WASIM RAYYES

WASIM RAYYES

Trainee

Followers of WASIM RAYYES665 followers
location of WASIM RAYYESDubai, United Arab Emirates

Connect with WASIM RAYYES to Send Message

Connect

Connect with WASIM RAYYES to Send Message

Connect
  • Timeline

  • About me

    Project/Construction Manager | MBA | PMP®| LEED GA | NEBOSH | DM Certified | OSE Classified

  • Education

    • IUG - Palestine

      2001 - 2006
      Bachelor of Engineering (B.E.) Civil Engineering 86.2%

      Activities and Societies: Chess Team

    • Alkarmel

      1998 - 2001
      General Studies 94.1%

      Activities and Societies: Football Team Chess Team

    • The International Business Academy of Switzerland

      2021 - 2022
      Master of Business Administration - MBA Business Administration and Management, General
  • Experience

    • UNRWA

      Jan 2003 - Sept 2004
      Trainee
    • Consolidated Contractors International Company

      Feb 2005 - May 2023

      UPGRADING OF FALAJ QABAEL ROUND ABOUT – SOHAR- OMAN• Construction of 480m Flyover Bridge above the existing Roundabout. • Construction of 1386 km of Retaining Wall and 11,410 m2 Mechanically Stabilized Earth Wall MSE• Construction of infrastructures (Pipe Culvert – Box culvert – Drainage, Ducts, etc...)• Electrical network (Substations, 33 and 11 kva lines, street lighting, etc….).• Telecommunication network (Laying of New Oman tell FOC and GTO cables).• Protection and relocation of all existing utilities in compliance with the requirements of the authorities/ owners.• Installation of roadside furniture (traffic signs, pavement marking, etc.) and protection work on embankment slopes. Show less DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT - MUSCATProject Scope: The works comprise the construction of the new runway and taxiway system, apron, power centers, utilities, landside and airside roads, landscaping &upgrade of the existing facilities.Responsible for: (Aug 2012 – Sep 2013)• Construction of the stormwater system and fuel separators for the airport, with 25,000m3 of riprap protection.• Construction of 29 no. of bridge houses fully equipped with services such as (water - electricity - fuel - sewage, etc…) and to connect the aircraft to the terminal building.• Construction of 1200m of retaining walls. (Jan 2011 – Aug 2012)• Production and transport of 5,000,000 m3 of crushed stone material to project plants (asphalt/concrete/stabilizer), and 8,000,000 m3 of rock fill material to the site. (Sep 2009 – Jan 2011)• Construction of 200 m flyover box Girder Bridge with all furniture at Sultan Qaboos Street. Show less DUELAIZATION OF SOHAR BURAIMI ROAD - SOHARProject Cost: 140 Million US dollars.Project Scope: Expansion and construction of 81.4 Km asphalted road, construction of 18 bridges, two underpasses along with necessary drainage structure, road protection, relocation of existing services, installing street lighting and road furniture.Responsible for:• Construction of 6 No. of precast girder bridges with all furniture.• Construction of the stormwater system along 40km of road with its riprap protection.• Construction of the road infrastructures along 40km of road.• Finishing work (Guard Rail, road stud, road marking, Barriers, signboard, reflectors… etc). Show less

      • Construction Manager

        Apr 2019 - May 2023
      • Zone Manager

        Apr 2017 - Dec 2020
      • Senior Project Engineer

        Aug 2016 - Apr 2017
      • Section Engineer

        Sept 2013 - Oct 2016
      • Section Engineer

        Sept 2009 - Sept 2013
      • Site Engineer

        Jun 2005 - Sept 2009
      • Trainee

        Feb 2005 - Mar 2006
    • 中国铁建国际集团

      Dec 2020 - Dec 2021
      Construction Manager

      • In charge of 16 No. bridge structures at DMA and KIZAD area (Over bridges –Under bridges -underpasses- Utility bridges).• Close monitor the construction productivity and schedule performance, especially for the main railway bridges crossing Abu Dhabi – AL Ain Road, Abu Dhabi – Dubai Road, and Al Faya Road.• Coordinate with Client (Etihad Rail) and Consultant (Jacobs), by attending meetings, preparing Plans & submitting schedules.• Liaise and interface with authorities and providers such as (Adnoc, Transco, Etisalat, and Du), obtain related permits, and follow regulations to ensure the construction/protection takes account of their requirements and asset handovers are completed in time. Show less

    • Cloisall Co. LLC

      Apr 2022 - Sept 2022
      Construction Manager

      Manage the construction site on a day-to-day basis, including supervising the labor force, monitoring subcontractors, checking materials, inspecting work, and overseeing quality control.• Monitor the progress and effectiveness of the project quality management system. recommend and implement improvements when required.• Ensure the project is delivered on time within budget by setting benchmarks, agreeing to budgets, and monitoring progress.• Reviews client, customer, and user feedback.• Action and close all site observations and complaints.• Conduct regular meetings to ensure effective communication and transparency.• Perform quality audits of on‐site construction activities.• Produce and develop the Project Quality Training Plan. Ensure implementation of the plan. Ensure that training records are maintained. Show less

    • Al Jaber Engineering W.L.L

      Oct 2022 - now
      Sr. Construction manager

      project developed is a 200-key 5-star Hospitality Development consisting of a Hotel Main Building, Spa, Beach Club, Specialty Restaurant, and Chedi Villas (50 Keys).They contain the construction of.• 200 units divided into Type A guest rooms (40 sqm) at 25% and Type B guest rooms (37 sqm.) at 75%.• The Spa consists of 10 treatment rooms, dry & water Gyms, and an outdoor pool.• The Beach Club provides a unique F&B outlet and boasts of a 101-meter-long pool.• The 25 nos. of villa units (50 Keys) are oriented and positioned to respect natural topography as well as to maximize views.• The specialty restaurant, a stand-alone structure on the beach offers a fine dining experience.• Security block (main entrance + driver room), Security block 2 (service entrance).• Chiller yard, Substation 1 and Substation 2. Show less

  • Licenses & Certifications

    • AutoCAD

      IUG
      Jul 2004
    • STAAD Pro

      IUG
      Jan 2004
    • Motivation

      Consolidated Contractors International Company
      Dec 2007
    • Supervisor Specific Safety

      OSHA Safety Training Institute
      Feb 2013
    • Introduction to LEED Credentialing

      LinkedIn
      Apr 2020
      View certificate certificate
    • International General Certificate in Occupational Health and Safety

      NEBOSH
      Apr 2018
    • Value Engineering

      Project Management Institute
      Mar 2014
    • Quality Management

      Project Management Institute
      Sept 2014
    • Business Performance Improvement Workshop

      USAID
      Jan 2006
    • PMP® Certification Training Course

      Project Management Institute
      Jan 2019