
Timeline
About me
Freight Forwarder / Managing Director
Education

American concrete institute
-Concrete construction special inspector concrete
Sgs uk ltd
2006 - 2006Iso 9001 auditor
Port said miltary high school
1977 - 1980High school/secondary certificate programs
Arab academy for science, technology and maritime transport
2015 - 2017Master's degree mba quality management
Suez canal university
1981 - 1985Bsc civil engineering civil engineering very good
The american university in cairo
2007 - 2007Project management diploma project management
Experience

Egyptian army
May 1985 - May 1988Site civil engineerCivil Site Engineer at Various Concrete Construction Projects

Canal harbour & great projects co. egypt
May 1988 - Sept 1995PROJECT TITLE Construction Of Port Said/Port Fouad Ferry Boat Berth-LE 4 MillionCONTRACTOR Canal Harbor and Great Projects-Suez Canal Authority Firm CONSULTANT Engineering Department-Suez Canal Authority OWNER Suez Canal AuthorityDUTIES•Managing field work within the construction budget.•Oversee labor, equipment spread, efficiencies of the project for construction portion, and multiple subcontractors. •Responsible for cost budget - not project revenue.•During the proposal process the initial cost estimate will be developed which then becomes the cost budget, tracking expenditures against the cost budget - Actual costs vs. budgeted costs, Estimate at Completion (EAC), and Estimate to Complete (ETC).•Plot trends against budgets.•Managing Site Resources and Ensuring Adequate Staffing.•Determining heavy equipment needs •Managing Scope of Work by Identifying Change Conditions or Work outside of Scope.•Identification of additional scope work to the PM along with rough estimate of cost and schedule impacts.•Subcontract/Vendor Management.•Determining the need to subcontract work and support Procurement.•Developing the necessary scopes and requirements to provide to the Procurement department.•Managing vendor and subcontractor performance and scope, and Reporting. •Responsible for management of all phases of construction project activities from planning and execution for projects that range from small to large in value and a variety of scopes of work. •Directs preparation of Execution plans.•Supervises project teams.•Manages projects budgets and/or schedules. •May also support business proposals and development.PROJECTS DESCRIPTIONS •Dredging works for about 5,000 m2 •Removal of old sheet piles•Driving of new sheep piles 700 linear meter•Earth works for ferry boat area•Pouring reinforced concrete berth heads•Pouring reinforce concrete slab on grade for area about 10,000 m2•Fitting fenders and flood lights. Show less PROJECT TITLE Renovation Service Boats Bert located at El Tafreaa Entrance-Port Said- LE 2 MillionCONTRACTOR Canal Harbour and Great Projects-Suez Canal Authority Firm CONSUTLANT Engineering Department-Suez Canal Authority OWNER Suez Canal AuthorityPROJECTS DESCRIPTIONS Removal of concrete head for 1000 linear meterPouring of concrete head for 1000 linear meterEarth works for service boat areaPouring reinforce concrete slab on grade for area about 20,000 m2Fitting fenders and flood lights. Show less
Construction Manager
Jan 1993 - Sept 1995Senior Site Engineer
Oct 1990 - Jan 1993Site Civil Engineer
May 1988 - Oct 1990

