Zeng Guosheng

Zeng Guosheng

Production Lead and quality director

Followers of Zeng Guosheng253 followers
location of Zeng GuoshengChangzhou, Jiangsu, China

Connect with Zeng Guosheng to Send Message

Connect

Connect with Zeng Guosheng to Send Message

Connect
  • Timeline

  • About me

    Seaquest marine - hull supervisorPMP-3095058

  • Education

    •  Project Management Profession (PMP-3095058)

      -
    • 大连理工大学

      -
      学士 Naval Architecture and Marine Engineering
  • Experience

    • Samsung Heavy Industries

      Jan 1999 - Jan 2007
      Production Lead and quality director

      In NingBo Samsung corp production divison. responsible for the overall production planning and control can be implemented During the participation of NingBo new factory project construction and management.- Production department director is mainly responsible for implementation of production plans and production process.- Quality director of QA office responsible for the product quality control and customer communication of the entire firm.

    • Bremer Bereederungsgesellschaft mbH & Co. KG

      Mar 2007 - Dec 2012
      Hull and painting supervision

      4X The 4250 container ships supervision in ZheJiang shipyard. Classification: GL10X57000 bulk carriers supervision in New HanTong shipyard. Classification: LRJob Content:1. Assisted the project manager to set up the office document system and sorted out the relevant drawings and documents of the new shipbuilding project. To launch a new project quality meeting in the shipyard.2 Track and confirm the relevant classification and production plans. Conduct necessary communication in shipyard and classification society to ensure that the project meets technical specification requirements.3 The ship structure and internal outfitting inspection are mainly responsible for the construction of new shipbuilding projects and on-site inspection and control are carried out according to the requirements of relevant structural specifications and draw requirements .Including structural outfitting inspection to ensure that the new shipbuilding project is progressing according to the plan and specification.4 Daily inspection of the site to detect problems and solve problems.5 Check the related experiment and performance test of new shipbuilding and form relevant document system.6 Sea trial inspection and performance test. Show less

    • TEH-UC CARGOCEAN MANGEMENT CO.,LTD

      Jan 2013 - Jan 2014
      Construction supervision

      1X 206.000 DWT bulk carriers supervisionClassification: DNV+GLJob Content:1. Assisted the project manager to set up the office document system and sorted out the relevant drawings and documents of the new shipbuilding project. To launch a new project quality meeting in the shipyard.2 Track and confirm the relevant classification and production plans. Conduct necessary communication in shipyard and classification society to ensure that the project meets technical specification requirements.3 The ship structure and internal outfitting inspection are mainly responsible for the construction of new shipbuilding projects and on-site inspection and control are carried out according to the requirements of relevant structural specifications and draw requirements .Including structural outfitting inspection to ensure that the new shipbuilding project is progressing according to the plan and specification.4 Daily inspection of the site to detect problems and solve problems.5 Check the related experiment and performance test of new shipbuilding and form relevant document system.6 Sea trial inspection and performance test. Show less

    • Bremer Bereederungsgesellschaft mbH & Co. KG

      Jan 2014 - Aug 2016
      Hull supervisor

      12X64000bulk carriers supervision Classification: LRJob Content:1. Assisted the project manager to set up the office document system and sorted out the relevant drawings and documents of the new shipbuilding project. To launch a new project quality meeting in the shipyard.2 Track and confirm the relevant classification and production plans. Conduct necessary communication in shipyard and classification society to ensure that the project meets technical specification requirements.3 The ship structure and internal outfitting inspection are mainly responsible for the construction of new shipbuilding projects and on-site inspection and control are carried out according to the requirements of relevant structural specifications and draw requirements .Including structural outfitting inspection to ensure that the new shipbuilding project is progressing according to the plan and specification.4 Daily inspection of the site to detect problems and solve problems.5 Check the related experiment and performance test of new shipbuilding and form relevant document system.6 Sea trial inspection and performance test. Show less

