Alberto Pasca Areces, PMP®

Alberto Pasca Areces, PMP®

Process Engineer

Followers of Alberto Pasca Areces, PMP®763 followers
location of Alberto Pasca Areces, PMP®Madrid, Community of Madrid, Spain

Connect with Alberto Pasca Areces, PMP® to Send Message

Connect

Connect with Alberto Pasca Areces, PMP® to Send Message

Connect
  • Timeline

  • About me

    Assistant Manager at Red Sea Global

  • Education

    • Universidad Politécnica de Madrid

      2018 - 2020
      Master of Engineering - MEng Mining Engineering
    • Universidad Politécnica de Madrid

      2013 - 2018
      Bachelor of Engineering - BE Mining Engineering
    • AGH University of Science and Technology

      2019 - 2020
      Master of Engineering - MEng Mining Engineering
  • Experience

    • Incusa

      Feb 2018 - Aug 2018
      Process Engineer

      Collaborated in a project aimed at optimizing water usage efficiency in the mine production line, successfully reducing total annual water consumption from 2.4 million cubic meters to 400,000 cubic meters. Enhanced purification process efficiency by 90%, contributing to significant operational improvements.

    • Iberdrola

      Jan 2019 - Jul 2019
      Construction Engineer

      Participated in EPC projects for the construction of substations across Spain and Europe, contributing to design development, project planning, construction progress oversight, and contract management.

    • ARANER

      Nov 2020 - Mar 2023

      Led the RIBA Stage IV design of a Data Centre while acting at the same time as technology provider. Delivering the technical design ahead of schedule and with reduced engineering man-hours. Secured approvals for major equipment (chillers, pumps, fans) and issued purchase orders prior to my departure from the project.• Oversaw civil, mechanical, I&C, and electrical design to meet contractual deadlines.• Acted as the primary liaison with the client.• Planned and allocated resources within budget constraints.• Ensured timely and accurate invoicing in line with contract guidelines.• Negotiated contracts with external vendors.• Managed project documentation. Show less Took over the project halfway through and successfully completed it on time and within budget, commissioning one of the most efficient air-cooled district cooling plants in the Middle East, featuring innovative magnetic bearing chiller technology.• Oversaw the execution of the EPC project, ensuring adherence to timelines and budget.• Served as the primary liaison with the client.• Coordinated between Engineering and Projects Departments.• Planned and allocated resources (manpower, equipment, materials) within budget constraints.• Set clear targets, objectives, and responsibilities for the project team.• Ensured timely and accurate project invoicing in line with contract guidelines.• Reviewed and approved work plan documents, drawings, and deliverables at each stage.• Supervised the project team, providing guidance as needed.• Negotiated contracts with external vendors.• Managed project documentation.• Ensured proper project closeout. Show less Joined the EPC project consisting of a Water Cooled District Cooling Plant and a TES Tank during the superstructure phase until completion, assuming the role of Deputy Project Manager in the final stages and successfully securing TOC. All civil and MEP works were completed in accordance with the approved mitigation plan, and all snags were resolved within two months of the issuance of the snag list. Also acted as T&C Manager, overseeing the energization to full operational status of the plant, including systems such as centrifugal chillers, hydronic pumps, cooling towers, TES tank, submersible pumps, MV switchgear, RMU, MV softstarter, VFD, AHU, FAHU, FCU, drainage, UPS, diesel generator, SCADA, fire alarm, chemical dosing system.• Oversaw the execution of the EPC project within the established timeline and budget.• Coordinated efforts between Engineering and Projects Departments.• Planned and allocated resources (manpower, equipment, materials) while adhering to budget constraints.• Set clear targets, objectives, and responsibilities for the project team.• Reviewed and approved work plan documents, drawings, and deliverables at each stage.• Supervised the project team, providing guidance as needed.• Negotiate contracts with external vendors.• Managed project documentation.• Ensure proper project closeout. Show less

      • Project Manager

        Oct 2022 - Mar 2023
      • Project Manager

        May 2022 - Oct 2022
      • Site Manager

        Aug 2021 - May 2022
      • Project Engineer

        Nov 2020 - Aug 2021
    • MAXAM

      Mar 2023 - Dec 2023
      Project Manager

      Managed the blasting contract in a gold mine in Burkina Faso, driving an average of 2.4 tons of explosive sales per month. Achieved a 4-6% EBITDA improvement by optimizing logistics and production costs, and played a key role in renewing the service contract with the client.Key Responsibilities:• HSEQS: Maintained a safe work environment, ensured product and equipment safety, and compliance with company and quality standards.• Project Management: Delivered project objectives within timeframes, managed resources within budget, and maintained accurate production reports and forecasts.• Customer Relationship Management: Managed accounts, led contract administration, held business review meetings, and tracked KPIs.• Operational Management: Supervised site staff, managed third-party suppliers, and ensured contract deliverables were met.• Technical Services: Identified technical opportunities, optimized drilling and blasting practices, and supervised bulk product delivery. Show less

    • Red Sea Global

      Jan 2024 - now
      Assistant Manager
  • Licenses & Certifications

  • Honors & Awards

    • Awarded to Alberto Pasca Areces, PMP®
      AINDEX Award AINDEX May 2019 Recognized my Final Degree Project as the best of its promotion in the extractive mineral area.