Sivanandham Muruganandham

Sivanandham Muruganandham

QA/QC

Followers of Sivanandham Muruganandham309 followers
location of Sivanandham MuruganandhamSingapore

Connect with Sivanandham Muruganandham to Send Message

Connect

Connect with Sivanandham Muruganandham to Send Message

Connect
  • Timeline

  • About me

    Piping Inspection

  • Education

    • VHSS

      1990 - 1997
      Bachelor’s Degree Mechanical Engineering 7

      Activities and Societies: NSS

  • Experience

    • Keppel Offshore & Marine

      Jan 2010 - Mar 2012
      QA/QC

      QA/QC Engineer Head

    • Rotary Engineering Limited

      Dec 2012 - Apr 2015
      QA/QC ENGINEER

      QA/QC INSPECTOR

    • JTC Corporation

      Apr 2015 - Jul 2016
      CWI -Certified Welding Inspector

      Client inspection of pipe line welding inspection .welding work ,Ndt testing, leak testing, hydrostatic testing. review and approve the documents are drawing,PQR,WPS,WQT, check list Welding reports and testing reports

    • Sembcorp Marine Ltd

      Feb 2017 - now

      Responsibilities1) Review piping quality plan, ITP, project code, specification, P&ID, flow diagram, ISO and follow the test pack requirements.2) Review PQR, WPS, WQT, welding procedure, NDT procedure, quality testing procedure and MVR, mill certificate with fabrication approval. 3) Inspection liaise with client, owner done material inspection, FIT up, visual, borescope, dimensional, spool release and material traceability. 4) Inspection/witness liaises with client owner done Hardness, ferrite and PMI.5) Prepare/review inspection reports, NDT reports, testing reports and punch lists open/close out.6) Inspection liaise with client/owner done line walk, reinstatement ,pre commission system walk down ,GALT test, P&ID conformity and prepare punch lists. 7) Inspection/witness liaise with client ,owner done Hydro testing, Pneumatic test, Oil pressure testing and Flushing 8) Inspection/witness liaises with client, owner done torque tightening, review reports and certificate.9) Review/approval Final punch close out, test pack and dossier. Show less  Review drawing, Client specification, DNV rule, P&ID, ISO drawing, quality plan and Procedure, ITP and check lists, Test pack. Inspection material traceability as per Mill cert. and fit up joint configuration, documentation work reports as per drawing, client spec. ITP. Monitoring, record/ review welding parameters as per WPS approved.  Visual inspection, borescope inspection to pipe internal root heat- tint, documentation of reports and records. Meets requirements of Client and class DNV GL. As per client spec. ITP,ASME B31.3 Inspection/witnessing for Pre-Line-walk to punch list open/close as per drawing, P&ID, Test pack ITR. Inspection/witness to leak testing flushing test, Hydro testing, AIR testing N2, He as per ASME B31.3.Review pressure/temperature record chart. As per procedure spec., Test pack ITR. Inspection/Monitoring chemical cleaning pickling, neutralization and passivation, hot oil hot oil flushing as per P&ID, Test pack.Norsok L-004 Specification procedure. Inspection/witness internal reinstatements punch list open/close, Final reinstatements with clients and DNV as per drawing, P&ID, Test pack ITR. DAC walk for subsystem line/valve tag inspection to hand over to commissioning team, Client as per P&ID, Test pack. Inspection/witness pressure regulator, orifice, flow meter, globe, ball, DBB valves, and Pressure safety valves as per client spec. Inspect/review PWHT record chart. To prepare Punch list and close out of end products of hand over projects. Documents preparation WQT, PQR, WPS, welder performance record, welding WPS Monitoring record, Material verification Report, Fit up report, Visual inspection report, Pipe weld summary report, Material inspection traceability summary report, Pipe spool Release note. Documents preparation quality action issue record ,NCR, Punch list Show less

      • QA Engineer/Inspector

        Jan 2017 - now
      • QA/QC INSPECTOR

        Feb 2017 - Jun 2019
    • Keppel Shipyard Ltd., Singapore

      Jun 2019 - Apr 2020

      BW PARIS -FSRUOwner: GOLOR GIMI, BP. -FSRUCode: Clint specification, ASME 31.3, DNVGL.Responsibilities:• Review ISO drawing, P&ID, Client specification, code, Project Procedure, ITP, Test pack.• Inspection of piping Material , mill certificate, Material verification report –MVR as per client specification and code requirement• To perform inspection pipe fit up, visual weld joint, dimension & tolerance as per drawing Client spec. and owner code.• Preparation RFI to owner inspection. Verify the inspection report• Final inspection of pipe welded with owner as per drawing, specification, code.• Coordinate for Ndt, review the NDT report• Line walk inspection for pipe line as per ISO drawing, P&ID in test pack & punch list preparation.• Inspection flushing, Hydro testing, Pneumatic testing as per the test pack, specification and verify the report• Inspection Reinstatement as per the drawing limit in test pack, Prepare documentation. Show less Owner: GOLOR GIMI, BP.Code: Clint specification, ASME 31.3, DNVGL.Responsibilities:• Review ISO drawing, P&ID, Client specification, code, Project Procedure, ITP, Test pack.• Inspection of piping Material , mill certificate, Material verification report –MVR as per client specification and code requirement• To perform inspection pipe fit up, visual weld joint, dimension & tolerance as per drawing Client spec. and owner code.• Preparation RFI to owner inspection. Verify the inspection report• Final inspection of pipe welded with owner as per drawing, specification, code.• Coordinate for Ndt, review the NDT report• Line walk inspection for pipe line as per ISO drawing, P&ID in test pack & punch list preparation.• Inspection flushing, Hydro testing, Pneumatic testing as per the test pack, specification and verify the report• Inspection Reinstatement as per the drawing limit in test pack, Prepare documentation. Show less tion, ASME 31.3, DNVGL. Super duplex SSDuplex SS6MoCuNi 90/10SSA333/335UNS:32750,32760318033125470600316LP11,P12ER2594ER2209ERNiCrMo3ERCuNiER316 LE7018-1/ER80S-B2.ER90S-B9 Responsibilities:• Review ISO drawing, P&ID, Client specification, code, Project Procedure, ITP, Test pack.• Inspection of piping Material, mill certificate, Material verification report –MVR as per client specification and code requirement• To perform inspection pipe fit up, visual weld joint, dimension & tolerance as per drawing Client spec. and owner code.• Preparation RFI to owner inspection. Verify the inspection report• Final inspection of pipe welded with owner as per drawing, specification, code.• Coordinate for Ndt, review the NDT report• Line walk inspection for pipeline as per ISO drawing, P&ID in test pack & punch list preparation.• Inspection flushing, Hydro testing, Pneumatic testing as per the test pack, specification and verify the report• Inspection Reinstatement as per the drawing limit in test pack, Prepare documentation. Show less

      • Quality Assurance Engineer

        Jul 2019 - Apr 2020
      • QA engineer piping

        Jun 2019 - Apr 2020
      • Quality Assurance Engineer

        Jun 2019 - Apr 2020
  • Licenses & Certifications

    • CSWIP 3.1

      TWI -UK
      Jul 2012