Serag Fayed

Serag Fayed

Electrical Maintenance Engineer

Followers of Serag Fayed430 followers
location of Serag FayedCairo, Egypt

Connect with Serag Fayed to Send Message

Connect

Connect with Serag Fayed to Send Message

Connect
  • Timeline

  • About me

    Railway Major Equipment Installation Engineer, worked in Metro, High Speed Rail and Monorail.

  • Education

    • Faculty of Electronic Engineering, Menoufia University

      2015 - 2020
      Bachelor of Engineering - BE Automation and Control Engineer
  • Experience

    • MOHM Office Furniture

      Jun 2018 - Nov 2019
      Electrical Maintenance Engineer

      Learning the maintenance engineering process, the technical understanding for the equipment electricity feeding, classic control panels design and execution, scheduling the preventive maintenance based on the operation and production cycle.

    • The Arab Contractors

      Sept 2020 - Nov 2023

      High Speed Rail consortium (Arab contractors - Siemens - Orascom)Following up and cooperating with SIEMENS Mobility and ORASCOM Constructions our consortium partners to execute and install the Traction Power Supply System, power cables, control cables and panels installation between the power system components.Following MEP design of the power stations buildings and providing the requirements to the designer to achieve the client needs.Performing site visits to evaluate the site conditions to plan a schedule and have a vision for the possibility of the work execution starting, also to have a suitable vision about the cable laying and routing from the traction power station to the Overhead Catenary System (OCS).Participating in workshops with the consortium partners to have a well understanding about the OCS installation to understand the different methods of system installation and cables pulling.Attending technical and managerial meetings to represent the work of our team in the rail electrification site team.Dealing and evaluating subcontractors works for the related electrical works.Preparing work status reports in a periodic bases to the management. Show less Cairo metro Joint venture (Arab contractors - Colas Rail - Orascom)Installation of El-Salam Depot equipment in greater Cairo metro line 3 Phase 4B, Dealing with suppliers from several companies from allover the world in all installation testing and commissioning and maintenance stages, attended and performed SAT with the client, supervised the PTO punch list coverage, prepared BOQs and PRs for the materials needed to cover the client comments.Participated in Computerized Maintenance Management System network preparation with the supplier, also preparing the technical information required to generate the job plans, work orders and work flows on the Computerized Maintenance Management System. Show less

      • Rail Electrification Team Leader

        Jan 2022 - Nov 2023
      • Railway Depot Equipment Engineer

        Sept 2020 - Mar 2023
    • Alstom

      Oct 2023 - Apr 2024
      Depot Equipment Installation Engineer
    • Siemens

      Apr 2024 - now
      Power Supply Systems Installation Supervisor
  • Licenses & Certifications

    • Human resources management

      Builders Organization
    • ISTQB

      Udemy
  • Volunteer Experience

    • Menofia University chairman of Rezk Halal Campaign

      Issued by Life Makers Foundation on Dec 2017
      Life Makers FoundationAssociated with Serag Fayed
    • Faculty of Electronic Engineering Virus C campaign team leader

      Issued by Life Makers Foundation on Nov 2017
      Life Makers FoundationAssociated with Serag Fayed