Muhammad Sidratul Mutaha Zuraimi

Muhammad Sidratul Mutaha Zuraimi

Trainee

Followers of Muhammad Sidratul Mutaha Zuraimi746 followers
location of Muhammad Sidratul Mutaha ZuraimiCyberjaya, Selangor, Malaysia

Connect with Muhammad Sidratul Mutaha Zuraimi to Send Message

Connect

Connect with Muhammad Sidratul Mutaha Zuraimi to Send Message

Connect
  • Timeline

  • About me

    Asset Management | CMMS SAP PM | Reliability & Integrity (R&I) | Drawing Management | Data Management | Project Management | EPCIC

  • Education

    • Malacca Matriculation College

      2014 - 2015
      Foundation degree Biological and Physical Sciences
    • Sekolah Berasrama Penuh Integrasi Temerloh

      2012 - 2013
      SPM Biological and Physical Sciences
    • Universiti Kuala Lumpur

      2015 - 2019
      Bachelor of Engineering - BE Chemical Engineering
  • Experience

    • PETRONAS

      May 2018 - Aug 2018
      Trainee

      Process Engineer (Trainee) : May 2018 – August 2018Health, Safety and Environment (Trainee)Company : Petronas Pengerang LNG (TWO) Sdn. Bhd.Manage to complete the industrial training under Operation and Maintenance and Health, Safety and Environment Sections.Detail Responsibilities: -1. Perform the inspection on Open Rack Vaporizer (ORV) by analysing the concentration of chlorine injected to the seawater for the vaporization of Liquified Natural Gas (LNG).2. Assist Process Engineer in planning process for Terminal Availability Test Run; to test and verify minimum and peak send out capacity as per design.3. Successfully operate and monitor the acid washing cleaning process for the Sodium Hypochlorite Dosing Package.4. Provide detail design and technical supports to Process Engineer regarding on design pressure, design temperature, design capacity and size of pipeline in a piping and instrumentation diagram (P&ID).5. Monitor and perform a TIER 1 on Permit to Work (PTW), Personal Protective Equipment (PPE) and Lifting Work activities by contractors.6. Ensure the storage and handling of scheduled waste is following requirement and procedure.7. Handled the chemical registration, Job Hazard Analysis (JHA), Work Leader Registration, develop summaries and analysis for TIER1 HSE Registration. Show less

    • Tan Chong Group

      Sept 2019 - Nov 2019
      Advance Engineering Department Engineer

      1. Process Parameter/audit Monitoring (4M)2. Process and layout study and improvement3. New colour and paint introduction coordinating4. Paint troubleshooting activities5. Implement and coordinate new model introduction6. To carry out review and evaluation for new model7. Liaise with paint manufacturer, supplier, TCM and Auto Dunia on paint and colour related matters8. New materials introduction (Paint work related)9. To execute Internal Audit for Quality Management System10. Plan and execute Paint Shop Fire Safety audit activity11. Paint Mixing Room Control12. To execute and implement duty assigned by the Superior when and where required13. Attend customer complaints ( related to paint issue from Plant ) Show less

    • Malaysia Marine & Heavy Engineering

      Nov 2019 - May 2022

      STRUCTURAL ENGINEER : August 2021 – May 2022Project & Project Size : KASAWARI GAS DEVELOPMENT PROJECT (CPP Jacket/23000MT)Client : PETRONAS CARIGALIDetail Responsibilities: -• To ensure the project deliver safely as per project schedule, budget and meet the requirement of the project in terms of quality, reliability, operability, and maintainability.• Monitored detail planning and schedule for manpower arrangement from Planning Master Schedule for construction phase.• Participates in project tender development, bid evaluation and contractor/vendor selection from the stage of service/purchase requisition until service/purchase order awarded.• Planned construction sequence from fabrication, erection and testing.• Served as interface between multiple disciplines including clients, design engineering, procurement, andoffshore installation company.• Monitored and tracked purchased of materials and engineering drawings for site execution workfront.• Monitored site progress for structural fabrication, installation and testing as per project schedule. • Reviewed procedure for construction work execution as per project and client specification.• Reviewed scope of works for supervisor and subcontractors for site coordination.• Conducted constructability study for piping installation and liaise with other disciplines for site execution.• Reviewed redline for engineering construction drawings from site changes for as-built submission.• Ensured quality control and safety measurement is implemented during construction.• Assisted for site technical clarification and coordinate with Design Engineering to resolve technical problems.• Familiar with international design codes and standard and client standard. Show less Position Project: Installation EngineerClient: Petronas Carigali Sdn BhdProject: Kasawari Gas Development Transportation and Installation Offshore Champaign 1(Wellhead Topside and Jacket) • Managed T&I related interface issue with client, interface-discipline, fabricator and T&I contractors.• Closed coordination with T&I contractor’s site representative at fabrication yard in terms of fabrication details,installation aid, barge documentation and ship loose material.• Interfaced and coordinated the Transportation and Installation Master Document Register between Client,Fabricator and Sub-contractor.• Coordinated with Field Engineer during upending stage of jacket by advising the ROV-Valve opening as peryard final arrangement.• Prepared documents for installation engineering, report procedure, as-built drawing, dimensional controlreport and master ship loose list.• Managed sub-contractors/offshore team including welding, rigging, ROV and vessel. • Reviewed daily report progress (DPR) based on actual activities conducted.• Participated in constructability reviews and hazard/risk assessment for jacket launching stage.• Monitored installation activities to comply according to client specification and safety standards.• Interfaced and coordinated for offshore activities between installation phase and hook-up phase.• Managed on logistic part for returning materials (buoyancy tank, flooding control panel etc.) to the fabricationyard.• Close coordination with T&I contractor’s field engineer during offshore execution.• Prepared feedback and lesson learnt statement through out T&I offshore campaign. Show less CONSTRUCTION SUBSTRUCTURE ENGINEER : November 2019 – March 2021Project & Project Size : KASAWARI GAS DEVELOPMENT PROJECT (JACKET)/ 8600 MTClient : PETRONASDetail Responsibilities: -1. To ensure the project deliver safely as per project schedule, budget and meet the requirement of the project in terms of; quality, reliability, operability and maintainability.2. Prepare Construction Workfront Sequence as per site arrangement base on Planning Schedule.3. Coordinate and lead the shiploose materials by liaising with engineering, offshore installation company, vendors, and warehouse focal.4. Closely monitor and guide the subcontractor for project execution and in line with Planning Master Schedule.5. Maintain a materials traceability system for issuance from warehouse to site.6. Monitoring work progress at site & always maintain safe working environment.7. Provide detail design on any site modification before submitting to client (Site Change Structural).8. Monitor and manage all materials required for bending/rolling work by closely coordinating the flow of process by raising Service Requisition until the execution of the plan.9. Coordinate with Engineering for specific procedure required during lifting/overturn.10. Prepare and conduct the Job Hazard Analysis (JHA) for Heavy Lifting (load > 20MT).11. Closely monitor and guide the subcontractor for project execution and in line with Planning Master Schedule.12. Plan and manage for utilities/facilities required for construction/erection at site.13. Manage material resources such as plate, beam, and pipe/tubular as stated in IFC14. Coordinate with QAQC department for welding sequence, NDT status, Punchlist and ITR activity15. Prepare the weekly progress report for structural discipline. Show less

