Ali Moallem, MSc, P.Eng, CWB Level3

Ali Moallem, MSc, P.Eng, CWB Level3

Materials Engineer (Part time 16 hours a week)

Followers of Ali Moallem, MSc, P.Eng, CWB Level31000 followers
location of Ali Moallem, MSc, P.Eng, CWB Level3Кокуитлам, Британская Колумбия, Канада

Connect with Ali Moallem, MSc, P.Eng, CWB Level3 to Send Message

Connect

Connect with Ali Moallem, MSc, P.Eng, CWB Level3 to Send Message

Connect
  • Timeline

  • About me

    Welding Engineering and Quality Department , Seaspan ULC

  • Education

    • Shiraz University

      1999 - 2003
      Material Engineering (Corrosion and Prevention of Materials)
    • Isfahsn University of Technology

      1995 - 2000
      Bachelor of Science (B.Sc.) Materials Engineering
  • Experience

    • Hampaye Sanat co.

      Sept 2000 - Mar 2003
      Materials Engineer (Part time 16 hours a week)

      Doing mechanical, physical and chemical test on material to check the quality, analyzing the results and report to head of QC/QA department.

    • DMT Factory

      Jan 2003 - Sept 2004
      Site Technical Inspector

      -Corrosion monitoring and prevention in all service line and equipments.-Inspecting of test package according to ISO, P & ID (Dimension, Hydrotest,…) after all overhaul and maintenance operation.-Performing of visual inspection of pipe and supports, fitting, Construction before, during and after welding.-Interpretation of radiographic film of different pipes and welds.-Performing of Welder Qualification Tests according to ASME IX and related procedures.-Conducting PQR & WPS documents Review. Show less

    • Coal Tar Refinary of Esfahan

      Sept 2004 - Aug 2007
      Material Engineer and Corrosion Specialist

      -Performed Corrosion monitoring and prevention in process and utility lines and equipment.-Performed failure analysis for corroded parts and equipment, cracked materials and any leakage due to defects in metallic parts.-Performed test package inspection according to ISO, P & ID (Dimension, Hydrotest,…) after all overhaul and maintenance operation.-Perfored visual inspection of pipe and supports, fitting before, during and after welding.-Audited and interpreted radiographic film of different pipes and welds-Performed Welder Qualification Tests according to ASME IX and WPS.-Conducted PQR & WPS documents review-Performed material selection reviewing in steel structure construction project.-Performed final QC documents and turn overs review for new metallic components before installation during construction to verify complying with codes and specs. Show less

    • Kavian Petrochemical Company

      Aug 2007 - Mar 2010
      Material Engineer, Quality Control and Technical Inspector

      -Reviewed and verified the MTRs used by different manufacturers and suppliers for pressure vessels, storage tanks-Reviewed and replied NCRs and RFIs regarding to material selection for different projects.- Reviewed, Verified and approved the QC final documents and turn overs for pressure vessels, piping and storage tanks supplied by manufacturers and installation companies.- As a member of Kavian Petrochemical company QC team I also participated in and performed during construction inspections and quality auditing of pressure vessels and fixed roof storage tanks, using in polyethylene and polypropylene process line, from start to end included material selection and joint design review, row material inspection, lamination tests of plates, cutting beveling and rolling inspection, fit up inspection, welding inspection, PWHT inspection, NDT inspection, dimensional checks, air test and hydrostatic test, surface preparation and paint inspection in accordance with relevant standards; ASME V,VIII,IX and API 650. Show less

    • Iran Standard and Quality Inspection

      Jun 2009 - May 2014
      Material Engineer, Senior Quality Inspector

      - Approved material selection based on API 650, BS 2790, ASME sec. VIII for storage tanks, fire tube steam boiler, fire tube hot water generator and pressure vessels design- Reviewed and verified the design and calculations and material selection for fire tube boilers base on ISIRI 4231 (BS2790).- Audited the QC docs and final packages for different sizes and capacities of steam and hot water boilers as a ISIRI rep.- Performed quality control tasks like material destructive and non-destructive testing included;1- Writing, reviewing, checking and auditing WPS, PQR and WQT2- Creating and writing the manufacturing and quality control procedures3- Managing the techs and sometimes doing weld inspection RT, PT, MT, UT and VT (Level II ASNT Certified) to audit and verify the process base on client request4- Arranged Quality control activities for pressure vessels and storage tanks performed by QC technicians during construction- Corrosion inspection and performing corrosion failure analysis for different clients like steel manufacturers, food industries, oil and gas industries and power plants.- Performed quality control tasks in Sepahan pipe manufacturing company base on API 5L as a third part inspector. Show less

    • Mobtakeran Amin Development Engineering and Construction Management (MADECOM)

      Mar 2010 - Jun 2014
      Quality Control & Project Engineer (PART TIME)

      -Designing of site upgrading project for CPS company, include P&ID, Instruments, Structural, ISO and Storage Tank calculating and drawings.-Designing and manufacturing of four 30000 lb/hr fire tube steam boiler base on BS2790 for Petrosamin co.-Designing and manufacturing of two cold service pressure vessel for Regal Petrochemical co. base on ASME sec. VIII-Designing of eight various size small storage tank for CTR company, include P&ID, Instruments, Structural, ISO and Storage Tank calculating and drawings-Designing of two small storage tank for Regal Petrochemical company, include Storage Tank calculating and drawings-Designing and manufacturing of one pressure vessel for Mobarakeh Steel Complex base on ASME sec. VIII-QC supervisor in fabricating of two 45000 cubic meter storage tank base on API650-QC supervisor in fabricating and manufacturing of four 30000 lb/hr fire tube steam boiler base on BS2790-During construction inspection of four 4000 cubic meter storage tank base on API650-QC supervisor of two cold service pressure vessel for Regal Petrochemical co. base on ASME sec. VIII Show less

    • German Lloyd (GL)

      Feb 2011 - Mar 2014
      Welding and NDT Inspector (Part Time Job)

      -Inspecting of test package according to ISO, P & ID (Dimension, Hydrotest,…).-Inspection of Pressure Vessel construction according to ASME VIII Div1, Welding maps and related procedures.-Performing of visual inspection of pipe and supports, fitting, Construction before, during and after welding.-Performed & Supervision of Non-Destructive Tests MT, PT, VT , UT, RTi-Interpretation of radiographic film of different pipes and vessels-Performing of Welder Qualification Tests according to ASME IX and related procedures.-Conducting PQR & WPS documents Review. Show less

    • FEED ENGINEERING INC.

