PUNEET SINGH

PUNEET SINGH

Summer Intern

Followers of PUNEET SINGH3000 followers
location of PUNEET SINGHKolkata, West Bengal, India

Connect with PUNEET SINGH to Send Message

Connect

Connect with PUNEET SINGH to Send Message

Connect
  • Timeline

  • About me

    Operations Manager | Rail Logistics, Mechanical Engineer, Production, Quality, Maintenance, Fleet Management | GGSIPU | IIT Delhi | Warranty and Maintenance

  • Education

    • SANATAN DHARAM PUBLIC SCHOOL, NEW DELHI

      2010 - 2011
      HIGHER SECONDARY LEVEL NON MEDICAL BRANCH 90.8%

      Activities and Societies: Sports Team, Head Boy of School, Head of the Prefectorial Board.

    • Indian Institute of Technology, Delhi

      2022 - 2023
      Continuing Education Programme Operation Management and Analytics Successful Completion
    • Guru Gobind Singh Indraprastha University

      2011 - 2015
      Engineer’s Degree Mechanical Engineering/Mechanical Technology/Technician 84.25%

      Activities and Societies: Participated in the SAE Supra and SAE Efficycle which was organized by the Society Of Automotive Engineers was also head of the College Sports Team.

  • Experience

    • BHUSHAN STEEL LIMITED, SAHIBABAD

      Jun 2012 - Jul 2012
      Summer Intern

      BHUSHAN STEEL LTD. , SAHIBABADHave done training after completing the 1st year of B.tech . Bhushan steel is a very renowned company for the coating of the steel sheets i.e. galvanisation process and also the galume process. Its a 8 sq. km plant where the proper processing of the sheets i.e. cleaning , coating and also painting. I had 6 weeks training in the plant and got to know about each and every line where the work take place. It was mainly materials engineering and various processes like annealing , quenching and the temperature control . Show less

    • 36, TOYOTA, FARIDABAD

      Jun 2014 - Aug 2014
      Summer Intern

      36 TOYOTA , FARIDABADIt is a service center for the toyota vehicles . It is situated in Faridabad . This service station has the unique system of managing the vehicle coming in and out of the service center automatically and is the first company to use this method. Learnt a lot from there and got to know more about the different parts and problems faced in the vehicle . Got to know also about the various methods of solving problems and various techniques for wheel balancing and alignment . The internship there had helped me gaining deep knowledge about the vehicles and also the parts . Show less

    • UNIX CELLULOSE PRIVATE LIMITED

      Aug 2015 - Aug 2016
      Graduate Engineering Trainee

      • Minimised the expenses by 14% by checking the work sites and discussing with senior staff and managers.• Gathered as much information on the company and participated in on-the-job training wherever possible.• Participated in meetings, workshops, and team-building events.• Analysed existing systems and offered new ideas for improvement.• Conducted research and assisted the Manager and Supervisor wherever possible.• Completed fieldwork and visited different work sites when required.• Inspected inventory and reported inconsistencies whenever found. • Studied CAD drawings and specifications.• Checked the expenses and allocated budget with senior.• Provided assistance to different staff and Senior engineers. Show less

    • Texmaco Rail & Engineering Ltd

      Aug 2016 - Aug 2018
      Assistant Engineer

      • Completed production of 176 no. wagons in a year by carrying out the KAIZEN to minimize effort and increase productivity.• Increased verified production entry on Oracle R12 by 7%. • Supervised the manufacturing processes, and ensured quality work was done in a safe, efficient manner.• Line capability built-up from Prototype manufacturing to Series production.• Set Process Flow Diagram and analyzed Root Cause Analysis during production.• Diagnosed problems in the production line and provide recommendations and training.• Collaborated with other engineers and workers to design, develop, test, and improve products and engineering processes.• Validated Bill of materials. • Inspected inventory and reported inconsistencies as well as ordered materials.• Evaluated all products and processes and ensured standardization of quality assurance measures.• Performed regular inspections of equipment and scheduling maintenance or repairs.• Established safety procedures and protocols that consider the worker’s well-being, and that minimize the carbon footprint.• Drawn up production schedules and ensured all expenses stayed within the allocated budget. Show less

    • Chetas MWH Metering SCADA LLP

      Dec 2018 - Jun 2019
      Project Engineer

      • Completed installation of 45.4% and commissioning of 11% Electromagnetic Flowmeters on 50 mm to 700 mm diameter pipelines of Delhi Jal Board in East Delhi within 4 months.• Completed hold project in 3 weeks of installing and commissioning 86 No. Electromagnetic Flowmeters on the lines coming out from UGRs by liaising with responsible government officials of different departments.

