Weidong Wang

Weidong Wang

Followers of Weidong Wang1000 followers
location of Weidong WangXiamen, Fujian, China

Connect with Weidong Wang to Send Message

Connect

Connect with Weidong Wang to Send Message

Connect
  • Timeline

  • About me

    EPC site QAQC manager, senior quality advisor in Ferrous-nickel RKEF smelter plant, international project

  • Education

    • 蛟河煤矿一中

      -

      Activities and Societies: 合唱队

    • 蛟河煤矿一中

      1985 - 1988

      Activities and Societies: 合唱队

    • Wuhan University

      1988 - 1992
      Bachelor's degree welding technology and facility passed with bachelor certicate.

      Activities and Societies: 无线电协会, 钓鱼学会,读小说,武汉美食,苏州旅游,武汉锅炉厂生产实习,南京华能电厂工地毕业实习 1 workshop training in Wuhan boiler manufactory(now rename as ALSTOM), 2site training at site contractor JEPCC in Nanjing city power station with boiler/Steam Turbine from Russia 1 profession background is with metallurgical engineering, mechancial engineering, eletrical engineering;2 welding includes welding facility and technology, NDE(RT, UT, MT, PT), heat treatment, mechanical design, etc

  • Experience

    • JEPCC吉林电力建设第3工程公司

      Jul 1992 - Dec 1998

      1 Market Exploration: visit bidding partner such as West House 2 bid: raise quotation strategy in wind power station, invested by Spain, as a first project in Jilin provinceprepare qualification certificate in wind power station,translating commercial and technical contract in wind power station, and fossile power stationtranslating drawing in wind power station3 PM translating FQD/MDR in wind power station 1 QAQC supervisor1) Procedure establishing: special process, inspection and test, after sale service2) Procedure action: auditing contract, perform after sale service3) Internal management auditing4) Auditing ISO9001: to be audited by ISO9001 agency2 welding supervisor 1) monitor site welding in all project2) monitor welder training sub-company3) monitor NDE sub-company 1 welding engineer/supervisor1) welding organization2) welder qualification exam and training;3) WPS4) welding methodology per standard and drawing5) welding QCP in NDE and heat treatment2 expediting and cost1) budget in welding manpower, welding filler, welding facility2) assess work quantity of project welding3 guideline in welding engineer and heat treatment engineer4 trouble shoot 1 IPQC1) power boiler: monitor fit-up, welding, PWHT, NDE, 2) power piping: monitor fit-up, welding, PWHT, NDE, 3) piping: monitor fit-up, welding, NDE, 4) pressure vessel( condenser and deaerator): monitor fit-up, welding, welding distortion control, NDE, pressure test5) steel structure: monitor welding, welding distortion control, 6) duct: monitor welding2 FQC: witness pressure test in power boiler, power piping, piping3 FQD

      • Market assistant manager for international project at headquater (site contractor side)

        Jun 1998 - Dec 1998
      • QAQC supervisor and welding QAQC supervisor at headquarter (site contractor side)

        Mar 1997 - Dec 1998
      • welding technical manager in Boiler, power piping, PV(site contractor side)

        Jun 1995 - Feb 1997
      • welding engineer in steel structure, duct of boiler, IP piping( site contractor site)

        Jul 1992 - May 1995
    • Formosa Plastics Group

      Dec 1998 - Nov 2003

      Zhangzhou power plant 4200MW is kind of marine/seashore(sealine) coal fire power station per ASME and Chinese BPV regulation, it is nine invested by Formosa Plastics Group. Main equipment vendor is MHI, ABB-CE. Formosa Plastics Group manages PMC for BOT in this project. website www.hs-power.com1 Expediting, 1) progress: monitor Schedule in ERP, with B-PERT, C-CHART 2) expediting in ERP: updated status, or and survey root reason when if delay being found by ERP2 Material1)scope: tube of boiler, pipe, pipe fitting, valve, spring hanger, flange and gasket, pump, cable, lamp, cable tray, elevator, instrument such as pressure gauge and transmitter, thermocouple, level gauge)1) M.R (material requisition) in ERP system: prepare per engineering manual and IBM datasheet and drawing2) logistic in ERP system: monitor material exchanger between different sub-project, Expediting, and alteration per frame contract Show less 1 project: power BOT project 6x600MW 2 owner: FPG (Fomosa Plastic Group), USA; 3 EPC: FPG4 manufacturer: power boiler/turbine made by MHI or ABB-CE5 standard ASME I, ASME B31.1, ASME B31.36 my responsibility as project QC1) monitor WPS, WPQ with mock up test for power boiler, 2) monitor NDE performed by TPI3) monitor fit-up, weld, PWHT, NDE, witness pressure test in power boiler, power piping4) monitor site re-work in economozer made by MHI, because it is rejected by national BPV authourity per china code Show less

      • PM supervisor in material and progress with ERP APP(PMC, owner side)

        Jun 2001 - Nov 2003
      • QC consultant(PMC, owner side)

        Dec 1998 - May 2001
    • Konecranes

      Nov 2003 - Sept 2005

      Noell is Garman comapny, No 1 quality in marine container crane(vendor side. before business is transferred to Fantuzzi, Konecrane. 1 production category: STS, RTG, forklift2 client: MAERSK, P&O3 standard: FEM, AWS D1.1, ISO25817, and etc4 project QC1) contract and design: acknowledge drawing and PO specification2) TPA in shipyard: liaison with shipyard TAP such as ABS, BV, MHC3) workshop fabrication: monitor workshop in steel structure per AWS D1.1: material, NDE, welding, dimension, airtight test, blasting and painting4)assembly: monitor site assembly in steel structure installation, mechanical work, electrical work5) final inspection:5.1) commission test in gearbox, transformer, elevator, 5.2) function test in crane.5.3) sea fastening inspection with TPA before shipping Show less

