Chris McDonnell

Chris McDonnell

Director

Followers of Chris McDonnell1000 followers
location of Chris McDonnellIreland

Connect with Chris McDonnell to Send Message

Connect

Connect with Chris McDonnell to Send Message

Connect
  • Timeline

  • About me

    Electrical sub contractor, CMD Power Control

  • Education

    • Christian Brothers College

      -
      E Electrical and Electronics Engineering
  • Experience

    • CMD ELECTRICAL LIMITED

      Aug 2006 - now
      Director
    • Blackbourne Integrated M&E

      Jan 2010 - Sept 2012
      Electrician

      Electrical install on Royal Victoria Hospital Level 7 Maternity and level 4 Intensive care and isolation units.

    • O'Neills electrics ltd

      Feb 2012 - Dec 2013
      Electrical Contractor

      SCHOOLS BUNDLE THREE PPP, main contractor BAM. We provided electrical install on the Letterykenny educate together school.

    • GRAHAM Construction

      Mar 2012 - Oct 2012
      Electronic Engineer

      Fire alarm install works on Europa Bus Station, Strand Road Engineering Sheds, Milewater Engineering Sheds and Offices. This project was made complex as all the buildings were live and complete during normal working hours.

    • B.I. Electrical Services (NI) Ltd

      Aug 2012 - Oct 2012
      Electrician

      This project was a fire alarm install of 967 devices spanning over 7 separate buildings, which all had to be networked together, this project had to be complete over the summer months on a tight time schedule in order to be up and running in time for the new school year.

    • Dowds Group

      Feb 2013 - Nov 2013
      Electrical Contractor

      we carried out a total electrical install on one of the buildings on Monaghan Education Campus & Theatre

    • GRAHAM Construction

      Feb 2014 - Apr 2014
      Electrical Contractor

      51 sites in England, Scotland and Wales were surveyed between January and April 2014 with 23 sites selected for the monitoring and we installed equipment for monitoring.This equipment will measure the electricity used by the heat pumps and ancillary plant (pumps and auxiliary heaters), heat generated by the pumps and a number of key temperatures on the plant and the environment. The project involves both quantitative and qualitative aspects, looking at performance measurements and also the quality of the installations and how the equipment is used by the owners of the site. Readings are taken every minute, recorded by data loggers at each site and transmitted every hour via the cellular network to a dedicated server within the GRAHAM GROUP IT Department. Approximately one billion data points will be recorded over the two year project. Bespoke software was developed for this project to analyse the vast amount of data. This software will produce the results in a number of different formats like graphs and numerous charts for the project report. It will also allow DECC to view and download the data at any time from the secure web interface. Show less

    • G R WHITE LTD

      Sept 2014 - Mar 2015
      Electrical Contractor

      NDFA Bundle 1,main contractor JJ Rhatigan, we provided the total electrical install on two of these schools on behalf of G R White. School 1 was Navan Educate Together, Co. Meath and School 2 was Griffeen Valley, Co. Dublin 3

    • O'Hare and McGovern Ltd

      Jan 2015 - Feb 2016
      Electrical Contractor

      we are currently on site at Ballymakenny Post Primary on behalf of Norlect EngineeringThis Collage will have:Flexible learning spaces, bright, well-equipped specialist classrooms and labs, sports areas, social spaces for students, areas forextra-curricular activities, even storage facilities have all been carefully planned so that students are enabled to learn in abuilding that is attractively designed and suits their needs. Ballymakenny College will also be fully WiFi enabled, allowingInformation and Communications Technology to be integrated into the learning environment. It will be used as a learningtool and to link school, home and the local and global community.‹ Multimedia learning laboratory‹ Full range of practical rooms‹ Library‹ Full size gymnasium‹ Fitness suite‹ Music room‹ Special education needs suite Show less

    • CMD Power Control

      Feb 2015 - now
      Managing Director
    • Ardmac

      Jan 2017 - Apr 2017
      Electrical Sub Contractor

      For this project we completed the full electrical install of a 45,000 square foot Clean Room and associated offices and canteen on behalf of O Neill M&E

    • John Sisk & Son Ltd

      Jan 2018 - Nov 2018
      Electrical sub contractor

      470 holiday lodges at the new Longford Center Parcs.

  • Licenses & Certifications

    • Amey Security Clearence