    • YUNDOM PRECISION METAL WORKS

      Feb 2017 - Oct 2018
      Quality Assurance Manager

      Industry: wind energy1. System operation: formulate the quality policy and quality objectives of the company; Ensure the maintenance, supervision and management of the operation effectiveness of the quality management system;2. Process control: responsible for product process, work instructions, inspection standard formulation and audit, the production process of product inspection, quality control, ensure the quality of the product in the process of production management. All quality standards and inspection standard design technology, quality control circle all the quality improvement of the production process documentation. It also puts forward improvement Suggestions to reduce the quality cost of the product.3. Corrective measures: when there are existing or potential quality problems, the corrective and preventive measures are put forward and the implementation effect is followed.4.Complaint processing: external or internal quality complaint processing, quality problem analysis, quality improvement tracking and the final closure of quality issues; The implementation supervision of process documents of each process and the quality inspection department of the branch can solve the quality problems in the production process at any time5.Communication and coordination: to communicate, coordinate and confirm the non-technical quality disputes between factories.6. In accordance with the requirements of quality manual and procedure documents, coordinate the quality management departments and departments7. In charge of the quality inspection standard of aluminum alloy products and welding process of aluminum alloy products according to EU EN1090-1/2 standard, set up the CE aluminum product certification system and EU product inspection standard. Show less

    • Ryal Marine Holdings Pte.,Ltd

      Oct 2018 - Dec 2018
      Hull and Ship outfitting supervision

      Four 64K wood ships in Chengxi Yangzhou shipping Co.,Ltd Classification: NKJob Content:1. Assisted the project manager to set up the office document system and sorted out the relevant drawings and documents of the new shipbuilding project. To launch a new project quality meeting in the shipyard.2 Track and confirm the relevant classification and production plans. Conduct necessary communication in shipyard and classification society to ensure that the project meets technical specification requirements.3 The ship structure and internal outfitting inspection are mainly responsible for the construction of new shipbuilding projects and on-site inspection and control are carried out according to the requirements of relevant structural specifications and draw requirements .Including structural outfitting inspection to ensure that the new shipbuilding project is progressing according to the plan and specification.4 Daily inspection of the site to detect problems and solve problems.5 Check the related experiment and performance test of new shipbuilding and form relevant document system.6 Sea trial inspection and performance test. Show less

    • TEH-HU CARGOCEAN MANGEMENT CO.,LTD

      Dec 2018 - Oct 2019
      Hull and Ship outfitting supervision

      180.000 DWT bulk carriers supervision in ShangHai WaiGaoQiao shipyardClassification: ABSJob Content:1. Assisted the project manager to set up the office document system and sorted out the relevant drawings and documents of the new shipbuilding project. To launch a new project quality meeting in the shipyard.2 Track and confirm the relevant classification and production plans. Conduct necessary communication in shipyard and classification society to ensure that the project meets technical specification requirements.3 The ship structure and internal outfitting inspection are mainly responsible for the construction of new shipbuilding projects and on-site inspection and control are carried out according to the requirements of relevant structural specifications and draw requirements .Including structural outfitting inspection to ensure that the new shipbuilding project is progressing according to the plan and specification.4 Daily inspection of the site to detect problems and solve problems.5 Check the related experiment and performance test of new shipbuilding and form relevant document system.6 Sea trial inspection and performance test. Show less

    • Schulte Marine Concept

      Oct 2019 - now

      Project name: BC64K (8*64000DWT Bulk Carrier) Class: BV1. structure inspection, including WPS, material certificates , welders certifications, dimensional control.2. deck and accommodation outfitting installation.3. storage of material and welding consumables inspection.4. equipment protection / cleanliness inspection.5. supporting other supervisors(welding,materials,NDT,pipes prefabrication,insulation,etc ).6. subcontractors pre-inspections.7. regular patrol inspections.8. filling & reporting. Show less

      • hull supervisor

        Jun 2021 - now
      • Hull supervisor

        Jun 2020 - Jun 2021
      • Hull Supervisor

        Oct 2019 - Jun 2020
    • SeaQuest Marine S.A.

      Jul 2022 - now
      Hull supervisor

      1.Position: Hull Supervisor 2.Ship type/Classification: 210K DWT Bulk Carrier (LNG DUAL FUEL MEGI)3.Shipowner: Himalaya Shipping 4.Shipyard: New times shipbuilding CO; LTD. China (NTS)5.Main responsibilities: supervision of block prefabrication, hull erection, cargo pipes welding; inspection of deck outfitting installation and insulation; all insulations and accommodation cabin integrity inspection.

  • Licenses & Certifications

    • PMP

      Project Management Institute
      Jun 2021