(c.e.l.), egypt usa aid project
Sept 1995 - Aug 1997Qc inspectorPROJECT TITLE PORT SAID WASTE WATER TREATMENT PLANT (WWTP) - $ 120.000. CONTRACTOR MORRISON KNUDSEN CORPORATIONCONSULTANT CDM-American ConsultantOWNER National authority for drinking water and sanitationPROJECT DESCRIPTION•Construction of Port Said WWTP (occupy approximately 860 feddan).•Construction of offsite facilities consisting of the distribution force main ( 3500m of 1800mm diameter R.C. Pipes ), Mazrah influent Pumping Station. A Raw waste water force main ( 3000m of 2000mm diameter R.C. Pipes).•Construction of the Headwork facility consisting of flow measurement – scum barriers, bar screens and grit basins.•Construction of Waste water treatment lagoon.•Construction of an Effluent Pumping Station, Plant outfall ( 2500m) & Emergency outfall ( 500m R.C. Pipes).•Construction of Sludge processing facilities•Construction of an Operation Center consisting of Administrative – Warehouse, Laboratory, Maintenance, Covered storage & parking areas with total approximate are of 4600 sq. m•Construction of a Solid Storage Area 460 Feddans.•Site development: earthwork, soil stabilization, road constructionDUTIES -Being fully conversant with specified requirements and the PIP-Scheduling inspections of works to match progress-Ensuring the attainment of specified requirements-Raising NCRs for non-fulfillment of specified requirements in completed works-Expediting corrective and preventive action proposal responses to NCRs raised and their action upon -acceptance-Re-inspecting works to ensure corrective and preventive actions taken are adequate-Supervising and coordinating activities of workers engaged in inspecting incoming materials to ensure adherence to OCI quality standards and customer / client specification-Supports the Construction Team on consolidated punch-list team activities and subsequent acceptance of systems up to mechanical completion-Review Quality Control related change orders Show less

Orascom construction ltd
Mar 1998 - Dec 2000Qa/qc managerPROJECT TITLE Construction of three cement production linesPROJECT COST L.E. 1.500 millionCONTRACTOR CONSTRUM between ORASCOM and the French partner KRUP POLYSUISEMPLOYER Egyptian Company for Cement ( ECC)PROJECT DESCRIPTION Work includes the construction of the following:Production Line; Primary and secondary crushers, Raw mill hopper building, Raw mill building, Preheater building, Kiln foundations, Cooler buildings, Clinker Storage, Clinker hopper building, Stack foundation ,Cement silos consists of foundation, walls, cone and roof Air slides foundations, Packing and vehicles loading buildings, Conveyors foundations, Compressor, electrical roomsNon Production Building; Warehouse ,Administrative building ,Engineer office building ,Construction of 6000m3 water tank and 4000m3 water tank ,Desalination buildingElectrical Substation; Construction of control building, main substation building Foundation of high towers cable trenches and guardhouse buildings Show less

Orascom-s.a-jv
Jan 2001 - Aug 2002Qa/qc managerPROJECT TITLE Port Said Gas Fuel Power Plants of 2x341 MW Units –BOOT ProjectCONTRACTOR JV between ORASCOM INDUSTRIES CONSTRUCTION and S.A.E. INTERNATIONAL (French Company)EMPLOYER Electric De France (EDF)PROJECT DESCRIPTION Work includes the construction of the following:• For the process, Turbine halls, boiler islands, electrical buildings, chimney, fuel storage tanks, water treatment and storage, desalination plant, circulating water pipes, intake and discharge structures.• For the Logistics: Administration building, warehouse, workshop and guest house. Show less

Orascom-besix s.a-jv
Sept 2002 - Sept 2003Qa /qc managerPROJECT TITLE Maritime Loading Terminal for Liquefied Natural Gas Jetty at DamiettaSUB-CONTRACTOR JV between ORASCOM INDUSTRIES CONSTRUCTION and BESIX S.A. (Belgium Company) CONTRACTOR Damietta Liquefied Natural Gas Construction Company “L.L.C”EMPLOYER SEGAS S.A.E PROJECT DESCRIPTION • Work includes the construction of the following: Dredging of seabed to the required level and line (~ 354,000 m3). Seabed and shore protection for the dredged area (300,000 tons, of stone). Jetty: Main Causeway, Pipe Trestle, Pump Platform, Loading Platform.,3 Berthing Dolphins.,6 Mooring Dolphins. Walk ways (steel structure).,Installation and Commissioning of the specialized marine equipment such as Quick ,Release Hooks, Access gangway, crane for ship- goods, Sector and fenders land mark lights.• The loading platform and the dolphins are a concrete structure supported by steel piles. It is made of 185 steel piles length of 44 meters. The 185 piles are distributed among 120 piles diameter 1016 mm and 65 piles diameter 200mm. • The concrete structure is reinforced concrete and post-stressed concrete under the causeway. Large parts of the concrete structure are pre-cast. The finished concrete level placed on piles at level up to 6.50 m above the sea. Show less

