Jing Tang

Jing tang

bookmark on deepenrich
location of Jing TangSingapore
Phone number of Jing Tang+91 xxxx xxxxx
Followers of Jing Tang282 followers
  • Timeline

    Current Company
    Apr 2009 - now

    Senior Principle Engineer

    Land Transport Authority (LTA) Singapore
  • About me

    Senior Principle Engineer (Rolling Stock), CEng MIMechE, PMP®

  • Education

    • Tongji university

      2006 - 2009
      Master's degree mechanical engineering
    • Tongji university

      2002 - 2006
      Bachelor's degree mechanical engineering related technologies/technicians
  • Experience

    • Land transport authority (lta) singapore

      Apr 2009 - now

      1. Lead the compaign with Train Operator to improve the reliability of Singapore North-South-East-West Line trains, conceived the forum to systematically review the train performance;The 5min delay MKBF(Mean Kilometers between Failure) is improving steadily through root cause analysis, remedy implementation and potential design improvement. The target to achieve 800,000km MKBF has been set(current 500,000km MKBF).2. Conduct technical review and audit on all the modification work initiated by the train operator to support the above;3. Lead the work process enhancement on the Application for Modification (AFM) process; expedited the approval process from 2 months to 3 weeks.4. Lead the drafting of tender documents of Technical Specification for Jurong Region Line Project for Passenger Train System. The specifications are approved and the tender is opened in Dec 2018. Show less 1. Led technical review for Passenger Train systems for Singapore Thomson and East-coast Line(T251), on the following sub-systems: a). Propulsion System;b). Braking System;c). Door System;d). Auxiliary Power Supply System;e). Interface with other contractors, e.g, signalling system;All the design documents are approved on schedule, train manufacturing process is ongoing.2. Participate Investigation of related incidents involving rolling stock on Singapore Existing Train Lines.3. Finalize the post-final Design issue of Singapore Downtown Line(C951). DTL trains are put in revenue service.4. Led the introduction of cutting-edge technology of Automatic Track Inspection System to detect the running rails and the 3rd rail anomalies for DTL trains. ATI system is successfully introduced and and is under commissioning on four DTL trains. Show less

      • Senior Principle Engineer

        Apr 2021 - now
      • Deputy Project Manager

        Apr 2017 - Mar 2021
      • Senior Engineer

        Apr 2012 - Apr 2017
      • Engineer

        Apr 2009 - Apr 2012
  • Licenses & Certifications