Arsalan --

Arsalan --

Engineering Intern

Followers of Arsalan --6000 followers
location of Arsalan --Karāchi, Sindh, Pakistan

Connect with Arsalan -- to Send Message

Connect

Connect with Arsalan -- to Send Message

Connect
  • Timeline

  • About me

    Industrial Engineer | AGI Denim | xGul Ahmed Textile | Operational Excellence | SCM | Amal Alumni | Seeking opportunities to grow

  • Education

    • NED University of Engineering and Technology

      2025 - 2026
      Master's degree Engineering/Industrial Management
    • Dawood University of Engineering and Technology

      2017 - 2020
      Bachelor's degree Engineering/Industrial Management 3.55 CGPA

      Activities and Societies: IISE INDUSTRIAL ENGINEERING SOCIETY Membership Assistant Presentation Head - Handled presentation section in events; coordinated team activities in other sections of society. Relevant Coursework: Industrial Engineering, Production Planning, and Control, Marketing Management, CAM/CAD, Work-Study, Operation Management, Industrial Engineering, Total Quality Management (TQM).

  • Experience

    • Artistic Milliners

      Dec 2018 - Jan 2019
      Engineering Intern

      - Observed flow process dept. by dept. visited and gain basic knowledge about yarn.- Analyzed the weaving process and garment section especially- Conducted time study in the Finishing department and suggestion provided them regarding line balancing- Utilized team skills to work as unity and in a short time did a time study

    • Peoples Steel Mills Ltd

      May 2019 - May 2019
      Engineering Intern

      - Learned the manufacturing flow from input to finished product - Conduct time study in M-shop and suggested valuable suggestions- Experienced practically how steel is manufactured

    • J. Junaid Jamshed Private Limited

      Dec 2019 - Oct 2020
      Project Management Intern (FYP)

      Project Title: Suggesting an Optimized Plan On Work-In-Process Inventory & Manpower To Garment Industry Using Lean Initiatives (A Case Study).Problem Statement: It was observed that there were a lot of Work-In-Process (WIP) Inventory among workstations and on floors which was a major reason to decrease output. No standard working procedure and proper distribution of work affect the planned schedule of production.Research Objective: To optimize the production process of the men Kurta section, considering the current standard time, work-in-process (WIP), and manpower.Result:- Optimized Manpower in all departments of men’s section such as Cutting 32.7%, Sewing 28.3%, Finishing 21.3%.- Reduced WIP level such as Cutting 40.9%, Sewing 40%, and Finishing 50.9%.- Uncovered and address issues causing reason for increased manpower and WIP holding. - Recommended an Optimized Manpower and WIP Inventory Plan - Identified the current status and proposed optimum level of WIP inventory in the men’s section. - identified the standard time for performing any task through which we identify per head, daily, monthly production. Show less

    • ALIF Foundation

      Jul 2020 - Sept 2021

      Worked as volunteer to help the people in different ways providing food to people, fulfilling financial needs of needy people.

      • Director Of Research Development

        Jan 2021 - Sept 2021
      • Team Member

        Jul 2020 - Jan 2021
    • Amal Academy

      Jul 2020 - Nov 2020

      - Communication: Completed a competitive written application then pass from longs process such as application, interview, activity center, orientation, and finally selected from over 6100+ applicants for an intensive 3-month Fellowship founded by Stanford University.- Skill Development: Investing 150 hours in order to learn numerous soft skills such as teamwork, problem-solving, effective communication skills, networking that help to make professional & personal life successful.- Installed water filtration plant and given awareness to the people about the significance of pure water this was the part of mega project named "Clean Water For Living" Show less

      • Amal Ambassadorship Program

        Oct 2020 - Nov 2020
      • Career Prep Fellow

        Jul 2020 - Oct 2020
    • Gul Ahmed Textile Mills Limited

      Jan 2021 - Jan 2023
      Industrial Engineering Officer

      - Waste reductions and process optimization so that maximum value can be achieved from process-KPI Monitoring and Controlling - Prepare feeding checklist, feeding plan & follow up i.e. Machine requirement, Arrangement of folders, Manpower allocation, patterns, Trims and Cutting status • Follow-up all the required machines, man & resources are available before feeding the line• Hourly production monitoring of critical operation • Maintaining Manpower as per the requirement • Day to day line balancing & bottleneck solving • Get the cycle time & compare the bar-chart for improvement areas • Helper rationalization from the layout to increase the efficiency • Calculation of lost time & highlighting the reasons while performing RCA using 5 Why’s • Do the production studies of effective areas that are not hitting the required targetInitiated Skill allowance for skilled workers on the basis of skill matrix • Prepare and execute cross training plan of operator to fulfill any skill gap and take the follow up for improvement • Update weekly incentive reports based on daily production target and efficiency• Monitored forecast & production on daily basis in finishing department.• Changed Layout as per style required.• Optimized the work flow by eliminating wastages from floor and reduce WIP• Maximized Production of floor by coordinating with floor team through efficient planning. Show less

    • Artistic Garment Industries (AGI Denim)

      Jan 2023 - now
      Senior Executive Process Excellence
  • Licenses & Certifications