Moatasem Abd Elrahman (PMP)

Moatasem Abd Elrahman (PMP)

Electrical Engineer

Followers of Moatasem Abd Elrahman (PMP)2000 followers
location of Moatasem Abd Elrahman (PMP)Cairo, Egypt

Connect with Moatasem Abd Elrahman (PMP) to Send Message

Connect

Connect with Moatasem Abd Elrahman (PMP) to Send Message

Connect
  • Timeline

  • About me

    Concrete pipes Factory General Manager at Osman Group

  • Education

    • Helwan University Cairo

      1993 - 1998
      Bachelor's degree Electrical Engineering Good
  • Experience

    • Coca-Cola Bottling Egypt

      Jul 1998 - Dec 1998
      Electrical Engineer

      •Proper and Preventive Maintenance Works.•Procurement.•Scheduling and planning the Maintenance Work.

    • Osman Group

      Dec 1998 - now

      •Managing the production, Quality control, Maintenance, Safety, Financial , Technical Office and Erecting departments.•Planning the departments meetings, working schedules, production activities, machine maintenance plans, maintaining product quality, budgets. Planning, formulating, organizing, controlling, and redirecting•Implementing the Enterprise Resource Planning (ERP) for the factory works.•Restructured the production, Maintenance and quality control departments beside all the other managerial tasks.•Manufactured Reinforce Cage Welding Machine (Copied from MBK Machine Model MBK 03-40) for the production of cages from I.D 1000 mm up to I.D 4000 mm•Manufactured Prestressing Concrete Coating Machine (Copied from Casagrande Concrete Coating Machine Model MRC 4-18/6)•Manufactured two Concrete batch plant one with 60 m3/h and the other is 120 m3/h Show less •Executing Proper and Preventive Maintenance Works for overhead bridge cranes, Gantry Cranes, Cage Making machines and Pre stressing machines.•Procurement.•Upgraded the control of the batch plant by using PLC, SCADA system and moisture sensor. •Manufactured 2 of a pre stressing Machine (Copy of Casagrande PC 5200). •Upgrade the control of Zublin Reinforcing Cage Welding Machine by using PLC and DC Drives.•Upgraded the control of MBK Reinforcing Cage Welding Machine by using PLC and AC Drives. Show less

      • General Manager of Concrete Pipes factory

        Oct 2012 - now
      • Head of Maintenance Department at Misr Raymond Foundation

        May 2007 - Oct 2012
      • Head of Maintenance Department at Concrete Pipes Factory

        Mar 2005 - May 2007
      • Deputy of Electrical Technical Office Manager at SGSC Construction Co.

        Oct 2001 - Mar 2005
      • Electrical Engineer at Technocrete

        Dec 1998 - Oct 2001
  • Licenses & Certifications

    • Lean Six Sigma Yellow Belt (ICYB)

      ATTIC BUSINESS SOLUTIONS LTD.
      Dec 2019
    • Project Management Professional (PMP)

      Energy Technology Institute
      Nov 2016