      • Subcontract business deputy manager( vendor)

        Jan 2005 - Sept 2005
      • project QC manager in marine container crane(vendor side)

        Nov 2003 - Jan 2005
    • Intertek

      Sept 2005 - Sept 2005
      TPA inspector in marine material

      1 material: casing (foundry)2 category: shell of engine of ship3 inspection: review MTR, visual inspection, dimension inspection, witness MT, release

    • Intertek

      Mar 2008 - Sept 2009

      pre-word: after 2010, Moody is merged into Intertek, detail as https://www.intertek.com.cn/service/equipment-qa.1 Standard: ASME VIII, GB150, GB151. specification from both FLUOR and BASF and JGC, and etc2 Category:2.1 pressure vessel, heat exchanger( floating head, U tupe, rod baffle, dimple, jacket), reactor, pig launcher and receiver 2.2 material: SA516Gr70, SS304, cladding plate;3 vendor: Morimastu, Sunpower, Carlie S.S company, Langfang piping company.4 EPC: FLUOR, etc5 QA: review status in drawing and procedure, qualification, calibration, witness mock up test, NCR, ASME U stamp with ASME inspector, 6 QC: review material MTC and check traceability per ASME II, drawing, PO spec.witness per ITP in fit-up, opening nozzle, visual inspection, dimension isnepction, pressure test, leakage test with He/NH3patrol inspection in welding workmanship per ASME II, IX and PO specification, ferrite test in weldoverlay(WOL) in cladding plate per PO spec.witness and review heat treatment per ASME and Drawing and PO spec.review RT film, review RT/MT/PT report per ASME V and VIII, drawing, and PO specificationantirust inspect in painting, pickling and passivation, polish7 project reference list:INVISTA Fiber plant(foshan) per ASME VIII+GB150INVISTA Mexico/USA per ASME VIII+ASME U tsampBASF YPS-II (nanjing) per ASME VIII+GB150/GB151, as EPCM of Flour USAoil field(Algeria) per API 5CToil field (Sudan) per ASME VIIIShell world largest LNG (Qatar) per ASTM A123+AWS D1.1, as EPCM of KBR+JGC JapanChina-Kazhakistan pipeline per API 5L Show less 1 standard: AWS D1.1 and ASTM A123: 2 vendor: HYA(Korea) in Penglai city3 EPC: JGC, Japan4 project: SHELL Qatar(GTL) 5 QA: Audit sub-contractor in galvanizing,monitor calibrationNCR and trouble shootreview drawing status, alteration in materialreview project procedure: WPS, hot galvanizing, dimension control, material control etc. steel structure, 6 QC: 1) material inspection with review MTR per ASTM and JIS, and traceability, 2) IPQC: patrol inspection in welding, dimension in bolting hole, overalls size and distortion after welding and galvanizing, 7 Release inspection: 1) final inspection in hot dip galvanizing per ASTM A123, diemension per AWS D.1, marking, barcode of logistic, closing NCR/punchlist, 2) review packing list per approved drawing for component, loose part, bolting3) Review MDR/MTC4) approve in release note. Show less TPA in pipe and tube 1 audit: vendor at Valin hengyang pipe mill2 mill inspection per API/ASME2.1 oil field piping (N80, P110) per API 5CT: 1) mill surveilance per ITP and client Spec at vendor Hengyang pipe mill, and Boaji pipe mill. 2) inspection scope: witness pipe made from hot rolling/cold drawing/ expanding, hot treatment, material laboratory test, visual and dimension inspection, NDE(PMA, UT, MPI, EMI), pressure test, machining inspection, phosphating, assembly test, making and packing, review MTR, expediting, trouble shoot in failure from pressure test and pipe size 2.2 natural gas piepline made from SSAW per API 5L 1) mill surveilance per ITP and client Spec at vendor tongyu pipe mill2) MOODY team shift supervisor: (1) coordinating inspectors, (2) review MTR; (3)witness laboratory test in material retest and mock up test in welding per shift and spec., (4) patrol inspection IPQC; (5) prepare daily flash report and weekly surveillance report including expediting. (6)truble shoot in MTR deviation3) inspection scope: witness material retest with UT and laboratory test(grain size etc), witness mock up test(tensile test, impact test, hardness test, 落锤 试验(NDTT)、韧脆转变温度(FATT50)); , NDE(RT), pressure test, bevel, coating , making, review MTR, expediting, trouble shoot in MTR deviation.2.3 A106B pipe per ASME IIsame as 2.1.1, without machining and NDE and assembly and phosphating.2.4 tube per ASME and M.R1) mill surveilance per ITP and client Spec at vendor JiuLi2) inspection scope: witness bending, heatreatment, PT, pressure test .3 project reference list1) Algeria oil field, Algeria; 2) Natural gas pipeline, Kazakhstan: 3) water treatment, Brazil4) BASF YPC II, Show less valve inspection1 standard: API 6D and API 600 and MSS SP-67 etc and PO spec.: 2 vendor: Zigong Khiz company , zigong high/middle pressure valve company, unival, Chaoda valve company3 valve category : 1) gate valve, globe valve, check valve, ball valve ; 2) iron A216, A216WCB, A1053) operation with handle, wheel, gearbox, hydraulic and pneumatic actuator4 inspection scope: 1) visual inspection, assmebly inspection, pressure test , 2) review: MTR and NDE report and production certificate; 3) function test in operation for API 6D 24" forging valve with hydraulic and pneumatic actuator5 project reference list1) CCPP (Natural gas treatment/power plant), Pakistan; 2) BASF IIP, 3) water treatment, brazil Show less

      • TPA inspector in oil, gas, petrochemical per AWS,API5CT, API5L, API6D and API600, ASME VIII, GB,NACE

        May 2005 - Sept 2009
      • TPA inspector in steel structure per AWS D1.1 and ASTM A123

        Apr 2008 - Feb 2009
      • TPA inspector in pipe(seam/seamless) and tube per API, ASTM

        Jan 2006 - Apr 2008
      • TPA inspector in Valve per API, MSS

        Nov 2005 - Apr 2008
      • TPA inspector in instrument

        Mar 2008 - Mar 2008
    • SPX Cooling Technologies, Inc.

