
Timeline
About me
Planner at Qatar International Golf Club Project
Education

Anna university
2003 - 2007Bachelor of engineering - be civil engineering aActivities and Societies: Professional Affiliations: • Member of American Society of Civil Engineers(ASCE) • Member of Institute of Civil Engineers (ICE United Kingdom) • Member of Association of Environmental & Engineering Geologists (AEG). • Member of Institute of Engineers India (Qatar Chapter). Field of Interest: Structural Design, Geographical Information System, Environmental Engineering&Project Management.Relevant Courses:Engineering Mechanics, Structural Design, Strength of Materials, Soil Mechanics, Applied Hydraulic Engineering, Hydrology, Construction management, Environmental Engineering.Under Graduation Project (2007): “Optimization of Channel Design” Computation of Various well-defined Parameters of the irrigation channel using the intelligent techniques Like Genetic… Show more Field of Interest: Structural Design, Geographical Information System, Environmental Engineering&Project Management.Relevant Courses:Engineering Mechanics, Structural Design, Strength of Materials, Soil Mechanics, Applied Hydraulic Engineering, Hydrology, Construction management, Environmental Engineering.Under Graduation Project (2007): “Optimization of Channel Design” Computation of Various well-defined Parameters of the irrigation channel using the intelligent techniques Like Genetic Algorithm & Ants Colony Optimization has been elaborated in the Project. Both the Systems of computing the parameters have been compared for their accuracy and reliable System is suggested for its potential and is proposed. Finally the results obtained with the Genetic Algorithm and Ants Colony Optimization Techniques were compared with the results obtained.Software’s: Mat Lab (Neuro fuzzy logic Technique) Show less
Experience

Tata consultancy services
Dec 2007 - May 2008Assistant system engineer* Training in corporate management and client relation etiquette.* Trained in Software Engineering, Oracle 10.0 and basics of programming C++

Ever sendai engineering p.ltd
Jun 2008 - Jul 2010Assistant engineer• Perform complete tasks like implementing the stages of construction stages by coordinating with multidiscipline design team.• Responsible for management of material and human resources on sites Supervision of constructional works at site.• Maintain reports of contractors for proper execution of key projects on a daily basis Assist engineers in designing layout and site research.• Act as liaison between builders and contractors to ensure adequate supply of resources • Coordinate with site inspectors to check the ongoing project status and development.• Conducted regular meetings with site team and explained the targets and reviewed the progress as well as attended meetings with clients, architects and structural consultants to discuss the project progress and resolve issues. Coordinated with MEP contractors at all stages of execution of work as main contractor. Onsite Program: June’08 – July ‘09 Worked as a Design Engineer which involves the Design of Steel Structures especially Column and Beam connections design, Design of fin plate, Column Base plate for High rise Buildings using British code BS5950.The projects involved are Burj Khalifa, Dubai Mall and Capital Tower of Abu Dhabi.Software’s: STAAD-Pro, ETABS, Mathcad & Auto-CADD As Planning Engineer • Prepared initial mobilization plan for the project; scheduled time durations using MS project and/or Primavera and planned the resources also followed and monitored the same.• Prepared cash flow statements, Labor histograms, projecting budgeted cost, S curves, earned value analysis for the project.• Negotiate quotations and contractual terms with vendors, sub agency and sub-contractor.• Responsible in preparation of catch up programs and micro level schedules at site-level for projects during demanding stages.• Prepared MIS reports for monitoring financial progress of the project.• Made presentation of site status to management in monthly meeting. Show less

Politecnico di torino
Sept 2010 - Sept 2012Graduate research fellowProject Management: A combined cycle power plant which involves ‘gas and steam power plant’ has a production capacity of 52 MW and total budget of three million euro’s. • General working principle• List of suppliers and their standards• Preparation of work breakdown structure and organization breakdown structure• Project crashing• Report calculationSoftware’s: MS Project ’13 and Primavera P6 V8.2• Resources and Environmental Economics: • Energy analysis of prescribed country which includes green labels, type of economy and management strategies. • Life cycle assessment of a product with CML 1992 V2 Show less

Regal interiors ltd
Sept 2012 - Jan 2014Planning engineer• Prepared initial mobilization plan for the project; scheduled time durations using MS project and/or Primavera and planned the resources also followed and monitored the same.• Prepared cash flow statements, Labor histograms, projecting budgeted cost, S curves, earned value analysis for the project.• Negotiate quotations and contractual terms with vendors, sub agency and sub-contractor.• Responsible in preparation of catch up programs and micro level schedules at site-level for projects during demanding stages. Show less

Contraco w.l.l.
Mar 2014 - nowPlanning engineerProject: Qatar Foundation Golf Club Doha QatarContract Value: 150 Million USD Approx.• Preparation of Contractual construction schedules, updates and monitoring.• Evaluation of tenders to determine that separate subcontractor’s schedules and any qualifications to those schedules meet overall project time Requirements.• Provide recommendations when actual progress deviates from schedules progress so that work may be re-scheduled or accelerated to provide for on-time completion.• Directly responsible for the preparation of the month schedule portion of the monthly progress report, including narrative and all scheduling update reports,• Look ahead Schedules• Key performance Indicators (KPI’s)• Resource and Cost loading• Cash Flow• Resource Histograms• Attend weekly meetings for both client and internal• Monitoring & Controlling the Progress• Prepared cash flow statements, Labor histograms, projecting budgeted cost, S curves, earned value analysis for the project.• Responsible in preparation of catch up programs and micro level schedules at site-level for projects during demanding stages.• Preparation of Recovery Plans and Extension of Time (EOT) Claims. Show less
Licenses & Certifications
- View certificate

Cost control for construction projects
Planning engineerDec 2022 - View certificate

Mmup upda
Ministry of municipality and environment, qatarOct 2018
Languages
- itItalian
- enEnglish
- hiHindi
- taTamil
- urUrdu
Recommendations

Christian membrive romero
Customer Success Engineer II en DynatraceMataró, Catalonia, Spain
Jill feimster
Bentonville, Arkansas, United States
Diego davi
Lesson Creator na RealLife EnglishDistrito Federal, Brasil
Fadhel bey
Freelance Data Automation Specialistتونس
Anthony quinones
Relationship Development Officer at Frontier Credit Union | Treasure ValleyMeridian, Idaho, United States
Ann gillespie
Manager, Business Administration | People-Focused Manager | Fostering Growth & Diversity | Talent A...Berlin, New Jersey, United States
Dimitris korres
Commercial Operations Manager at Hellas DirectGreece
Guy stevenson, rn, bsn, mba-hm
Director of EMS Relations; HCA Central/West Texas (St. David's HealthCare and Las Palmas Del Sol Hea...Austin, Texas Metropolitan Area
Shivika sharma
Research at Microsoft ResearchDelhi, India
Brian frandjaja, s.ak, csma
Currently Business Development Officer | Accounting - Finance Major | Digital Marketing (Advertiser)...Kecamatan Medan Kota, North Sumatra, Indonesia
...