      Jul 2014 - Nov 2020
      Project Engineer and QA/QC Specialist (Part Time from July 2017)

      -Liaison between engineering disciplines and verification of the engineering documents and drawing prepared conforming to client specs.-Material selection for tanks, pressure vessels, steel structures and piping base on client specs and relevant standards for designing of water treatment skids for JACOS project, Bilbo Gas Plant, Harvest Energy, IRAP (Industrial Research Assistance Program) project includes designing the new heat recovery unit (HRU) and other project performing in FEED.- Preparing quality control procedures for projects performing in FEED includes QC Manual, ITPs, Hydrotest and Pneumatic test, NDE procedures, PWHT procedures and other relevant documents .-Tank design including calculations for bottom, shell, roof plates thickness, joint design, NDT map creation, base on API 650.-P&ID & ISO review for water treatment skids JACOS and fuel transfer and lube oil dispensing Skids for AGL.- Reviewed material selection for tanks, pressure vessels, steel structures and piping base on client specs and relevant standards for Bilbo gas Plant.-Preparing and issuing MRF and responding to client clarifications-Quality control auditing, review and verifying of the QC documents of a gas plant for Tonmoor international Inc Show less

    • Weir Minerals

      Jul 2017 - Mar 2019
      QC Inspector

      - Performing quality control inspections and tests (visual, dimensional, hardness, magnetic particle and Hydrotest) at fabrication shop on all carbon steel large diameter pipes and fittings and structures.- Performing quality control inspections and tests (pre cure and post cure visual, dimensional, hardness, thickness measuring and also doing other rubber tests) at rubber lining shop on all carbon steel large diameter pipes and fittings and structures.- Issuing NCR and CAPA in complain Pro software.- Providing QC reports, QA package and turnovers and sending to clients.- Filling all the QC forms, ITP, NCRs and other relevant forms.- Performing receiving inspection for all receiving metallic parts include document and MTR review, visual and dimensional check.- Performing Visual Inspection and Magnetic Particle Inspection and Ultrasound Thickness Measuring. Show less

    • Mitchell Installations Ltd

      Mar 2019 - Sept 2019
      QC Lead @ Parkland Refiery Project

      - Responsible for all aspects of QC process in all of the Mitchell projects in Parkland Refinery in both area 1 and 2 includes proving QC procedure, managing all quality control inspection process and tests and performing tests at Parkland refinery.- Issuing NCR and CAPA in complain Pro software.- Providing QC reports, QA package and turnovers and sending to Parkland refinery.- Filling all the QC forms, ITP, NCRs, RFIs and other relevant forms.- Performing Visual Inspection in site and Magnetic Particle Inspection in shop. Show less

    • Seaspan ULC

      Nov 2020 - now
      Supervisor, Weld Quality

      The primary responsibility of the Supervisor, Welding Quality Control (QC) is to effectively manage Seaspan Vancouver Shipyards interests related to specifications, welding codes, standards or section compliance and the required process controls. The incumbent will interface with naval and commercial stakeholders as required for effective oversight of the in-process controls driven from these requirements.The Supervisor, Welding QC is responsible for the direct supervision of VSY’s Welding QC & NDE Coordinators. The role will monitor the execution and oversight of Company Welding Standard Operating Procedures (SOP’s), Quality Management System compliance, sign offs at specified quality control process examinations, traveler and ITP hold points.This role works with programs and departments to ensure that all standard operating procedures reflect the methods and techniques currently in use and that the resulting workmanship from these procedures meets customer and Seaspan’s quality expectations. Complexity of the role comes from meeting regulatory requirements and also meeting customer’s needs in a timely and prudent manner while maintaining all quality objective evidence required for quality control and future audits. Errors may go undetected for a period time until outside inspections and/or audits, and could have serious impacts of production, meeting targets, budgets and could impact relationships with the customer and various stakeholders. Show less

  • Licenses & Certifications

    • P.Eng

      EGBC
    • Standard Expert License (in Welding and Pressure Vessel Inspection)

      National Iranian Standard Organization (NISO)
      Apr 2012
    • Certified Magnetic Particle Test and Liquid Penetrant Test Technician (Level II)

      Canadian General Standards Board
      Jan 2018
    • Internal Auditing Training Based on ISO 9001:2000

      DET NORSKE VERITAS (DNV)
      Jul 2007
    • Certified Welding Inspector (Level II)

      Canadian Welding Bureau
      Jan 2018
  • Honors & Awards

    • Awarded to Ali Moallem, MSc, P.Eng, CWB Level3
      Congress Award Director of Iranian Corrosion Association and Secretery of the 9th Congress of Corrosion май 2005 г. Congress Award for Present 2 Scientific Papers in Congress.
    • Awarded to Ali Moallem, MSc, P.Eng, CWB Level3
      Rank Certificate Director of Department of Material Engineering, Proffessor K. Janghorban сент. 2004 г. Achieving the 2nd Rank among the all graduates of master's program admitted in 2000-2001.