      Feb 2010 - Aug 2013
      Supplier Chain QAQC supervisor ( EPCM team, air cooler)

      1. vendor management : audit vendor, monitor and guideline new vendor2 mill surveillance in vacuum duct and piping, steel structurePIM, review MTR, review WPS, traceability, workmanship, weld, NDE, Visual inspection, dimension inspection, painting inspection, 3 international inspection: inspection in piping at Eurotech Company in Thailand4 project reference list:4.1 international project:1)Chica: fan stack of air cooler2)Ivanpah: fan stack of air cooler3) GWF Tracy: fan stack of air cooler4) Riyadh: fan stack of air cooler5) NIkiski: fan stack of air cooler4.2 China project: 1)Shalaqi power station2x600MW: steel structure2)air cooler for Ewenke power station 2X300MW: duct and piping3)Zhongyu power station: fan model test, motor function test, pump function test, bellow final inspection with pressure test, hoist function test, piping hanger funtion test4) mongola Zhenglanqi self-power station of Aluminum plant: piping5) Beijing power station of buring trash: fan, vacuum pump function test, mainentance device function test Show less

    • Tecnicas Reunidas

      Aug 2013 - Oct 2015

      1 project category:1.1 refinery: TOTAL OPTARA Refinery plant, Petroperu Refinery plant, STAR ARP refinery plant, aegean refinery plant, talara refinery plant per PED/ASTM/API/ASME/NACE1.2 petrochemical: SABIC Petrokemya MDI, SABIC keymya, petrokemya ABS1.3 CCPP(gas turbine power station): ASHUGANJ 450MW, banglasdensh; Los Minas Dominican, NODO PROJECT2 production standrad: ASME I, ASME VIII, ASME II, API 6D/600/602, API660,API661 and etc3 major vendor list:3.1 mechanical equipment and material1) piping: Neway valve, chaoda valve, jingong valve, Kflow valve, Dagao forging valve, OK flow mechanism, SUNE valve, Spain VALVE; APCO piping fitting, longshan pipe fitting, chengde pipe mill, Wasin pipe mill, chengdu pipe mill;2) pressure vessel including tower,heat exchanger and reactor: KNM, zhangjiagang heavy indurstry company, Dalin hydrogen reactor company, Morimatsu, SMEC, WCE3) boiler:3.1)HRSG of project Los Minas CCPP power station, Dominican: NOOTER ERIKSEN (DNT)3.2) hot oil heater: Supzet3.3) flare: John Zink/ JPMEC, TIMEC4) air cooler: Ha Er bin aircondition company5) air compressor: Shan Gu Comapny3.2 electrical eqipment:1) power transformer: 韩国晓星电气(南通)hyosung South Korea2) GIS: ABB high voltage switchgear company(Xiamen), 500KV GIS SUBSTATION- NODO PROJECT3)lamp and explosion proof application: Warom(Shanghai)4 job scope: 4.1 expediting: reactor with claddig, complex reactor, transformer4.2 auditing vendor: auditing new vendor, project auditing in approved vendor4.3 project QAQC1) VDDR2) PIM3) labrotary test, review/witness NDE, pressure test4) final inspection, function test, polishing, pickling and passivation, packing, and release5) trouble shoot6) work with ASME inspector7)client relationship: visit factory with client, TPA from client side Show less Tecnicas Reunidas is EPC company in power station, refinery, petrchemical炼油、石化工业、发电。1. Project name: CEPSA(shanghai) phenol and cumene2. main equipment: heat exchanger and tower, API pump, flare package with derrick, heater package with duct, electirical panel, instrument flow meter, 3. surveillance scope3.1 pressure vessel and heat exchanger:1) standard: ASME VIII2) PM QAQC scope: PIM, VDDR(WPS, procedure and ITP), QC per ITP, expedite 3) major vendor: Morimasu(Nickel material pressure vessel), KNM(tower, and SS reactor), YPV(pressure vessel with big wall thickness), Lima(heat exchanger)3.2 API pump skid: 1) standard: API 6102) QAQC scope: review quality documentation, witness factory performance test in API pump per datasheet, after assembly with mechanical seal and motor;3)major vendor: ITT, KSB, Grundfos3.3 boiler skid/module1) category: TR hot oil heater skid with duct, Sagemis flare skid with derrick steel structure,2) standard: ASME I, ASME VIII, ASME B31.3, AWS D1.13) QAQC scope: PIM, VDDR(WPS, procedure and ITP), QC per ITP, expedite, trail assembly, trouble shoot4) major vendor: T.R Shuangjia Heavy indurstry; 3.4 HSE skid:1) category: carbon absorbor, watst water facilitym 2) QAQC scope: visual inspection, dimension inspection3) Major vendor: Best, Backman waste water facility Show less

      • Quality manager (EPC side, Supply chain department, China zone)

        Jun 2013 - Oct 2015
      • Project Purchase QCC in China(EPC side)

        Aug 2013 - Jun 2014
    • FBV Inc.

