Yubin Li

Yubin Li

Reservoir Engineer, Team Lead

Followers of Yubin Li601 followers
location of Yubin LiCalgary, Alberta, Canada

Connect with Yubin Li to Send Message

Connect

Connect with Yubin Li to Send Message

Connect
  • Timeline

  • About me

    Reservoir Engineer at Loyal Energy

  • Education

    • University of Petroleum (East China)

      1989 - 1993
      Bachelor of Science (B.Sc.) Petroleum Engineering
    • Southern Alberta Institute of Technology

      2008 - 2011
      Bachelor's degree Petroleum Engineering
  • Experience

    • Sinopec

      Jul 1993 - Mar 2002
      Reservoir Engineer, Team Lead
    • AGAT Laboratories

      Jan 2002 - Jan 2005
      Project Engineer
    • Unversity of Calgary

      Jun 2005 - Jun 2008
      Team Lead, Research Engineer
    • Breccia oil and gas technology

      Jun 2008 - Aug 2009
      Reservoir Engineering Manager

      Montney shale; Oil sands; Shallow gas well test.

    • Tiandi Energy

      Aug 2009 - Oct 2010
      Reserves and Production Manager

      Simulation, reserve booking and economic evaluation on site of OXY; Shale gas simulation on site of Halliburton.- Constructed fracture simulation models for Montney shale play and US shale properties, PTA analysis as well.- Conducted simulation on black oil, components, and dual porosity models using Eclipse, Petrel, VIP, Sensor etc.- Worked on EMI logging to analyze nature fracture of Monterey carbonate.

    • Penn West

      Jan 2010 - Jan 2015
      Senior Reservoir Engineer

      Contribution of full skills and knowledge for unconventional tight oil formation with multi-fractured horizontal wells, and ASP Pilot in asset team within the largest conventional oil and gas company in Canada- Worked on Slave Point carbonate and Spear Fish sandstone tight formation with multi-fractured horizontal wells. - Studied remaining reserve to avoid over drilling on vertical produced zones. - Traced primary production and existing water flood to provide analysis, evaluation and actions within development team. - Generated BHP survey through PTA and analyze dynamic pressures through pump charts to have pump actions done. - Provided reservoir pressure analysis for development and drilling. - Calculated water injection rate well by well. Evaluated response of water flood using Hall Plots. - Simulated on parametric models and field models for water flood pilot, 5 years plan, and geological calibration and provided economic evaluation for as-is and water flood. - Recommended decent fracture stage, fracture half length, well spacing. Optimized water injection timing and location to reduce the producer's cost. Show less

    • Triple Polar Energy Ltd.

      Aug 2015 - Aug 2017
      Vice President Operations

      Challenging works on unconventional plays and heavy oil EOR in Alberta and Saskatchewan within a start-up company.- Reviewed and summarized production, drilling location, stimulation actions and PDP/PNP/PUP/P2 decline, operation cost, reserve evaluation and commercial plans for Spyglass, Long Run, Manitok, Twin Butte, Zargon, Hawk, Penn West, Lightstream, RMP, as well as other unconventianal plays.- Provided recommendations for the value of oil and gas properties and companies.- Evaluated drilling depth, well spacing and water flood to have NPV, payout and IRR.- Recommended water flood timing and high volume lifting operation and provided primary and waterflood pattern through fluid properties and analogy analysis.- worked on type curve, long term plans and reserve estimation. Show less

    • SCCC/Renergy Petroleum Canada Co. Ltd.

      Aug 2017 - Jan 2019
      Director of Reservoir Engineering

      Steam CO2 Co-Generation Co-Injection within Peace River oilsands area. Reservoir, production, completion......- Provided parameters (rate, volume, pressure, temperature, pattern, timing, gas-water ratio, interval, etc.) by numerical simulation for heated co-generated multi-fluid (Steam, CO2, N2) co-injection using CMG STARS. - Calculated thermal horizontal wellbore profile of pressure, temperature, steam quality, etc. through building a PIPESIM model. Completed multi-tubing horizontal wellbore configuration including production tubing, injection tubing, liner and pump design etc. Worked on completion, drilling, stimulation programs. Show less

  • Licenses & Certifications

    • Eclipse, Petrel, OFM, Peep

      Schlumberger
    • PTA, RTA, AccuMap

      IHS
    • STARS, IMEX, Chemical Flood, GEM

      Computer Modelling Group Ltd.