    • Touax Texmaco Railcar Leasing Private Limited

      Jul 2019 - Dec 2022

      • On-site inspection of 100% wagons with customer engagement and raised warranty claim on Manufacturer/Supplier within two years as per Purchase Agreement. • Executed Warranty claim of 3 customers from April’19 to October’19 (Covid-19) raised by the customer as per Lease Agreement.• Decrease the cost on Third Party Inspection for the last two years by introducing new vendors and negotiating with them.• Suggested Technical Fleet improvement plans for wagons under repair to increase lifespan, and it was approved by the sanctioning authority.• Increased company assets by 11.8% in 2022-2023.• Increased production rate by 72% in the financial year 2020-2021 by planning three different projects simultaneously.• Completed retro-fitment of 26% wagons into Twin-Pipe brake system. Show less 1. Prepare, schedule, coordinate, and monitor Production and Final Inspection of New Wagons.2. Monitor compliance to applicable codes, practices, QA/QC Policies, Performance Standards, and specifications.3. Interact with clients to interpret their needs and requirements and represent them in the field.4. Perform Overall quality control of work (Budget, Schedule, Plans, and Personnel’s Performance) and report regularly to MANAGING DIRECTOR and DIRECTOR on Project Status.5. Assign responsibilities and mentor project team.6. Co-operate and communicate effectively with project participants to provide assistance and technical support.7. Review engineering deliverables and initiate appropriate corrective actions.8. Decide the Warranty Claims along with management if the warranty claim is justified or not and will participate in the discussion with the wagon manufacturer.9. Inspection, Repair, and refurbishment of wagons in traffic.10. Participate in technical meetings and working groups with RDSO and professional associations.11. Proposes developments of the wagon design or modifications.12. MIS Reports, collection, and maintaining all the required documents and certificates related to the new wagons and the wagons running in traffic. Show less

      • Fleet Engineer

        Apr 2021 - Dec 2022
      • Project Engineer

        Jul 2019 - Mar 2021
    • SRB International Pvt. Ltd.

      Jan 2023 - Apr 2023
      Manager
    • TM International Logistics Ltd

      May 2023 - now
      Assistant Manager - Railways
  • Licenses & Certifications

    • ASME SECTION IX

      Future NDT - Quality & Industrial Sector Training Institute
      Nov 2018
    • BASIC WELDING TECHNOLOGY

      Future NDT - Quality & Industrial Sector Training Institute
      Nov 2018
    • WELDING DEFECTOLOGY

      Future NDT - Quality & Industrial Sector Training Institute
      Nov 2018
    • ASNT-NDT-LPT-LEVEL 2

      Future NDT - Quality & Industrial Sector Training Institute
      Oct 2018
    • ASNT-NDT-MPT-LEVEL 2

      Future NDT - Quality & Industrial Sector Training Institute
      Oct 2018
    • ASNT-NDT-RT-LEVEL 2

      Future NDT - Quality & Industrial Sector Training Institute
      Oct 2018
    • ASNT-NDT-RTFI-LEVEL 2

      Future NDT - Quality & Industrial Sector Training Institute
      Oct 2018
    • ASNT-NDT-UT-LEVEL 2

      Future NDT - Quality & Industrial Sector Training Institute
      Oct 2018
    • ASNT-NDT-VT-LEVEL 2

      Future NDT - Quality & Industrial Sector Training Institute
      Oct 2018
    • Primavera P6 Enterprise Project Portfolio Management Essentials

      Croma Campus Pvt. Ltd.
      Jun 2021