      Nov 2015 - Mar 2017
      Quality Director (vendor side)

      1FBV provides on-off valve for EPC company :1.1production category: ball valve , gate valve, globe valve, check valve); made of foundry in big size valve or forging in small size valve1.2 accredite in ISO9001 and PED by SGS, API 6D, HSE function test by TPA (API 607/6FA, API 624), API 602, API 600, API 591, workmanship to risk control in crack (NACE MR0103, NACE MR0175, NACE TM 284, ASTM E262), WPS/PQR by SGS 2. my management:2.1 QA/QC team: QA team, QC team, lab. Team; define and monitor the position and responsibility of inspector2.2 monitor QA/QMS: 2.2.1 keep organization, key positions, sub-vendor, procedure; internal audit procurement/design/workshop/warehouse, Update manual and procedure per ISO9001:2015, internal auditing per PPAP and FEMA in model test and design package for Shell type test, establish purchase QA management2.2.2 daily job: calibration, casing material inspection with traceability, machining QC per MSA and SPC, welding , NDE, assembly, pressure test , painting, audit PO, monitor QAQC per PO, monitor NCR, review MTC, release 2.3 APQP (procedure):2.3.1 WPS/PQR: establish WPS/PQR/WPQ for weld body, welding overlay2.3.2 audit Design with ITP and witness model test per TOTAL SPEC: life cycel test, HP pneumatci test, emission leakage test, besides common test per API 6D2.4 type acceptance test for Shell , API 591, API 624, 3 Onshore after sale service to EPC in Mexico:1) after sale service with international travel at field natural gas pipeline in Mexico from Nov 2015 to Feb 2016, after just joint in FBV, and travel to Mexico by only myself to face owner, EPC, site contractor Show less

    • 自由职业

      Feb 2016 - Feb 2017
      TPI freelance in QAQC/expediting pressure vessel and auditing module

      A project auditor for module feasibility from China to USA1 vendor: Yan Da company2 production: module3 auditing:on behalf of EPC, audit vendor qualificatiion , capability in module for petrochemical.B PMQAQC/expediting in pressure vessel1 project 1.1 category: HSE project, 1.2 name: west ranch CO2 recycle facility, Hilcorp 1521418 phase II , USA2 production:reactors of pressure vessel per ASME VIII+ ASME U stamp, material is made of cladding plate, 3 vendor: jiangnan Boiler & Pressure vessel company4 PM QA:1) project auditing for qualification and capability: review vendor qualification certificate per ASME and ISO9001; review qualification in welders and NDE insepctor per ASME. review WPS/PQR per ASME; review calibration, review QC facilityreview workshop facility.observe material management in S.S at workshop.5 PM QC:1) PIM with licensor, TPI inspector;2) IQC inspection: review MTR, check material traceability3) IPQC inspection: witness fit-up, opening for nozzle, welding, review NDE(RT/UT/MT/PT) report, witness PAUT 4)FQC: witness pressure test with ASME inspector for ASME U stamp, inpsect pickling and passivation, nameplate, 6 PM expediting: material purchase, fabrication and assembly, observate bottleneck, issue release note. Show less

    • Tianhai petrochemical pressure vessel Co. (TH)

      Mar 2017 - Nov 2017
      Vendor Project QA Manager ( OEM side for John Crane)

      TH is OEM vendor in wet cooler or dry cooler with ASME U certificate; provides John Crane with tpackage/ Skid/module W/H steel structure, heat exchanger, piping, instrument) per ASME, AWS, NACE MR0175, NACE MR0103, NACE TAM 0284, API682 seal system; While John Crane, who is No1~3 in mechanical seal with flowserver.Strength capability for this job: 1) experience in steel structure, piping, pressure vessel, valve(Noell, SPX, Moody, FBV). 2) experience in package such as flare, Waste Steam Recovery Generator(as TR QCM), 3) experience in Pump skid (as TR QCC), 4) experience in ITP and procedure(Moody, TR)5) experience in manufacturing QAQC(NOELL, SPX, FBV)6) qualification certificate in weld and NDE 7) 8D(FEMA)1 Project QAQC 1) bid phase: find special requirement per spec., and internal audit and monitor special production certificate such as MIGAS, SASO, besides PED, ASME U2) APQP (procedure): let EPC to approve ITP, material PMI, WPS, NDE, pressure test, painting procedure3) review material requisition per project spec. and ASME II;4) PIM;5) coordinate W.H from TPA,client side6) approve MTC(FAT), ASME stamp per standard and project Sepc.2 QAQC system2.1 establish work instruction 2.2 monitor personnel qualification2.3 monitor calibration2.4 some training3 8D, FEMA and learn lesson3.1 8D: find root reason and improvement3.2 FEMA: analyze all kind of failure in packaged per different production3.3 learn lesson: avoid same quality problem in next project4 quality status:1) Analyze risk and production and NCR from client, make out, and monitor KPI: material, weld, pressure test, cleaning;2) Monitor first acceptance rate of material PMI, first acceptance rate of RT in weld joint, first acceptance rate in pressure test.5 ReferenceKOC, oil Socar, gas, HQC寰球+TechnipKNPC, New refinery plant /TR/Flour, HGS, GENP, GARO, SULZER, FPD, EBARAORIPIC, gas, LIWA PLASTICSAUDI ARAMCO, gas, Al Fadhili(FPG)/TR, ITT土库曼斯坦oil/gas:CNPC+ Solar Turbine Show less

    • RAYS Flow Control

      Nov 2017 - Mar 2018
      QAQC manager per API Q1, 6D, iso9001; HSE manager (vendor side)

