Ram Prakash

Ram Prakash

CHSWA

Followers of Ram Prakash162 followers
location of Ram PrakashDelhi, India

Connect with Ram Prakash to Send Message

Connect

Connect with Ram Prakash to Send Message

Connect
  • Timeline

  • About me

    Senior Manager ( Mechanical) at Reliance Astaldi JV

  • Education

    • SARDAR PATEL COLLEGE OF ENGINEERING

      -
      Bachelor of Engineering - BE Mechanical Engineering
    • IGNOU

      2000 - 2010
      PGDIM Business Administration and Management, General
    • GIC Lansdowne

      1990 - 1992
      Bachelor of Arts - BA
    • Indian Navy

      1984 - 1988
      Diploma in mechanical Engineering Mechanical Engineering First
  • Experience

    • CHSWA in Indian Navy

      Jan 1988 - Mar 2000
      CHSWA

      • Planning /supervision / monitoring/ verify/ inspection of Hull survey, construction/ repair and maintenance of hull, decks and all piping, fire fighting & damage control system, pumps, compressors & deck machineries ships/ floating dock Docking and undocking of marine vessels.

    • Zamil Operation & Maintenance Company Ltd.

      Mar 2002 - Dec 2006
      Mechanical QA/QC Inspector, welding inspector

      • Fabrication, erection, Hydrotest and coating of piping, pressure vessels, platforms, GOSP etc. Coordinate in quality control and inspection activities.• To conduct the project welding procedures qualifications, performance qualifications.• Material inspection for incoming materials and review of material certificates to check compliance to project specifications.• welding, Weld Visual, PEHT , NDT & Consumable Control• Correct welding parameters used. • Perform visual examination upon completion of welding.• Witnessing the Flushing on Hydraulic lines & review the flushing reports.• Follow up approved Quality Plan / Inspection Test Plan (ITP).• Coordinate with client and external agencies. Show less

    • Galfar contracting & Engineering LLC, Sultanate of Oman

      Mar 2007 - Jun 2007
      QC Engineer

      • Verify /monitoring /inspect /witnessing of WPS, PQR, WPQT, welding equipments/ tools , piping / structural materials & consumables as per drawings, codes and specifications. • Planning for inspection and hold point. Interpret drawings, codes & specifications.• Co-ordination with client & consultant for quality control issue. • Verify fabrication, installation, repair and welding of CS / LTCS / Stainless steel / Duplex Stainless steel piping ,drain lines & miscellaneous piping , platform structure, is as per ASME code for process piping B31.3 / AWS D1.1 & PDO Specifications and drawings.• Monitoring duplex stainless steel fabrication, witnessing PQR & welder qualification.• Monitoring of Material conformity, NDT, NCR, Visual check, dimension check as per PDO specifications. • Verify all flanges are properly torque, pumps are correctly installed. • Monitor & co-ordinate for preparation of hydrostatic test packages & witness of hydro test/ pressure test and leak test of valves/ pipelines. Show less

    • Bureau veritas

      Sept 2007 - Oct 2009
      Sr Surveyor

      Fabrication, welding , erection and coating for all mechanical works , includes, pressure vessels, piping , pipe lines, sewage treatment plant, HVAC, welded and PEB steel structure etc

    • Larsen & Toubro limited

      Oct 2009 - Mar 2011
      QA/QC Manager MEP Mechanical

      Setting up the quality management system and monitoring its implementation during all phases of the project execution. Inernal audit of various departments as per ISO 9001: 2008 & project quality plan. Co-ordinate for external third party audit. Preparation / review of ITP / WI /CL. Inspection of material , installations per plan. Evaluation of products complaints, installation & inspection, NC. Develop policy and systems and advice on all aspects of quality assurance and control to Project Manager & instruct QA/QC personnel. Prepare/Verify /monitor /inspect WPS, PQR, WPQT as per ASME sec IX & AWS D1.1 material receipt / chemical cleaning of SS pipes, piping fabrication & installation, pneumatic / hydro-testing / helium testing of pipelines & piping system. Inspection of steel structure & pressure vessel fabrication, surface preparation, painting & installation work as per BARC specification. Show less