Orascom construction ltd
Oct 2003 - Aug 2015Corporate QA/QC Manager of quality control managers in various projects with a wealth of experience gained in the marine, heavy industrial, power generation, infrastructure, waste water treatment and building sectors. Skilled in the development of quality documents, their implementation and maintenance, adept in ‘adding value’ and delivering continual improvement. Expertly ensured that quality management processes have been established (for more than 30 projects), are implemented and maintained in accordance with applicable Standards. Gathered and analyzed pertinent performance data and report upon it for review and any need for improvement to top management. Ensured that awareness of both client and legal requirements is promoted throughout OCI. Developed and oversaw the delivery of best practice training module(s) as required to engender continuous improvement for; workers, supervisors, engineers and technicians. Identified any additional ‘specialist’ training deemed beneficial and selection of staff for same. Mentored personnel and encouraged improvement of skill sets. Show less Upon promotion I managed the quality function of the company’s Power Generation Division. Here I ensured projects were adequately resourced and mentored staff to improve their skill sets. I developed and ensured implementation of inspection and test plans and procedures, and ensured generation and subsequent collation of quality records into hand-over packages. In this role I oversaw three gas power plants, Abi Qir (2X650 MW), El Tebbin (750MW) and Sidi Krir (750 MW), valued at 1,420M EGP, 750M EGP and 780M EGP respectively.Projects titles-Abu Qir Thermal Power Plant, MW Gas/Oil Fired Units-Sidi Krir Power Plant Station 750 MW Combined Cycle-El Tebbin Thermal Power Plant 2x350 MW Gas/Oil Fired UnitsOwner:Ministry Of Electricity and EnergyContractor: Consortium of Besix NV and Orascom Construction IndustriesConsultant Power Generation Engineering and Services Company (PGESCo)Description of Abu Qir ProjectWork includes construction of the following:• Power Generation Facilities; 2 Steam Generator Foundations& One Steam Turbine Building Foundation& 2 Chimneys including piling& Plant Waste Water drainage collection sumps& Lube Oil Storage tank foundation& Boiler Feed water pump piling, pedestal foundation, columns and table top& Boiler Feed Water Boosters pump foundations& Chemical injection skid foundations & One Electrical/Control Building super structure & Two Main Set-up Transformer Foundations and Transformers.• Auxiliary Facilities; Mazout Oil Heaters and Burners pumps foundations& Diesel Generator foundations & Solar Oil / Mazout Oil Tanks& Circulating Pump House& Circulating Water Electrical Equipment Building Structure& Sodium Hypochlorite Generation Area &Desalinated Water Tanks Foundations& Water treatment plant & Sewage Treatment Area.• Road WorksDuties Performed the function of establishing, implementing and maintaining of QMS for three power generation projects. Managed a team of 70 professional Engineers and Inspectors. Show less Senior QA/QC Manager, managed the quality function at New Talkha Gas Power Plant (750MW), ensuring specification requirements were fulfilled through the development of inspection and test plans and ensuring a robust inspection regime was undertaken.Project Title New Talkha Power Station 750MW Combined Cycle Project-LE275 millionOwner Ministry Of Electricity and EnergyContractor Consortium of Besix NV and Orascom Construction IndustriesConsultant Power Generation Engineering and Services Company (PGESCo)Description of Project Power Generation Facilities Underground Facilities Piling and Road Works Office Buildings Circulating Water PipesDuties:•Set up and organize the site Quality Management•Instill awareness and instruct the staff in implementing the Quality Assurance Procedures (QAP) and ensure implementation.•Provide assistance in the project quality plan (PQP) •Check that the organizational documents of subcontractors PQP adhere to the contract.•Check that the Company and subcontractors implement the PQPs.•Organize work plans. Supervise and/or execute the inspections for hold points release.•Execute verification on inspections carried out by production personnel.•Ensure that all planned inspections are carried out (for Civil, Mechanical & Electrical works).•Coordinate and supervise the products qualifications and process tests.•Monitor the solving the non-conformance (NC) and keep the corresponding status reports.•Carry out global analysis of the NCs and dysfunctions to determine and implement corrective actions.•Attending all technical meeting held between all parties including the Employer, Consultant and the Contractor.•Preparing QA/QC general reports to the Project Manager & supervision of annual QA/QC recordsby the end of each project.•Submitting the technical proposals for the critical technical problems and following up the execution.•Managing the Laboratory & welding activities Show less PROJECT TITLE NUBARIA POWER STATION I & II 2x750 MW (NOMINAL) COMBINED CYCLE OFF-SITE INTAKE AND DISCHARGE CP-119CONTRACTOR ORASCOM INDUSTRIES COMPANYCONSULTANT POWER GENERATION ENGINEERING and Services Company (PGESCo) OWNER MINISTRY OF ELECTRICUTY AND ENERGY West Delta Electricity Production Company PROJECT DESCRIPTION Work includes the construction of the following:• Cooling water Intake & Discharge structures at Nubaria canal.• Two 2500 mm inside diameter Intake pipes (with length ~ 900 ms).• Two 2500 mm inside diameter Discharge pipes (with length ~ 1200 ms).• High density polyether (HDPE) pipe 160 mm drain pipe line (with length equal ~ 800 ms).Trash bar screen and bar screen raking system.• Crossing under Railway for treated water discharge pipe, 600 V cable and Intake and discharge cooling water pipes.• Sluice gates at Intake & Discharge structures.• Shore protection works on front and sides of Intake & Discharge structure at Nubaria canal (Dredging, Geotextile, filter and Riprap works).• 14 security rooms above the Intake and Discharge pipes. Show less
Corporate QA/QC Manager
Oct 2009 - Aug 2015Business Unit QA/QC Manager
Dec 2007 - Oct 2009Senior Quality QA/QC Manager
Jan 2005 - Nov 2007QA /QC Manager
Oct 2003 - Dec 2004

