Abubakar Siddiq

Abubakar Siddiq

Electrical Engineer

Followers of Abubakar Siddiq2000 followers
location of Abubakar SiddiqSaudi Arabia

Connect with Abubakar Siddiq to Send Message

Connect

Connect with Abubakar Siddiq to Send Message

Connect
  • Timeline

  • About me

    Electrical Site Manager/ Project Engineer

  • Education

    • Govt Institute of Technology Gujranwala

      2004 - 2007
      Associate's degree Instrumentation A
    • Govt High School Kalianwala

      1994 - 2004
      Matric Science A
    • COMSATS Institute of Information and Technology

      2015 - 2017
      Master’s Degree Project Management
    • The University of Lahore

      2008 - 2012
      Bachelor’s Degree Electrical Engineering A
  • Experience

    • Alstom Power

      Apr 2013 - Oct 2013
      Electrical Engineer

      Client:Saudi Electricity CompanyTiyyam 2 substation Madinha & Nuzah Substation Makkah• Installation of Protection Relays, Auxiliary Relays, Circuit Breaker, CT, CP, • Different type of meters, Selector switches etc. • Wiring of different equipment in panels according to drawing.• Function test of Protection Panels.• Study and Modified the Electrical drawings • Check and Test complete panels according to drawing.

    • Siemens

      Nov 2013 - now

      Client: National GridSite Manager Yanbu North-2 S/S to 110 KV GIS (SWCC) underGround 110 KV power and Fiber optic cable.•Managing all activities related to Project Management like resource planning, material procurement of various equipment's, scheduling, monitoring the progress and ensuring that the project is executed in time and within set budgeted cost.•Maling routine daily inspection of the worksite to see that compliance with safety procedure is observed.•Responsible for testing the electrical components and witness with SEC-CSD, Marafiq engineers.•Identifying critical activities for the project and giving topmost attention to resolve them within the scheduled time to avoid possible bottlenecks and delays in execution.•Budgeting, planning and indenting and mobilization of materials and manpower as per the requirement.•Coordinating with external agencies, clients, consultants for design, specs & change management. •Coordinating with Client, Subcontractor, suppliers and following up the progress at the site.•Following up site requirements regarding civil, electromechanical and electrical and ensure customer requests are taken care.•Following up site progress, mark up, As-built drawings & conversion into SEED II SEC standard as per time schedule to meet the deadlines of the project.•Discussing Invoicing plan and revenue plan with Project Controllers.•Meetings with the client regarding progress, invoicing and hurdles coming in the project.•Responsible for arranging FAT tests.•Responsible for arranging witness for testing.•Perform all required safety procedures.•Preparartion and follow up NCR by concerned supplier or manufacturer. Show less Client: National GridQA/QC Electrical EngineerYanbu North to Yanbu north-2 S/S & Yanbu North-2 to 110 GIS (SWCC) underGround 110 KV power and Fiber optic cable.1.Organize, implement, conduct and manage the QA/QC Programs.2.Coordinate the document controls of technical submittals, drawings, etc with the Project Team and to ensure that the QA/QC validation has been done, to ensure their issue, amendments and recall of controlled documents.3.Coordinate all inspections, monitor the required tests and record inspections and tests made pas the Contract Plan and Contract Specifications.4.Liaise with the Client’s representatives for the conduct of day-to-day quality related project activities.5.Coordinate with the Project Manager regarding work performance and hold authority to stop work in any area where discrepancies remain uncorrected and/or cancel the stop work order upon satisfactory correction of noted deficiencies.6.Provide technical support to the Project Manager and guidance to site staff in submission of materials for approval, request for inspection, shop drawings, As-built drawings, O & M manual.7.Assist QA/QC Manager in conducting internal quality audits.8.Ensure that Non-Conformance Report (NCR) are raised once the activities deviated from the Contract Specifications.9.Coordinate with the project staff to compile and maintain pertinent records of inspection and testing until end of the contract and all pertinent records for retention on completion of the project.10. Attend Monthly Project Review Meetings (PRM) and alert the project team of any potential problems.9-Site Inspection RFI’s preparation and coordination with consultant ( Materials , Electrical , Mechanical ) Show less Client:Saudi Electricity Company 132 KV Jizan University substation.1. Documentation of daily work progress and maintaining quality control protocols of site working.2. Civil work supervision of 132kv grid station i.e. Control house building and foundation for switch yard equipment.3. Mechanical erection of gantries, earth mast, steel structure for equipment. power transformer, C.B, C.Ts, P.Ts, Surge Arrester, Line Trap, Isolaters, panels and grounding mesh engineering for building and switch yard lighting protection.4. Cable layying & Termination designing according to schematic diagram and testing to ensure connection.5. Dehydration of transformer, Commissioning of C.Bs, C.Ts, P.Ts, Surrge arrester, Line Trap, Line isolators, capacitor bank and battery bank.6. Stringing of bus bar and earth shield wire.7.Raise the RFI's,RMI's.8.Make the NCR,MDR reports.9.Red mark up Drawing.10.Inspect all the work Mechanical,Civil,and Electrical according to the schematic. Show less

      • Electrical Site Manager/ Project Engineer

        Nov 2018 - now
      • SITE MANAGER

        Jul 2018 - Oct 2018
      • SITE MANAGER

        May 2016 - Jul 2018
      • QA/QC Electrical Engineer

        Aug 2014 - May 2016
      • QA/ QC Electrical Engineer

        Nov 2013 - Aug 2014
  • Licenses & Certifications

    • Basic Electrical Safety & Lock-out/Tag-out

      Siemens
    • Project Management Professional-PMP

    • Work Zone Traffic Safety

      Siemens