      • Construction Engineer (Project Management Team)

        Aug 2021 - May 2022
      • Offshore Installation Engineer (T&I)

        Apr 2021 - Jul 2021
      • Structural Engineer

        Nov 2019 - Mar 2021
    • Shell

      Jun 2022 - now

      Asset supporting: Global Shell Lubricants• To coordinate and be the part in R&I review for one yearly and 5-yearly between site and global team.• To prepare all the latest equipment registered in SAP PM is available in the R&I Tool.• To modify and update any changes in equipment, task list, maintenance item and maintenance plan from SAP PM to the R&I Tool.• To assign all the equipment with the same specifications and criticality to the sub-group prior the R&I Plan review.• To keep track for any update on the Shell global preventive maintenance library for LOBP to be updated in the R&I Tool.• Closed coordination with the lubricant’s stakeholder in verifying all the assigned equipment to the sub-group.• To close all the action registers recorded during R&I Plan review and to prepare R&I Plan report.• Other scope: To be backup system for run and maintain of CMMS SAP to all LOBP Sites. Do all day-to-day requests from the stakeholder in registering or update new FLOC, equipments, task list, measuring point, maintenance item and maintenance plan if required. Show less Asset supporting: Shell Bukom• Maintaining day to day records of all projects for all final technical documents in DCC Master by processing Assai OPS-related activities such as Document Check Out, Check In, upload new document with metadata, assigning and consolidating a new document number to a project, generating a final closure report & etc.• Quality check of final technical documents as per VDR (Vendor Data Requirement as specified in PR), PR (Purchase Requisition), Tender Documents, Standard Specifications, VPTL Drawing Status Excel Sheet and preparing the DCC check list for validating completeness, correctness of Final Technical Documents.• Demonstrated proficiency with large-scale document control management software (Assai).Asset supporting: Shell Jurong Island• Successfully completing the 3D/DC support for MEG Project by delivering 380 PEFS and 7513 isometrics within the agreed timeline and budget.• Updated Assai cloud with new isometrics and replaced existing isometrics.• Completed document control support activities by coordinating with vendor and stakeholder to check and validate the missing information/documents in order to complete the 3D model designed by vendor.• Assign document numbers for some missing isometrics/new isometrics developed as part of the model and provide line numbers for missing line numbers in PEFS.• Replaced the existing isometrics with new isometrics extracted from the 3D model in Assai cloud.Asset supporting: Shell Scotford• Completing multiple engineering & drafting request (EDR) for electrical discipline drawing by following the standard procedure and performing quality check on the tasks performed.• Performed the Peer QC to ensure all EDR/MOC completed with high quality and within the KPI’s period. Show less

      • Reliability & Integrity (R&I) Engineer

        Dec 2023 - now
      • Engineer - Digital & Drawing Management

        Jun 2022 - Nov 2023
  • Licenses & Certifications

    • PTW - Permit Coordinator

      Malaysia Marine & Heavy Engineering
      Jun 2020
    • Authorized Gas Tester (AGT)

      NIOSH Certification Sdn Bhd
      Jul 2020
    • Authorized Entrant and Standby Person (AESP)

      NIOSH Certification Sdn Bhd
      Mar 2020
    • Basic Offshore Safety Induction & Emergency Training (with Emergency Breathing System) Travel Safely by Boat (OPITO Approved) + Compressed Air Emergency Breathing System (CA-EBS)

      OPITO
      Apr 2021
    • Offshore Safety Passport

      PETRONAS
      Apr 2021