    • Bureau Veritas india pvt ltd

      Apr 2011 - Dec 2012
      Sr surveyor

      Stage inspection of Fabrication, installation & testing of Storage Tank, pressure vessels, piping skids as per API 653/ ASME sec VII Div 1 / ASME B31.3 for different clients.Stage inspection includes, raw material inspection ,mechanical & chemical test of material & sample coupon in laboratories , on line inspection pipe manufacturing , casting & forging visual , NDT & dimension inspection, material and weld NDT & DT inspection, prepare / witness WPS, PQR & WPQT, PWHT, PMI, FBE /HBP / external epoxy coating inspection, load testing of cranes, slings & lifting appliances. Audit of vendors, Vendor assessment, Expediting & Pre-dispatch inspections.Training to subordinates. Show less

    • LARSEN & TOUBRO KUWAIT CONSTRUCTION CO WLL

      Dec 2012 - Jan 2015
      Project Manager

      Post held : Project Manager / QA QC ManagerProject :Fabrication , erection,hydro testing and coating ( internal / external) of piping, installation of rotary and static equipment at Gathering center new GC16 at west Kuwait, having capacity of 100 thousand BPD of crude output. The project has 250 thousand Inch Diameter of pipe welding, 400 tons of pipe supports and 3000 tons of static & rotary equipments.Managing fabrication, welding, erection & hydro testing of piping & associated valves. Erection of rotary & static equipment.Setting up the quality management system and monitoring its implementation during all phases of the project execution.Plan & carryout internal audit of various departments as per ISO 9001: 2008 & project quality plan. Co-ordinate for external third party audit.Preparation / review of inspection and test plans, Method statements and check lists for site activities in coordination with engineers and construction in charges. Ensuring inspection of material received at site, inspections of installations are taking place as per plan or requirement of client Specs. Co-ordination with Client & Consultants for evaluation of products complaints, installation & inspection, non conformance. Monitor, control & supervise in processing of non conformance and tests required in the technical provision of the Contract. Develop policy and systems and advice on all aspects of quality assurance and control to Project Manager & monitor QA/QC personnel.Prepare/Verify /monitor /inspect WPS, PQR, welder performance qualification tests as per ASME sec IX & AWS D1.1 material receipt / chemical cleaning of SS pipes, piping fabrication & installation, pneumatic / hydro-testing / helium testing of pipelines & piping system.• Verify & monitor inspection of piping fabrication, surface preparation, internal FBE coating & external coating & installation work as per AGC & KOC specifications. Show less

    • Larsen & Toubro

      Jan 2015 - Mar 2017
      Manager

      Project: EPC New gathering center GC30, in North Kuwait, having capacity of 100 thousand BPD of crude output. Fabrication, erection , Hydrotest and coating of piping , platform, pipe racks and pressure vessels. Monitoring the QMS implementation during all phases of the project execution.Plan & carryout internal audit. Co-ordinate for external third party audit.Preparation / review of inspection and test plans, Method statements and check lists for site activities as per contract specifications..Coordinating & managing stage Inspections from receiving of materials to dispatch of all pressure vessels (i.e. separators, de-salter, heaters, drain vessels, degassing boots, KO drums etc) at vendor shops in Kuwait. Ensuring inspection of material received , fabrication & installations are taking place as per plan and requirement of client & applicable codes/ specifications. Co-ordination with Client & Consultants for evaluation of products complaints, installation & inspection.Review / approval / monitor / Verify / inspect WPS, PQR, WPQT, material receipt, piping fabrication, welding,pickling & passivization alloy materials, installation, pneumatic / hydro-testing, internal & external coating of piping, storage tanks & pressure vessels.Verify & monitor inspection of piping fabrication, surface preparation, internal FBE coating & as per KOC specifications. Show less

    • Alghanim International General Trading & Contracting Co. WLL

      Mar 2017 - Jun 2018
      Manager
    • BUREAU VERITAS

      Jul 2018 - Oct 2020
      Senior Surveyor
    • Reliance Astaldi JV

      Oct 2020 - now
      Senior Manager ( Mechanical)
  • Licenses & Certifications

    • AWS CWI

      AWS
    • Project Management Professional (PMP)

      PMI
    • API 570 Piping Inspector

      API
      Jun 2016
    • API 510 Vessel Inspector

      API
      Jan 2016
    • ISO 9001 Lead Auditor - Quality Certification

      DNV GL
    • Project Management Professional (PMP)®

      Project Management Institute
      Feb 2017
      View certificate certificate
    • CSWIP 3.2 Sr. Welding Inspector

      TWI
      Aug 2005