SRIRAM VADAVATATH

Sriram vadavatath

bookmark on deepenrich
location of SRIRAM VADAVATATHمنطقة الدوحة الحضرية
Phone number of SRIRAM VADAVATATH+91 xxxx xxxxx
Followers of SRIRAM VADAVATATH461 followers
  • Timeline

    Oct 2006 - Feb 2009

    Control Room Engineer (Electrical

    Kerala State Electricity Board
    Feb 2009 - Jan 2011

    Junior Engineer Projects

    Pratibha Industries Ltd.
    Jun 2011 - Oct 2011

    Electrical Engineer

    Zahwa Electrical Contracting
    Nov 2011 - Nov 2013

    QA/QC Engineer Electrical & Instrumentation

    VINCI
    Dec 2013 - Jan 2015

    Senior Electrical Engineer

    SLEEK
    Feb 2015 - Nov 2016

    QC Engineer Electrical & Instrumentation

    AL Turki Enterprises L.L.C
    Dec 2016 - Sept 2019

    Assistant Manager QA/QC Electrical

    Larsen & Toubro
    Dec 2019 - Oct 2020

    Electrical Engineer

    ELTECH BUILDERS
    Jan 2021 - May 2024

    QA/QC Engineer E &I

    Doha Petroleum Construction Co. W.L.L
    Current Company
    May 2024 - now

    Senior QA/QC Engineer

    China Petroleum Engineering & Construction Corporation (CPECC)
  • About me

    Senior QA/QC Engineer - Electrical & Instrumentation with more than 16 years of experience in Quality Management of various oil & gas projects

  • Education

    • Anna university chennai

      2003 - 2006
      Bachelor of engineering (beng) electrical and electronics engineering first class
  • Experience

    • Kerala state electricity board

      Oct 2006 - Feb 2009
      Control room engineer (electrical

      Managed operations and general maintenance of 2 X 160MVA, 220/110KV transformer banks, 3 X 20MVA, 110/22KV Transformers, two 220KV incoming feeders, nine 110KV& eleven 22KV outgoing feeders.Engaged in the maintenance of over 220KV, 110KV, 22KV bus coupler arrangement.Conducted periodical maintenance of three 40A10V DC Battery Charger & corresponding batteries.

    • Pratibha industries ltd.

      Feb 2009 - Jan 2011
      Junior engineer projects

      Managed the erection of 33/6.6 KV Substation comprising of main & auxiliary transformer of adequate capacity with 100 % standby transformer.Engaged in the installation & testing of 33 KV CT for metering & Protection.Managed installation & commissioning of bus bar arrangements, control room, DG systems & circuit breakers. Created BOQ, Monthly Invoice & Engineering Drawings.

    • Zahwa electrical contracting

      Jun 2011 - Oct 2011
      Electrical engineer

      Reviewed & ensured execution of project related electrical activities.Engaged in the testing of Power System & Lighting System for residential, commercial & industrial complexes.Organized inspection of Fire Alarm System, CCTV Systems, Public Address Systems & Security System.Conducted estimation for upcoming projects & created of project related drawings.

    • Vinci

      Nov 2011 - Nov 2013
      Qa/qc engineer electrical & instrumentation

      • Created & updated all the documents of inspection and test plan in accordance with the Quality Control Procedures• Spearheaded testing & inspection of:o Project related activities like installation & testing of overhead power transmission system, lighting system, HV & LV cables, power & lighting distribution board, HV & LV panels, Generator, HV & LV Motors, transformers, RMU, VFC, control panel, standalone solar power system, CT & PT, electrical cable tie in jobs and erection of electrical substations, control rooms and LER (Local Equipment Room).• Led inspection prior and after installation of orifice plate assemblies, pressure & temperature transmitters, RTD, pressure & temperature gauges, DCS Panel, gas& H2S detectors, guide wave radar, HMI, remote monitor system, fire & gas system, turbine flow meter, pneumatic flow transmitter, indicator level switches & level transmitter & differential pressure transmitters.• Conducted:o Loop checking & continuity checking and calibrating of various Instruments like flow Transmitters, pressure transmitters, pressure switch, temperature transmitters and other Process instruments like SMART & HART family protocol using field communicator.o Testing of fire & gas system, Fire alarm system & FO cables.• Engaged in simulation of control signals at site for troubleshooting & pre commissioning activities. عرض أقل

    • Sleek

      Dec 2013 - Jan 2015
      Senior electrical engineer

      Engaged in the calculation of load, probable energy consumption & finance data of electrical utilities in LT & HT premises, simple payback for electrical cost implication for the usage of energy efficient products.Coordinated with the concerned personnel for selecting cables, switches, control accessories including distribution networks & energy efficient accessories.Reviewed construction activities across various work sites.

