Maytham Arif Oun

Maytham Arif Oun

Piping Engineer

Followers of Maytham Arif Oun424 followers
location of Maytham Arif OunAl-Basra Governorate, Iraq

Connect with Maytham Arif Oun to Send Message

Connect

Connect with Maytham Arif Oun to Send Message

Connect
  • Timeline

  • About me

    Lead Completion & Handover System Engineer / Mechanical Quality Inspector / BGAS Gr.2 , CSWIP 3.1 , NDT methods : RT II, PT II, MT II .

  • Education

    • Basra University

      1992 - 1997
      Bs of mechanical engineering Mechanical Engineering
  • Experience

    • Al-Tassameh company

      Jan 1999 - Jun 2000
      Piping Engineer

      Position : construction piping engineerclient : Medical clinics complexActivities: supervision construction of piping of chillers units and all related fitting and valves

    • Petrochemical Industrial Company

      Jan 2002 - Sept 2015
      Piping / Mechanical construction Engineer

      • Petrochemical Industrial company Department of Maintenance and constructionPosition : Piping & Mechanical construction Eng.Installation all branches piping for new two unit of steam boilerD-type such as natural Gas pipes , Air plant pipes, High steam pressurepipes, cooling water pipes, N2 pipes and boiler feed water pipes. Execute at site all piping system for Cooling Box (ethane & ethylene gas)two units for Ethylene Factory with different size from all pipes carbonand stainless steel Replacement the tubes (low alloy steel pipe) for the unit No.1 & No.2 &No.4 for the Furnace of ethylene factory each unit contain 4 coils eachcoil contain 9 tubes each tube with 14m length inside the furnace with allreplacement of damage of plates and replacement of all welded valves . Replacement and re-tubing Heat Exchangers with all different pipingsystem in Ethylene Factory . Execute all stainless steel piping system for skids for Reverse Osmosisunit in (SCPI) . Installation a lot of pumps different type with all section & dischargepiping system for Ethylene Factory . Replacement all damage the Chlorine plant cells more than 200 once . Replacement firefighting pipeline for all factories in (SCPI) with long morethan 40km. Replacement the damage raw water source pipeline for (SCPI) size 30"more than 24 km. worked in the field of maintenance and repairing valves and heatexchangersfor factory. Responsible of plan, organize, execution of piping fabrication anderection works. Allocation of material, man power and equipment for daily work activities. Monitor all piping installation and modification activities. Ensure the productivity and high quality of the subordinates and the subcontractorsactivities. Responsible of Pressure Testing activities of piping systems. Responsible of Bolt Torqueing & Tensioning of flanged joints. Provide assistance in Pre-Mechanical Completion activities. prepare and compiled final reports. Show less

    • China Petroleum Engineering & Construction Corporation (CPECC)

      Oct 2015 - Mar 2018
      QC Piping /Mechanical Inspector

      • ( CHINA PETROLEUM ENGINEERING CONSTRUCTION CORPORATION) CPECC,October 2015 - March 2018West Qurna 1 OilfieldClient : Exxon Mobil Position : QC Piping/Mechanical inspector in QA/QC department Project: M 127 – DS8 Storage Crude Oil Tankages – Pumps & Meters Follow all mechanical and piping inspection activities as per project specification and method statement. Following all steps of tanks construction according to API 650 Materials inspection. Piping fabrication and inspection according to ASME B31.3  Inspection of static and dynamic equipment Review the inspection report and all the related inspection procedures Follow inspection activities on the pipe rack structure during fabrication and erection stages. Coordinate with client inspector to complete mechanical completion for all piping system , mechanical equipment etc.  Witness with client inspector hydro test and pneumatic test. Test pack preparation and review all the related documents Inspection of piping materials at stores and final inspection at site ISO/Mechanical clearance of fabricated pipe spools, erected spools and structural. Witness with client inspector for all piping system installation like pipe spool, valves, flanges, bolts, gasket etc. Witness with client inspector for all pumping and equipment system installation like degassing drum, drain sump tank , metering system, pump installation etc. Complete all mechanical completion for equipment with client inspector. Show less

    • GE Power

      Apr 2018 - Jun 2021
      Mechanical Static , Piping and Welding Inspector

      Company : GE Power & WaterProject : Zubair Permanent Power Generation Plant (ZPPGP)Client : Eni S.p.A Interpret and analysis welding drawings and isometric drawings. Follow up welding daily activities. Conducted with DPT team of subcontractor to make sure all the inspection is according specifications for the client. Assessment the welding joint depend on the specified standard after completed the NDT procedure. Coordination with construction personnel inspection activities. Witness of welder qualification & procedure qualification and prepare documents. Verify that the joint geometry meet the requirements of the welding procedure and drawings. Inspection of joint fit-ups. Inspection of welding consumables and storage. Monitoring the weld parameters of different welding process in accordance with WPS & PQR. Familiar with the base materials consumables welding materials conform to the specifications and that welding filler metals used are as specified for materials. Review reports and verify that records of the welding is according to client requirement. Coordination with NDT team of subcontractor at site. Final weld visual inspection as per code. Coordination with client to close all RFI for visual welding. Show less

    • Saipem

      Sept 2021 - Dec 2022
      Mechanical Quality Inspector

      Project : Major Tie ins piping and equipmentLocation : West Qurna 1 OilfieldClient : Exxon MobilPosition : Mechanical QC Inspector Department : QualityActivities : supervision welding and NDT activities of piping and all pumps installation inspection and static equipment installation inspection.Equipment : Wash water tank, closed drain drum vessel, KO drum vessel , wash water pumps, flare stack , degassing drum vessel and firefighting foam vessel.

    • Kent

      Jan 2023 - now
      Lead Completion & Handover Engineer

      Base scope GCMC projects / wellhead / Flow lines/Trunk lines / Manifolds/ oil storage tanks with ROO

  • Licenses & Certifications

    • BGAS-CSWIP PAINTING INSPECTOR GRADE 2

      CSWIP - Certification Scheme for Personnel
      Jun 2022
    • CSWIP 3.1 WELDING INSPECTOR

      CSWIP - Certification Scheme for Personnel
      Feb 2018