Babar Ali

Babar Ali

Project Engineer

Followers of Babar Ali740 followers
location of Babar AliPakistan

Connect with Babar Ali to Send Message

Connect

Connect with Babar Ali to Send Message

Connect
  • Timeline

  • About me

    Manager Maintenance at Searle Company Limited

  • Education

    • Happy Home School

      -
      SSC Computer Science
    • Institute of Business Management

      2014 - 2017
      Master of Business Administration (MBA) Environment and Energy Management
    • Govt National College

      2002 - 2004
      Hsc Pre-Engineering
    • Sir Syed University of Engineering and Technology

      2005 - 2009
      Bachelor of Science (B.S.) Electronics Engineering
  • Experience

    • SIEMENS Pakistan. Engg. Co. Ltd

      Dec 2009 - Dec 2011
      Project Engineer

      Worked as a PROJECT ENGINEER at Different Airbases of Pakistan Responsible for the laying of pipes and up riser work according to drawing. Study drawings and implement the work at field. Attend meeting with clients. Provide technical facility and solutions to clients. Installation and termination of HT, LT panels. Installation and termination of 500kVA transformer. Installation and termination of 250kVA Generator. Installation and termination of runway, taxiway and approach lights. Installation of MCR panel for controlling of lights. Testing of primary cable through 2.5KV megger Determine the cable routes to the contractor for the laying of cables. Complete installation of Air field lighting and establish MCR room for monitoring and control with ALCS Testing of Primary cable through 2.5 KV megger. Installation and termination of Lights in an Airfield area. Reils/Flashers installation for the first time in Pakistan to enhance safe air operations. Troubleshooting of Reils and flashers panel and resolve the issues in house. Show less

    • Getz Pharma (Pvt) Ltd.

      May 2012 - Mar 2025
      Sr. Instrumentation and Control Engineer

      EXPERIENCE:• Responsible of troubleshooting and repairing of Electrical/Electronic equipment including power supplies drives and test equipment.• Troubleshoot the faults on Blisters like IMA, UHLMANN NOACK machines.• Troubleshoot the faults on car toners, filling and labeler machine as well.• Upgrade the software’s on machines.• Create Backup for HMI and PLC.• Upload and download of PLC Programs of machines.• Installed different instruments on machines, set their parameters according to user requirement.• Calibrate and maintain components and instruments according to manufacturer’s specification.• Read and interpret plans, schematics, process control flow diagram, network drawing and wiring diagram.• Perform Calibration activity of Weighing Balances of whole plant, labs along with Vendor.• Implement the Calibration activity according to SOPS.• In-house repairing of weighing Scales.• Perform maintenance task involving analog and digital equipment.• Perform Preventive and Corrective maintenance activity of all instruments and equipment.• Concern Manufacturer’s manual to determine task and maintenance activity.• Maintain log book and manage plant operations during shift.• Maintain the daily Downtime Report.• Maintain the Monthly Report of Instrumentation Department.• Redefine operation through process mapping on SAP.• Perform different work on SAP like issuance and return slips of material, closing of notifications, create PR on SAP as well.• Documents Controlling.• Planning and ordering of spare parts of equipment when required.• Deals along with different vendor regarding instruments.• Involve in many different projects like installation of new machinery complete layout, commissioning of machines, performing SAT as well. Show less

    • Scilife Pharma (Pvt.) Limited

      May 2019 - Mar 2025
      • Deputy Manager Instrumentation

        Jan 2024 - Mar 2025
      • Assistant Manager Instrumentation

        May 2019 - Mar 2025
    • The SEARLE Company Ltd.

      Mar 2025 - now
      Manager Maintenance
  • Licenses & Certifications

    • CCNA, Advance PLC Programming, Microcontroller