    • Al turki enterprises l.l.c

      Feb 2015 - Nov 2016
      Qc engineer electrical & instrumentation

      Spearheaded quality control inspection for electrical & instrumentation activities of oil & gas well as per the relevant Shell & International Standards which consists of including Beam Pumps, Progressive Cavity Pumps, Electrical Submersible Pumps, Multi Selector Valves, Multi Flow Meters, Water Injection Wells, Main Solenoid Valve, High Pressure Gas Well and Water Supply Wells. Performing Receiving inspection for incoming materials & equipment.Ensuring installation, testing & commissioning of HV & LV cables, control panels, HV transformers and overhead power transmission system in accordance with the set parameters. Reviewing & ensuring the assigned work is conducted as per recommended standards during installation, testing, glanding & termination of instrument cable, Pressure Transmitters, electromagnetic flow meter, red eye meter, Coriolis meter, rod pump controller, remote terminal unit, pressure switch, , instrument junction boxEngaged in the calibration of pressure transmitter, pressure gauge & pressure switches.Conducting:o SAT (Site Acceptance Test).o Loop checking of pressure transmitter & pressure switches.o Patrolling inspection at site & storage area on regular basis.• Developing weekly inspection reports.• Performed inspection of High Sour Well by including ATEX requirements in works carried out in Hazardous Area . عرض أقل

    • Larsen & toubro

      Dec 2016 - Sept 2019
      Assistant manager qa/qc electrical

      • Report the performance status of Project Quality activities and relevant issues to the Corporate QHSE Team Leader and Project Manager. • Ensure that Quality Management is applied in line with the Project Design Criteria to the Engineering, Procurement, Construction and Pre Commissioning/Commissioning phases of the Project. • Develops KPIs and ensures consistency in reporting across Corporate QHSE Management System. • Ensuring adequate PQI is achieved monthly basis throughout the project duration.• To establish Company Quality Plan including Quality Policy (based on Corp.QHSE Policy) and continually improve it. • Preparation of monthly quality reports (MQR)• Conducting Site MRMs and Audits.• Follow‐up of non‐conformity & punch list.• Maintaining a log on site observation, corrective action & near miss incidents on weekly basis.• Coordinate and communicate with Client on Project Quality issues. • Develop the Project Quality Training Plan. Ensure implementation of the plan. Ensure that training records are maintained. • Preparations of QAP, ITP, two week inspection look ahead schedule and ensure their implementation.• Preparation and submittal of 5-days procurement inspection notice and weekly inspection Fabrication Status.• Prepare complete list of inspect able and non-inspect able materials for the project with correct approved vendor Manufacture, level of inspection basing client specifications, prior to preparation of Purchase Requisition Submittals (PRS) and Approved vendor manufacturer and compliance with the acceptable standards.• Establishing Agenda for Pre-inspection Meeting for various inspection levels for material based on criticality rating. عرض أقل

    • Eltech builders

      Dec 2019 - Oct 2020
      Electrical engineer
    • Doha petroleum construction co. w.l.l

      Jan 2021 - May 2024
      Qa/qc engineer e &i

      Promote established policy and objectives throughout the department to increase awareness, motivation, and involvement.Ensure focus on customer requirements throughout the department.Ensure that appropriate processes are implemented to enable requirements of customers and other interested parties to be fulfilled and objectives to be achieved.Ensure that an effective and efficient Quality/HSE management system is established, implemented, and maintained in the department to achieve these objectives.Plan and carry internal audit in accordance with the documented procedure and report the performance of the implemented quality systems in the management review meetings. Guide and direct the QA/QC Department personnel to maintain the standards expected by the company and to continually seek to improve systems and procedures.Ensure that all the QA/QC Department activities comply with the requirements of the company Quality Procedures and customer specified requirements.Ensure that inspection and testing comply with the specified requirements.Liaise on quality matters with customers, suppliers, and certification authority representatives.Maintain Quality Records in accordance with procedures and specified requirements.Assist the QA/QC Manager in his activities and daily running of the department operations.Deputy for the QA/QC Manager in his absence.Assist in preparation of PQP, Quality System procedures, QCP & ITP in accordance with the applicable quality system standards and or Contractual specification requirements.Coordinate on quality matters with project team, customers, suppliers, and certification authority representatives.Verify raw material certification, product certifications, manufacturing data book and other quality records to ensure that the documentation meets the specified requirements.Promote team working and liaise with other departments to maintain the same. عرض أقل

    • China petroleum engineering & construction corporation (cpecc)

      May 2024 - now
      Senior qa/qc engineer
  • Licenses & Certifications

    • Iecex certificate personnel competence

      Iec certification system for explosive atmospheres
      Jul 2021
    • Lean six sigma green belt (icgb)

      Mindtree
      Apr 2016
    • Certificate of competence (ism. atex level 2-authorised personal)

      Ineris - institut national de l'environnement industriel et des risques
      Feb 2024
    • Ims internal auditor

      Tüv nord group
    • Iso 9001 lead auditor - quality certification

      Irca global
      Apr 2016
    • Specialization in electrical design

      Keltron
      Sept 2014
    • Certified international procurement professional

      Ipscmi
      Mar 2023