Emaar misr
Sept 2015 - Oct 2019Deputy qa/qc directorHead of Quality Professionally establish general guidelines and requirements for QA/QC and HSE during construction. Efficiently manage and direct consultants, as required to meet /follow the established QC and HSE construction requirements. Closely monitor consultant and contractor activities. Regularly attend all QA and HSE meetings, and make decisions with his authority. Handle the review /Approve QA/QC and HSE site organization, key personnel CVs, QA/QC and HSE Procedures and Document Control as submitted by the contractors and ensure implementation is in compliance with contract requirements. Proficiently review the contract documents for each Construction Package in respect of QA/QC and HSE requirements and procedures and advise the project manager of any improvement required. Show less

Orascom construction
Mar 2020 - Mar 2022Deputy quality director
Self-employed
Dec 2021 - nowManaging director
Across universe cargo logistics aucl
Jan 2022 - nowManaging director
Licenses & Certifications

Civil consultant engineer
نقابة المهندسين المصريةJan 2005
Professional masters degree in quality management
Arab academy for science, technology and maritime transportOct 2017
Languages
- enEnglish
Recommendations

Katelyn eppinger
Network Engineer at VerizonIrving, Texas, United States
Subramani esakkiraja
QC Engineer at Emerson Asia Pacific Pte LtdSingapore
Shaurya pratap singh
Embedded Software Developer | B.Tech (ECE)Dewinter Microscope
Kevin oyarzo
Fleet Metrics Program Manager and Senior Metrics Analyst for Fleet Management at Montgomery CountyWashington DC-Baltimore Area
王羽茜
客户经理 - 赛尔网络有限公司湖北分公司Wuhan, Hubei, China
Sid carlisle
Out of Retirement and Back to Work for a Fantastic CompanyMesa, Arizona, United States
Helen silva
Administração | Security AVSEC | Auditoria | AeroportosAracaju, Sergipe, Brazil
Matthew carter
Managing PartnerGreater Houston
Cody van beek-hagemans
Scientist Innovator in Circular Electronics Team at TNONieuwegein, Utrecht, Netherlands
Jenifer joseph
Montessori Teacher at Cuddle Castle Nursery Al Dafna, Doha QatarQatar
...