      1 Rays flow control company provides API valve, especially forging ball valve for EPC company1)QAQC per ISO9001 and PED by SGS, API 6D, PED, TR-CU(GOST), TS. HSE function(API 607/6FA, API624), crygenic test at -120, NACE, UT, Nuclear power certifying; 2) advanced design and technique and testing facility(fugative test, crogenic test) in both on-off valve and automatic valve, especially in forging ball valve: 1)general , 2) top entry, 2)Low temperature, 3) Orbit; 4)welding body3)facility: tensile test, hardness test, misco, PMI, NDE, fugitive emission, crogenic test, working lifte test,2 My responsibility:2.1 QAS: as API Q1-4.2.3 Management Representetive, 2.1.1 ISO9001: Update manual and procedure per ISO9001:2015, ISO14000:2014; internal auditing per PPAP and FEMA in model test and design package, establish purchase QA management2.1.2 QA of nuclear power station: being certified after establish new quality assurance system, study valve standard for nuclear power station, perform internal auditing, improve design and purchase and QAQC(ITP, IQC, FQC, MTC)2.1.3 monitor the certificate of ISO9001, PED, TS, API 6D, API 600, API6022.2 project QAQC: 2.2.1 APQP: 1) auditing PO, 2) prepare ITP and procedure and lab. test item, per PO Specification3) take part in PIM2.2.2 project QC: 1) material inspection, machining, assembly, pressure test per PO SPEC and approved ITP by EPC, with SPC and MSA3)project special quality: witness or review NDE, PMI, F.E test per ISO15848-2, API 607,4) NCR: establish computer MIS control 5) release and MTC per EN10204 3.1 and PED:2.2.3 TPA: coordination2.3 PPAP and SPC: witness perforamnce test in new design, PO with special requirement such as PO 1228 for low crogenic test, PO 1261 for API 607 anti-fire, PMI/ NDE /ENP etc per PO spec.2.4 QAQC manager:monitor IQC, IPQC, FQC, provides MTC, and COC/DOC for PED CE1155 valve3 HSE:monitor HSE in HSE manual and HSE activity and improvement Show less

    • CMEC, Inc.

