partners,- Contributes to the written proposal - both in terms of technical content and presentation.Key winnings (around 6.5 M€ of turnover):- Preliminary Design – Grand Paris Express – L17, 2011 -->1,2M€- Preliminary Design – Upgrade of the Paris RER C, 2011 -->940k€- Guadeloupe’s public transportation program and feasibility studies of the 1st tram line, 2011 --> 190k€- Limpopo rail plan – Phase 2, South-Africa, 2011 --> 180k€- Preliminary design – Upgrade of the Angers-Nantes rail line, 2010 --> 290k€ Show less

      • Project Manager - Design phases

        Sept 2013 - Dec 2017
      • Business Developer / Proposals Manager

        Jan 2012 - Aug 2013
      • Business Development Specialist / Bid Manager

        Aug 2010 - Dec 2011
    • Systra france

      Jan 2013 - Jan 2018
      Project manager - design phases

      Over 5 years’ experience on Project Management during the Design Phases of Transport projects. This experience includes technical coordination, contract administration, resource planning, cost control, internal & external reporting, and Stakeholder management.2103 - 2018Bry-Villiers-Champigny (BVC) station / SNCFGreater Paris, FranceThe ~320M€ (AUD $520 million) Bry-Villiers-Champigny station project will ensure the correspondence between the SNCF network and the future line 15 of the Paris metro. The scope of the new station project includes:• A passenger building overlooking the railway tracks, • An underground passage under the railway tracks to ensure correspondence with line 15,• 2 platforms, parallel to the railway tracks,• A third rail track in addition to the two existing tracks.I was in charge of the Concept & Preliminary Design for the creation of the new station, that includes cost control, stakeholder management, technical coordination (≈ 40 specialists) between several specialities: civil, track, signalling, telecommunications, energy, earthworks and hydraulic, management of passenger flows, environmental regulations.2016 - 2017Improvement of Massy area / SNCFGreater Paris, FranceA 50M€ (AUD $80 million) project to reorganize the rail tracks between several activities (Freight, Passenger’s services, and maintenance).Responsible of the feasibility studies and the preliminary design including technical coordination (alignment, track, signalling, catenary, drainage, structure, environment), scheduling, cost monitoring. Show less

    • Systra france

      Mar 2019 - Oct 2022

      From October-2020 to October-2022Railway noise walls program - EOLE and CDG Express projects / SNCFImplementation of acoustic protections (walls and facade treatment) along railway right-of-way to reduce noise pollution: 13 walls with a total length of 5km and facade treatment for 160 homes.Amount of operation: ~30 million€The 2 projects involve design and construction supervision for 13km of noise walls (between 2m to 5m high) along two railways in Greater Paris Area. The total expected amount of construction is around 35M€ (AUD $56 million).I was Project Manager during the Design phases (Preliminary & Detailed) and oversaw:• Relationships and interfaces with stakeholders,• Technical coordination (8 specialties, ≈ 20 specialists),• Risk assessment & monitoring,• Cost control, • Scheduling, • Internal & External reporting.From February-2022 to September-2022Eco-bridge Chantilly / SNCFChantilly Forest, Greater Paris, FranceConcept Design of an eco-bridge (30m X 35m) over 4 rail tracks in Chantilly Forest. The scope includes technical aspects (structures, geotechnical, catenary) and environmental aspects (landscape integration, animals’ paths, creation of pond). I was in charge of the interfaces with stakeholders, the coordination between the technical/environmental aspects and all the tasks related to project management (cost, schedule, reporting, etc.).From May-2021 to September-2022Research on innovating railway noise walls / SNCFVanves-Malakoff, Greater Paris, FrancePreliminary studies on the possibility of installing low height noise walls, infill panels or rail damper along a railway in Vanves-Malakoff area. Ihave done the benchmark (including interviews with manufacturers) and has supervised the technical studies and the security and safety analysis. Show less Electrification of the Gretz / Troyes line – Phase 1The 180M€ (AUD $280 million) electrification of Gretz/Troyes line project involved electrification of 50km on an operating railway, removal of 22 existing bridges and construction of higher one, re-signalling of the entire corridor, installation of around 3000 catenary poles, unwinding of more than 200km of overhead line and associated telecommunications and power system, and removal and disposal of rail infrastructure no longer required. The scope also covered the demolition of a tunnel and its substitution by an open trench in cutting piles and, the renewal of 500m of railway.As Deputy Construction Director, I managed a team of 20 surveillance officers and engineers through the construction phase. This involved the review of all D&C construction and commissioning activities, release of all hold/witness point, review and resolution of all NCRs and RFIs, attend completion inspections and identify defects, review of Work as Executed Drawings, and payment certification.I also provided support to the Construction Director in managing interfaces with the project stakeholders, reporting, resource planning, capability and competency management and project cost control. Show less

      • Project Manager - Design & Construction phases

        Oct 2020 - Oct 2022
      • Deputy Construction Director

        Mar 2019 - May 2021
    • Systra anz

      Oct 2022 - now
      Independent certifier - handover & completion engineer

      The Sydney Metro - Western Sydney Airport Project involves constructing and operating a new 23km metro line. The project includes tunnelling and surface works, 6 new stations, 2 services facilities, metro systems and rollingstock. Systra ANZ is Independent Certifier (IC).My scope includes :- Review of completion documentation,- Coordination with Surveillance Team to ensure timely close out of IC Issues, NCRs, Work lots review comments and RFIs,- Attend completion inspections and identify defects,- Follow up on defects until evidence is provided of resolution and close-out,- Coordinate the review of Asset Management Information and Work as Executed Drawings,- Participate in Completions meetings and working group,- Complete internal IC checklist for each portion prior to certification,- Provide input to the IC monthly progress and status report,- Maintain the IC Completion tracker. Show less

  • Licenses & Certifications

    • Project management

      Engineers australia
      Dec 2023