      Mar 2018 - Dec 2022

      milestone at jhang CCPP 1263MW per ASME /API /NFPA/ ACI /IEC/ISO, in Pakistan: 1 work with SIEMENS, EETC, HEPC, JEPCC, TEC, TPAI BV and VELOSI, ASME inspector, 哈电HEI O&M和华电HDC O&M运维, and PTPL, LMY, NESPAK, 2 witness solo test in flushing in pipeline, trial run of motor, pump, fan; calibration of gauge, adjust of valve with actutator.3 witness hot commission test with interlock and logic test via ACS/DCS 3.1 BOP: electrical energization in 220KV swicth yard, HVAC function test, function test in NFPA pump house, demi. water treatment plant, diesel oil, natural gas, H2 station, bypass stack, 3.2 gas turbine: first fire, reliability test with 168hrs in Gas Turbine, 3.3 boiler: steam flushing in HRSG boiler ASME I and power piping ASME B 31.1 and bypass steam pipeline ASME B 31.3, with operatation of PCC, CCB, DCS, GT, bypass stack, main stack, feed water, condensate water, CCCW, wet cooler, CWP, deep water system, demi. water plant, dosing pipeline, and etc. 4 we do PMQAQC with below PDCA4.1 ITP and procedure for installation and commission test , approve vendor, exam welder and approve WPS per ASME IX, approve TPI with NDT procedure, 4.2 inspection per ITP and SIEMENS FQP and Specification: IQC, IPQC, pressure test, FQC with ASME stamp, ECC, close punchlist; 4.3 cold commission test with boiler pickling, water flushing, solo test in motor, alignment of pump and fan, 4.4 release to hot commission test from installation with joint inspection(installation, commission, operation) in HRSG and ST and temporary flushing pipeline, 4.5 TOC punchlist: 1) organize final inspection; 2) organize the analyze in improper punchlist 5 survey in operation accident1) SIEMENS lubrication pump: scrath in shaft of pump should be risk from SIEMENS, due to filter2)expansion joint of oil tank to oil pipelne: broken should be risk from NESPAK's design comment, due to oil level 2.3m and DCN in check valve Show less 1 audit 1.1 site contractor: audit it per ISO9001 and ASME qualification certificate for ASME stamp in boiler 1.2 vendor: audit it material per experience from EPC offshore /vendor/ TPA/contract/ASME, API and ISO90011.3 sub-contractor: audit local sub-contractor per ASME U certificate and ISO9001 in demin. water tank1.4 TPI: audit per ISO9001, ASME, qualification certificate, and procedure, contract2 contract/ASME/ACI/IEC: monitor3 project QA3.1 ISO90013.2 purchase: approve vendor for mechanical and Electricalwork, MAS for civil work3.3 constructionITP & procedure(Methodology) ; kick off meeting3.4 technology: 1)WPS/PQR for PV and boiler and piping; 2)JMF for civil work4 relationship to owner/Siemens: liaison with client PTPL, client's TPI LMY/NESPAK, and Siemens1) Quality meeting: 2) quality deviation and improvement5 IPQC/FQC: witness per ITP6 NCR: Survey and closing NCR 7 release: monitor release from civil work to mechanical work, release from constrution to hot commission, release from commission test to O&M team8 Commission test: 8.1 review and approve procedure:8.2 Solo test: 1) randomly witness fire alarm test at hydrogen station and GT hall, loop check, oil flushing of main transformer2) witness I/O test in ball valve at natural gas supply station3) witness energying/back feeding at 220KV switch yard, 11KV pabel at GT hall4) witness pump test8.3 hot commission test1) ATS: random witness ATS in E-panel at CCB, GT2) water treament station: witness performance test in capacity, water quality test3) natural gas station: witness interlock and performance test with warning, trip, and etc4) H2 station: witness interlock and performance test 5) HVAC: coordinate commission test with trouble shoot in design, equipment, construction6) NFPA: witness performance test motor pump per ER/NFPA 207) Gas Turbine: closing punchlist B, witness reliabilty test with 7days and performance test Show less 1design reviewing and improvement in pipeline:1.1 design auditing: survey DCN in 2019 and oil tank truck, find the problem in design, make out engineering solution, picture 3# is verified my design control is good for operation to unload oil. 1.2 also gave a design improvement in detail design to cut down about 30% welding joint in order for QC and progress. 2 Interface trouble shoot in civil grating: observe much distortion and gave a engineering solution to TEC Pakistan fitter, it is verified OK in second unloading. 3 progress: 3.1 purchase with skill: 3.1.1 material requisition: survey required material at HAVELI CCPP with support from project manager, after report detail drawing is not good for material requisition.3.1.2 material substitute: raised material substitute3.1.3bottle neck in payment: 3.1.4 purchase progress: check PO status 3.2 Interface: coordinate civil work before installation. 3.3 pipeline installation: monitor manpower, assess progress rating per dealine, report abnormal.4 QAQC: AVL, MTC, WPS, vacuum test, DI, NDT, pressure test, painting in oil tank API 650, pipeline ASME/API5commission test:5.1 pipeline :coordinate and witness steam flushing an oil flush5.3 pump and motor: coordinate solo test of pump and alignment of pump 5.4 function test: witness logic and interlock test of function test per procedure, 6 maintenance in leakage of pump and flange:6.1 mobilization: mobilize HEPC per EPC contract to site contractor 6.2 resource: coordinate spare part of PO and OM manual in mechanical seal, 6.3 progress: witness dismantle and replace with new mechanical seal as picturing 8#, with tighten flange,6.4 HSE: clean off leakage oil at floor for HSE. 6.5 maintenance QC: think out how to QC, witness unloading in order to verify maintenance is OK without leakage. as picturing 1#8 cost control: verify material quantity and manpower quantity and mechanism time, review and approve extra cost from DCN per job record. Show less 1 PMQA:1.1 MSA: review and approved calibration agence per ISO17025 certifciate, monitor calibration in key equipment in civil work, and QC instrument from site contarctors, commission test company, Siemens1.2 APQP: review and approve WPS of welding for bus-bar(IPB made of Alumimum), ITP, procedure for installation and commission test1.3 project spec.: review and approve TPI per ER contract1.4 NCR/SOR/punchlist: monitor with FEMA per survey1.5 release: 1) from civil work to installation; 2) from construction to commission test, 2) from commssion test to O&M team of Owner2 Purchase2.1 audit vendor in cable, cable tray, lamp, and etc; 2.2 review MTC of lamp, cable, cable tray per contract spec. and IEC;2.3 material inspection: visual inspect Siemens 11KV transformer in 2018, witness lamp inspection3 Construction:3.1 in-process 1) general witness : lamp, cable, cable tray, panel, transformer installation2) busbar witness: welders skill exam for either IPB from transformer to generator,or instrument tubing for hock up drawing3)witness leakage test in generator of GT hall 4)witness handling in big equipment: generator, transformer, CWP motor3.2 final inspection with erection completion certificate:review and approve Show less 1progress experience before : 1) onshore power station as PMC 2003~2005 with ERP, B-pert and Chart, 2)reactor and power transformer as EPC offshore 2013~2015, 3) HRSG fabricatiion: as TPI 2020 during vacation for Foster Wheeler , 4) civil experience in power station 2018~20202 progress2.1 report with weekly PPT 2.2 progress plan: monitor and access2.3 key road map: monitor progress in key road map relative to milestone.1)daily monitor working item per weekly progress plan, 2) assess work plan at the end of week3 big concrtete pouring:1)TPI test in pillar before foundation work; 2)inspect HSE facility for higher supporting by scaldfold; 3)material store up quantity and batch inspection. 4) witness in-rocess, 5) monitor curing after concrte pouring; 6)witness or and review laboratory test report4 coordinate: 3 site contractors in GT hall5 business1) material fee: review and approve material requisition in sand, cement, aggregate, re-bar, brick,etc, review payment with monitoring material receiving2) mechanism fee: observa and review payment3) labour fee: review payment Show less QAQC in Piping per experience from 1) 2006 TPA moody in API 5CT seamless pipe, API 5L seam natural gas pipe, 2) 2020 TPI in header of HRSG made by Amec FW; 3) 2017 vendor John crane OEM in wet cooler module of mechanical seal of pump and mixer of reactor, 4) 1999 owner PMC project engineer in material requisition of piping of fossil power station 4200MW; 5) 1992 site contractor welding engineer in piping of ST, boiler, power piping of fossil power station 600MW1) review and approve in procedure, ITP; WPS/PQR/WPQ; TPI in NDE2) monitor per ASMEII, ASME IX, ASME V, ASME B31.1power piping, ASME B31.3 fluid piping, ASME B31.8 natural gas pipeline, ASME B31.12hydrogen station, contract and drawing specification3) Material: (1) Audit vendor in pipe, pipe fitting, and pipe support, painting vendor,(2) review MTR in pipe, pipe fitting, MTC in painting(3) beveling4) pre-assembly: (1) Fit up inspection per ITP(2) Welding inspection including WPQ mock up test(3) Review NDE report per ITP(4) blasting and pre-painting : CWP, natural gas pipeline5) site assembly: 6) Final inspection before pressure test per ITP: (1) pipe and pipe support(2) review quality report in material, welding, NDE, calibration in pressure gauge7) Witness pressure test per ITP8) Touch up painting9) Flushing10) N2 protection for natural gas pipeline, closed cooling water pipe of air cooler11) Release with ECC(erection completion certificate) Show less Steel structure inspection per experience from 1)2008 TPA Moody in steel structure of project Shell GTL,Qatar; 2)2003 vendor Noell project QAQC manager in container crane, 3)2010 vendor SPX supply chain supervisor in air cooler, 4) 1992 site contractor JLEPCC onshore engineer in steel structure and duct of boiler1) approve in drawing, ITP; WPS/PQR/WPQ; TPI in NDE2) PIM per AWS D1.1 and drawing specification3) material: (1) steel structure: review MTC in bolting and steel structure, and randomly inspection(2) painting: audit painting vendor, and review MTC in painting(3) anti-fire coating: audit vendor with datasheet per drawing specification, and mock up inspection4) embed inspection:5) assembly column: (1) fit-up inspection, (2) welding inspection, (3) UT per drawing specification6) dimension inspection per ITP7) bolting inspection per ITP: torque test8) grouting anchor bolting9) touch painting inspection10) anti-fire coating when if applicable11) Release with CCC(construction completion certificate) Show less 1Material manager with experience from EPC / TPA /vendor1.1 Client relationship: 1) Contract: access client requirement per contract, 2) Coordinator: discuss in weekly meeting1.2 audit vendor:1) Rebar, aggregate, cement, soil, brick of civil work2) steel structure, pipe , pipe fitting, pipe support, plate of CWP and pressure vessel;3) cable, lamp of electrical work1.3 material requisition: coating, false roof, antistatic floor, window, NFPA door, and etc. of civil work1.4 material verification inspection:mixing design in concrete of civil workmock up inspection1.5 material store up inspection1) TPI inspection per batch in civil work, review report in site laboratory test per batch in civil work2) review MTC with TPA inspection in mechanical work per contract and ASME II and drawing specification3) review MTC in electrical work per contract and IEC 1.6 site usage: observe1.7 trouble shoot1) QC in sub-base, aggregate2) TPI report in rebar of S.T3) QA in plate or and shape steel vendor 4) progress in architecture material 5) progress in vendor qualification 2 Welding/NDE manager with IWE and ASNT certificate for QC in steel structure, piping, pressure vessel, boiler per ASME and contract2.1 WPS/PQR: review and approve per ASME IX; 2.2 WPQ: witness mock up test for welders per ASME IX2.3 welding filler: review vendor qualification, make out clarification the argument between vendor and site contractor for welding aluminum IPBreview MTR,monitor usage: baking, storage in oven.2.4 welding equipment:CalibrationHSE case during installation in GT2.5 NDE review and approve1) Standard: ASME2) specification: Contract and design drawing3) TPI: review and approve4) HSE certificate in Pakistan5) procedure 6) NDE inspector: qualification7) NDE activity: randomly witness UT, MT, PT8) NDE report.2.6 heat treatment1) Standard: ASME2) calibration3) review record and curve. Show less

      • EPC site QAQC manager to monitor commission test,operation

        Jun 2021 - Dec 2022
      • EPC onshore QAQC manager in construction per contract/ACI/ASME/NPFA/IEC with HRSG/GT from Siemens

        Nov 2019 - Dec 2022
      • site mechanical supervisor EPCICM in PVV of diesel oil

        Sept 2019 - Dec 2022
      • QAQC in electrical and instrument, erection and commission test(solo test and hot commission test)

        Oct 2018 - Dec 2022
      • EPC site civil engineer(design, progress, QAQC, cost control in payment) in civil work

        Sept 2018 - Dec 2022
      • QAQC in piping

        Jul 2018 - Dec 2022
      • QAQC in steel structure

        May 2018 - Dec 2022
      • Material, Welding manager

        Mar 2018 - Dec 2022
    • GIS Group (Global Inspection Services)

      Jun 2020 - Jun 2020

      FREELANCE: Valve auditing & inspection1 valve category: gate valve A217CA12 2500LB, globe valve, check valve, Ball valve NPS 30"2 Audit: API certificate and facility and calibration3 Assembly inspection: witness pressure test and pneumatic test, review MTR and traceability, visual and dimension inspection 4 Release inspection: painting, packing, release note Auditor in valve 1) Auditing ISO9001 manual, procedure, internal auditing, ITP, etc2) Auditing qualification certificate in API, PED, Gost, API624, API 6FA3) Auditing facility and laboratory4) Auditing foundry : facility, flow chart, workmanship5) Auditing valve: category, facility, material, machining, assembly, pressure test, blasting and painting, workmanship, store house.

      • TPI inspector in valve for ARFLU, Spain

        Jun 2020 - Jun 2020
      • TPI Auditor in valve

        Jun 2020 - Jun 2020
    • OCA GLOBAL

      Jul 2020 - Aug 2020
      TPI inspector in boiler HRSG of CCPP for AMEC Foster Wheeler of Wood Group

      FREELANCE from TPI OCA: resident inspector of Amec Foster Wheeler1 Project : TSK port Lome2 Production: HRSG module ASME I, ASME VIII, AWS D1.1, ASME B31.33 inspection and test:1) QA: auditing SUNCO and Chuxin, TPA/TPI in EN10204 3.2, PAUT2) project QA: monitor VDDR(ITP, WPS, NDE, PWHT, dimension control, pressur etest procedure), acknowlege datasheet, specification, general notes from Amec Foster Wheer of Wood3) Progress: monitor VDDR, check material, Calculate and estimate fabrication status, observate bottleneck4) Mock up test : witness in HF ERW, bending, performance in welding and drilling 488L, including witness tensile test, hardness test, macro test at the Laboratory.5) material: review MTR per ASME II and specification from Amec Foster Wheeler, including SHT, UT, PMI; review EN10204 3.2 in steel structure; traceability6) PIM: witness in HF ERW, header, Harp assembly, steam drum7) fabrication inspection:(1) fin tube: HF ERW, immersion, bending, cutting, beveling, cleaning inside;(2) header: machining, fit-up insepction(nozzle and end plate), welding, NDE(MT, PAUT), dimension inspection(3)drum: cutting, beveling, blasting, rolling and forming, beveling, fit-up, SAW, RT, nozzle opening, welding, NPP, NDE, PWHT, NDE8) assembly inspection in HARP:(1) header verification and lcoating, (2) 488L: Fit-up inspection, preheating, welding, MT, dimension inspection, PWHT/PBHT, pressure test ,touch up coating9) Assembly inspection in O ring Show less

    • Aces Global

      Jan 2023 - Mar 2023
      TPI expediter in pressure vessel for EPC TOYO 4PPP

      1 monitor 75ST pressure vesse in fabrication ( drum, heat exchanger, tower,hopper, pot) at vendor Qiuyuan for 4PP聚丙烯 project located in Japan2general PM: audit, expedite, monitor, and assess the workshop progress per schedule and PO delivery and actual progress3 engineering:acknowlege macrostructure and TOYO requirement, and survey detial of flow chart per drawing and specification 4 purchase: monitor and expedite purchase status in tube of heat exchanger, plate, flange, forging5 S/C: monitor and expedite sub-contract workscope and status: machinining, forming, welding of Heat exchanger, RT of vessel.6 workshop:6.1 monitor facility and manpower and bottleneck6.2 monitor and expedite workshop status in pressure vessel: machnining, NC/laser cutting, rolling, fit-up, welding, Nozzle prefabrication and assembly, bundle of heat exchanger, internal part and external part, NDE, PWHT, buffing, blasting, 6.3 monitor and expedite ladder and platform engineering, fabrication and trial assembly with ladder and platform, blasting and painting7 take part in weekly meeting with EPC TOYO and vendor in progress, including engineering, schedule, QC deviation, schedule and work plan8 weekly progress report9 work with vendor team: 1)PM manager for updating schedule and meeting, 2)purchase manager for material delivery, 3)workshop manager for bottleneck and next week working plan, progress delay observation, 4)QAQC manager for QC deviation and RT progress , final inspection expditing Show less

    • 新杨新材料XYNM (Xing yang new material) , a small EPC with vendor background in GRE pipe of oil wellhead

      Mar 2023 - Mar 2023
      EPC site QAQC manager of sale section of vendor in GRE pipeline and skid of oil wellhead system

      1 project: SOURCE WATER GRE PIPELINE WITH SKID OF OIL WELL, HAFAYA, Iraq2 new project PO 5171 in 2023: QAQCITP in GRE pipeline, QC procedure, welding WPS and repairing procedure in DSSReport to owner that procedure deviation from PMC(Petrofac) , who uses NDE engineer to review and give not reasonable comment(most is beyond client's spec.).3 old project PO 5120 in 2021: purchase and businessBottle neck of Engineering TQ: trouble shoot with survey in instrument gauge, automatic valve, grating, DSS valve, GRE pipe from technical query per CPE spec. and ITBBottleneck of MCC and progress payment: trouble with survey, report that owner CPH/CPE and PMC Petrofac is against contract per payment condition and MCC workshop of contract Show less

    • China ENFI Engineering Corp. A EPC with design background in non-ferrous smelter

      Apr 2023 - now
      EPC project site QAQC advisor of Nickel matter smelter project in Indoniesia

      as EPC site QAQC manager, quality advisor, quality engineer in project CNI/CMP nickel ferrous smelter1 owner relationship:1.1 monitor with acknowledge the QC requirement and work scope per contract 1.2Weekly meeting with PMC, PP1.3 feedback comment in ITP from PMC2 quality system 2.1 acknowledge of EPC contract, and S/C contract, GB standard, drawing, main process, process equipment2.2 Monitor QAQC organization chart and Key inspectors;2.3 Monitor ITP, quality record(checklist), calibration, government certificate2.4 monitor project procedure in site inspection, welder2.5 quality improvement per PMC comment with EPC view angle to analyze2.6 monitor welding QAQC : welding filler, WPS, welder skill mock up test2.7 weekly quality internal auditing in NCR, drawing management, protection, fit-up, welding, bolting, painting, workmanship2.8 NCR/QOC(SOR): analyze root cause, Q.I for improvement, and reduce quality risk from purchase and WMS and etc3 coordinate3.1 MRR: trouble shoot with PMC in MRR bottleneck with notifying before 1 months, coordinate MDR and MRR record, Remind equipment storage protection procedure per contract 3.2 design: 1) review drawing before handover from civil to installation, and find some design deviation, such as pressure vessel foundation of O2 station and air compressor, fan and bag dust collector foundation of HVAC; 2)internal audit: site management in drawing3.3 handover inspection of equipment foundation from PTPP to MCC: 1)guideline PTPP in inspection method of RKEF, steel structure, embed plate; 2.1) special survey argument in survey report of furnace, 2.2) help CMP/PMC to survey root cause of complex foundation made of S.S and concrete; 3) remind settlement 3.4 equipment installation inspection: 1) key equipemnt: RK,dryer, Furnace; 2) dynamic equipemnt: coal miller, apron feeder, impact crusher, air compressor, crane, fan, pump; 3) static equipemnt: pressure vessel, 4)HSE equipement: HVAC, ESP, bag dust collector Show less

  • Licenses & Certifications

    • ASNT PT level II, renew in 2021

      OCERT
      Jul 2016
    • ASNT UT level II, Renew in 2021

      OCERT
      Jul 2016
    • API Q1 internal auditor

      Jun 2016
    • IWE( international welding engineer)

      International institute of welding(IIW)
      Feb 2012
    • IELTS 5.0

      International English Language Testing System(IELTS)
      Jan 2007
    • MT level II

      The Chinese society for nondestructive testing
      Feb 2010
    • ISO9001:2008 internal auditor

      Neville Clarke International
      Aug 2011
  • Honors & Awards

    • Awarded to Weidong Wang
      2012 outstanding staffs in SPX dry cooling technology( air cooler) company Dec 2012
    • Awarded to Weidong Wang
      top 10 outstanding staffs in 1995, 公司10大优秀青年 company Dec 1995
  • Volunteer Experience

    • 普通成员

      Issued by 学生公益互动 on Jan 1980
      学生公益互动Associated with Weidong Wang
    • 普通

      Issued by 爱心献血 on Jan 2008
      爱心献血Associated with Weidong Wang